South-South Cooperation     Opportunities                 Dario Hidalgo                      EMBARQ
SSC Why?Rapid urban growth and motorization  Congestion, energy consumption, air  pollution, road fatalities and injuries,...
BRT and busway systems in the world               evolution of the # of cities and km per decade         3741 km          ...
BRT and busway systems in the world                     Evolution of the number of cities per year             25         ...
Photo: URBS       Curitiba, RIT  Initial Corridor 1972    Full BRT in 1982      Photo: URBS
Quito, Metrobús-QPhoto: D. Hidalgo EMBARQ                           Initial corridor 1995
Bogota, TransMilenio                Initial Corridor 2000Photo: EMBARQ
Istanbul Metrobus                           Initial Corridor 2008Photo: D. Hidalgo EMBARQ
Ahmedabad Janmarg               Initial Corridor 2009Photo: CEPT
GuangzhouInitial Corridor 2010
Mexico Metrobús  Line 4 2012                  Photo: CTS EMBARQ Mexico
México City         Metrobús      6 years, 95 km     614,000 pax/day    +105 km 2013-2018http://www.metrobus.df.gob.mx/map...
Rio de Janeiro, TransoestePhoto: EMBARQ Brasil                                 2012
Rio de Janeiro, TransoestePhoto: EMBARQ Brasil                                 2012
Rio de Janeiro150 km planned 2012-2016
http://www.metroenbogota.com/wp-content/uploads/2012/08/transmilenio-hasta-el-aeropuerto-el-doraro.jpg                Bogo...
TransMilenio, Bogotá     104 km BRT, Integrated System 7 million trips per day http://www.surumbo.com/paginas_php3/loadinf...
Central StationUrban Renewal    Project  (TOD under construction)
BRT showcases effective south-     south cooperation:  High performance, low cost, rapid  implementation, positive impacts...
Outstanding issuesWhat is BRT? or types of BRT?Comparison with alternatives – Tram, LRT, Metro;What is the niche for BRT?L...
SSC How?Information exchange  Web material, webinars  Conferences  PublicationsCollaborative research  Observatories  Case...
www.embarq.org
www.sibrtonline.org   www.brt.cl
SIBRT: 19 Public Agencies from 8 Countries
Asia BRTSAhmedabad        JakartaSurat            ManilaIndore           CebuJaipur           BangkokDelhi            Dhak...
Filename/RPS Number
South-South Collaboration, Presentation to the ADB
Upcoming SlideShare
Loading in …5
×

South-South Collaboration, Presentation to the ADB

901 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
901
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
25
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

South-South Collaboration, Presentation to the ADB

  1. 1. South-South Cooperation Opportunities Dario Hidalgo EMBARQ
  2. 2. SSC Why?Rapid urban growth and motorization Congestion, energy consumption, air pollution, road fatalities and injuries, lack of physical activityLimited funding, capacityBut very good ideas and practices (e.g): Sustainable mobility oriented development Sustainable transport – health and road safety Innovate finance – PPP, TDM Bus Rapid Transit and Integrated Public Transport
  3. 3. BRT and busway systems in the world evolution of the # of cities and km per decade 3741 km 905 km Before 1990 (14 cities) 493 km 1990 s (19 cities)Total length Since 2000 (114 cities) source: BRTdata.org, October, 2012
  4. 4. BRT and busway systems in the world Evolution of the number of cities per year 25 150 2010: Guangzhou, Hefei, Yancheng, Zaozhuang – China; Jaipur - India; Bangkok - Thailand; East London Transit – UK; Barranquilla, Bucaramanga – Colombia; 125 20 Cumulative Number of Cities Ecatepec- Mexico; Lima - Peru; Brampton – Canada; … 100 15New Cities 75 2000: Bogotá 