Successfully reported this slideshow.
Your SlideShare is downloading. ×

Dublin bus 2011

Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad

Check these out next

1 of 15 Ad

More Related Content

Slideshows for you (19)

Advertisement

Similar to Dublin bus 2011 (20)

Advertisement

Recently uploaded (20)

Dublin bus 2011

  1. 1. North West Area Committee 21.10.11 Network Direct Process
  2. 2. Future for Bus Transport <ul><li>Priorities </li></ul><ul><li>Strategic Reform of Route Network </li></ul><ul><li>Continued strong focus on getting key bus priorities </li></ul><ul><li>Implement AVLC system to give Real Time Information on mobile, website and on-street. </li></ul><ul><li>Implement full Integrated Ticketing System </li></ul><ul><li>Improved Efficiency </li></ul><ul><li>Strong Marketing Campaigns </li></ul>
  3. 3. Background <ul><li>Deloitte Report January 2009 examined cost efficiency of Dublin Bus </li></ul><ul><li>Found Company as efficient as peers </li></ul><ul><li>Network was found to be too complex </li></ul><ul><li>List of recommendations </li></ul><ul><li>Full time Project Team set up to carry out the network review and implement revised bus network </li></ul>
  4. 4. PRINCIPLES OF NETWORK REVIEW <ul><li>Redesign network based on customer demand </li></ul><ul><li>Provide more direct services </li></ul><ul><li>Combine route legs </li></ul><ul><li>Meet unmet demand on current network </li></ul><ul><li>Provide more frequency based timetables </li></ul><ul><li>No duplicate departures </li></ul><ul><li>Develop consistent headways between departures </li></ul><ul><li>Continue to provide value for money </li></ul>
  5. 5. <ul><li>Agreed with Department of Transport and National Transport Authority </li></ul><ul><li>Part of Public Service Contract </li></ul><ul><li>Implementation must be delivered in order to meet terms of contract </li></ul>Principles
  6. 6. DATA ANALYSIS Predicting Travel Demands <ul><li>Dublin Bus has used the most up to date data available to predict travel demand </li></ul><ul><li>Most comprehensive and in-depth review of the bus network in Dublin ever conducted </li></ul>
  7. 7. Census Data Analysis <ul><li>Census Data 2006 journey to work (morning peak 7-10) </li></ul><ul><li>Travel patterns of One Million people </li></ul><ul><li>Origin/Destination patterns from above census analysed by DTO for all modes of transport </li></ul>
  8. 8. CSO 2006 Data formatted into radial corridors
  9. 9. CSO 2006 Data formatted into orbital clusters
  10. 10. Dublin Bus Data <ul><li>Existing Customer boarding patterns identified from Dublin Bus ticketing and smartcard information – up to 500,000 customer movements per day tracked </li></ul><ul><li>Modelled two way flows to develop boarding & alighting patterns </li></ul><ul><li>Journey time analysis also undertaken to ensure operation of services reflected traffic environment </li></ul><ul><li>Supplementary surveys as required </li></ul>
  11. 11. North West Changes <ul><li>19a renamed 19 and extended to Charlestown SC </li></ul><ul><li>Operates on Beneavin Road both directions </li></ul><ul><li>Improved frequency of service </li></ul><ul><li>Customer focused timetables </li></ul><ul><li>Strong position for growth and promotion </li></ul>
  12. 12. North West Changes <ul><li>Route 83 & 19 amalgamated </li></ul><ul><li>Operates Sycamore/Grove Park, Glasanaon, Tolka Estate Road and Glasnevin Hill </li></ul><ul><li>Customer focused timetables </li></ul><ul><li>Operates 10 minute peak, 15 minute daytime </li></ul><ul><li>Old 83 and 19 unsustainable in long term given passenger numbers and common route northside </li></ul><ul><li>Revised 83 places route in strong position for growth as a high frequency service </li></ul><ul><li>Now operates with low floor technology buses </li></ul>
  13. 13. North West Changes <ul><li>Route 13 & 13a amalgamated </li></ul><ul><li>Now operates full cross city via Dame St and Inchicore to Clondalkin </li></ul><ul><li>Faster journey times to City from Poppintree </li></ul><ul><li>Strong connection with Drumcondra Rail Station </li></ul><ul><li>Operates 12 minute peak and 15 minute daytime </li></ul><ul><li>Route 220 extended to Coultry and serves Deanstown/Scribblestown </li></ul><ul><li>17a serves Beaumont, Cappagh and Connolly Hospitals </li></ul><ul><li>17a also serves Blanchardstown Centre </li></ul>
  14. 14. North West Changes <ul><li>Route 4 operates every 15 minutes </li></ul><ul><li>Now operates with low floor double deck buses </li></ul><ul><li>Route 11/a/b amalgamated an operates as route 11 </li></ul><ul><li>All services now operate to Sandyford Industrial Estate </li></ul><ul><li>Route 140 to be extended to Rathmines </li></ul><ul><li>No change to northside of route </li></ul>
  15. 15. North West Changes <ul><li>Route 40/40a to be amalgamated </li></ul><ul><li>Finglas South and West will be connected with Finglas Village </li></ul><ul><li>Route 40d will serve Finglas Village </li></ul><ul><li>Faster Journey times to city </li></ul><ul><li>Significantly improved city centre penetration for Finglas </li></ul><ul><li>Full cross city service on revised 40 via O’Connell Street, Dame Street, St James Street and Ballyfermot to Liffey Valley </li></ul>

×