Paz Ground Segment

  1. 1. PAZ GROUND SEGMENTINTA, 27 of October of 2011PGS Team - INTA
  2. 2. Index Introduction The National Program of Earth Observation (PNOTS) INTA responsabilities PAZ Ground Segment: Deployment Operational Concept The nominal ground segment Flight Operation Segment Payload (SAR) Data Ground Segment Data Take workflow Basic ProductsINTA, 27.10.2011 Pag.: 2
  3. 3. INTRODUCTION PNOTS PROGRAMA NACIONAL DE OBSERVACION DE LA TIERRA POR SATELITE INGENIO PAZ OPTICAL SATELLITE SAR SATELLITE Launch: 2014 LAUNCH: 2012 GROUND SEGMENTINTA, 27.10.2011 Pag.: 3
  4. 4. INTA responsabilities PAZ GROUND SEGMENT THE INTA OWN INFRASTRUCTURES: TORREJÓN AND MASPALOMAS OPERATION ( IN COORDINATION WITH HISDESAT)INTA, 27.10.2011 Pag.: 4
  5. 5. Ground Segment Deployment NOMINAL CENTRE BACKUP CENTRE INTA-TORREJON INTA-MASPALOMAS TORREJON MASPALOMAS DEFENSE CENTREINTA, 27.10.2011 Pag.: 5
  6. 6. PGS – Operational Concept INTA TORREJÓN INTA MASPALOMAS Nominal Backup Civil user request management Satellite monitoring, control Satellite control, planning and monitoring S-Band TC upload / S-X Band TM S-Band TC upload / S-X Band TM download download Civil product generation and archive TM transmission to nominal/defence centre HISDESAT: Commercial ServicesScientificquota of INTA Defence users DEFENCE CENTRE Civil UsersINTA, 27.10.2011 Pag.: 6
  7. 7. PAZ GROUND SEGMENT- INTA NOMINAL CENTER INTA-TORREJÓN NOMINAL CENTERINTA, 27.10.2011 Pag.: 7
  8. 8. Infraestructures - DiseñoNew Building for the INTASpace Operation Centre(I-SOC)More than1600 m2 to provideservice to INTA missions, andespecially to PAZ and INGENIO.Special security means (defenseusers)Energy effectiveness designHigh performances installations,UPS >1000 KVAINTA, 27.10.2011 Pag.: 8
  9. 9. InfrastructuresINTA, 27.10.2011 Pag.: 9
  10. 10. InfrastructuresINTA, 27.10.2011 Pag.: 10
  11. 11. Nominal Ground StationINTA, 27.10.2011 Pag.: 11
  12. 12. Ground StationINTA, 27.10.2011 Pag.: 12
  13. 13. PAZ NOMINAL GROUND SEGMENT PAZ NOMINAL GROUND SEGMENT FOS PDGS Flight Operations Payload Data Segment Ground SegmentINTA, 27.10.2011 Pag.: 13
  14. 14. PAZ NOMINAL GROUND SEGMENT PAZ SPACE SEGMENT PAZ SATELLITE PGS S-Band X-Band TC/TM TM DT Orders FOS PDGS Mission Plan Flight Operations Payload Data Segment DT Files Ground Segment Request PAZ Product deliveryINTA, 27.10.2011 Pag.: 14
  15. 15. PAZ GROUND SEGMENT NOMINAL FLIGHT OPERATIONS SEGMENT ARF SMC G/S Secure Management Acquisition & Ground Station Centre Routing Facility M&C FOCC Monitoring & Flight Operations Control Control CentreINTA, 27.10.2011 Pag.: 15
  16. 16. PAZ NOMINAL GROUND SEGMENT Second level data format synchronization Routing of X-Band TM to civilian/military FLIGHT OPERATIONS SEGMENT PDGS G/S Ground Station M&C Civil Monitoring & Control Defense ARF Acquisition & Routing Facility FOCC Flight Operations Control Centre SMC Secure Management CentreINTA, 27.10.2011 Pag.: 16
  17. 17. PAZ NOMINAL GROUND SEGMENT Security keys management for encryption/ decryption of TC / TM FLIGHT OPERATIONS SEGMENT G/S Ground Station M&C Monitoring & Control ARF Acquisition & Routing Facility FOCC Flight Operations Control Centre SMC Secure Management CentreINTA, 27.10.2011 Pag.: 17
  18. 18. PAZ NOMINAL GROUND SEGMENT Satellite operations, commanding, planning, monitoring, HK/TM processing, FLIGHT OPERATIONS SEGMENT orbital determination and control G/S Ground Station M&C Monitoring & Control ARF Acquisition & Routing Facility FOCC Flight Operations Control Centre SMC Secure Management Centre MPF Mission Planning Facility MCS Mission Control System FDS Flight Dynamics System SSIM Spacecraft Simulator IOINTA, 27.10.2011 Instrument Operation Pag.: 18
  19. 19. PAZ NOMINAL GROUND SEGMENT Monitoring & control of FOS facilities FLIGHT OPERATIONS SEGMENT G/S Ground Station M&C Monitoring & Control ARF Acquisition & Routing Facility FOCC Flight Operations Control Centre SMC Secure Management CentreINTA, 27.10.2011 Pag.: 19
  20. 20. PAZ NOMINAL GROUND SEGMENT PAYLOAD DATA GROUND SEGMENT CalVal MUS PDS Calibration & Master User Services Payload Data System Validation MAC PM Mission Archive Performance and Catalogue MonitoringINTA, 27.10.2011 Pag.: 20
  21. 21. PAZ NOMINAL GROUND SEGMENT Creation, validation of the user requests PAYLOAD DATA GROUND SEGMENT Catalogue browser MUS Master User Services MAC Mission Archive and Catalogue PDS Payload Data System PM Performance Monitoring CalVal Calibration & ValidationINTA, 27.10.2011 Pag.: 21
  22. 22. PAZ NOMINAL GROUND SEGMENT Ingestion, processing, temporary archive and circulation of internal data and PAZ PAYLOAD DATA GROUND SEGMENT Products MUS Master User Services MAC Mission Archive and Catalogue PDS Payload Data System PM Performance Monitoring CalVal Calibration & Validation PAZ SAR ProcessorINTA, 27.10.2011 Pag.: 22
  23. 23. PAZ NOMINAL GROUND SEGMENT Calibration and Verification of the system, Instrument & Data Take monitoring & maintenance PAYLOAD DATA GROUND SEGMENT Experimental operation Scientific use of the mission MUS Master User Services MAC Mission Archive and Catalogue PDS Payload Data System PM Performance Monitoring CalVal Calibration & Validation Calibration PAZ SAR Processor CalVal Verification Range and azimuth location, Internal calibration characterization and correction Antenna model validation & optimization Expert IO Radiometric calibration Performance characterization & validationINTA, 27.10.2011 Pag.: 23
  24. 24. PAZ NOMINAL GROUND SEGMENT Permanent storage of the complete PAZ PAYLOAD DATA GROUND SEGMENT Mission data and products MUS Master User Services MAC Mission Archive and Catalogue PDS Payload Data System PM Performance Monitoring CalVal Calibration & Validation PAZ SAR Processor Expert IOINTA, 27.10.2011 Pag.: 24
  25. 25. PAZ NOMINAL GROUND SEGMENT Performance monitoring of the complete PAYLOAD DATA GROUND SEGMENT PDGS MUS Master User Services MAC Mission Archive and Catalogue PDS Payload Data System PM Performance Monitoring CalVal Calibration & Validation PAZ SAR Processor Expert IOINTA, 27.10.2011 Pag.: 25
  26. 26. DATA ACQUISITION WORKFLOW New Acquisition Request Catalogue Request New Processing Level RequestINTA, 27.10.2011 Pag.: 26
  27. 27. DATA TAKE REQUEST FLight Dynamics User Services Satellite Control Planning Defense User ServicesINTA, 27.10.2011 Pag.: 27
  28. 28. PRODUCT GENERATION WORKFLOW Delivery FLIGHT MCS DYNAMICS PRODUCTS PDS GENERATION Archive & Catalogue PRODUCTS ROUTING Delivery RAW DATA PRODUCTS PDS GENERATION Archive & CatalogueINTA, 27.10.2011 Pag.: 28
  29. 29. PROCESSING LEVELS - Level 0: Raw Data Annotations QUICKLOOK LEVEL 0 Raw Data SSC MGD GEC EECINTA, 27.10.2011 Pag.: 29
  30. 30. MODES & PROCESSING LEVELS SCANSAR SIZE: 100 x 100 km Resolution: <16 m DLR Test Raw Data SSC GEC EEC DEM © INTA 2011 PSP Product EEC (Enhanced Ellipsoid Corrected)INTA, 27.10.2011 Pag.: 30
  31. 31. MODES & PROCESSING LEVELS STRIPMAP SIZE: 30 x 30 km Resolution: <3 m DLR Test Raw Data SSC © INTA 2011 PSP Product GEC EEC SSC (Single Look Slant Range Complex )INTA, 27.10.2011 Pag.: 31
  32. 32. MODES & PROCESSING LEVELS SPOTLIGHT SIZE: 10 x 10 km Resolution: <2 m DLR Test Raw Data SSC Ellipsoid GEC EEC © INTA 2011 PSP ProductINTA, 27.10.2011 GEC (Geocoded Ellipsoid Corrected) Pag.: 32
  33. 33. MODES & PROCESSING LEVELS HIGR RESOLUTION SPOTLIGHT SIZE: 5 x 5 km Resolution: 1 m © INTA 2011 DLR Test Raw Data PSP Product SSC GEC EECINTA, 27.10.2011 Pag.: 33
  34. 34. MODES & PROCESSING LEVELS STRIPMAP DUAL POLARIZATON SIZE: 15 x 15 km Resolution: <6 m DLR © INTA 2011 Test Raw Data PSP Product SSC GEC EEC DEM EEC (Enhanced Ellipsoid Corrected)INTA, 27.10.2011 Pag.: 34
  35. 35. www.inta.esINTA, 27.10.2011 Pag.: 35

×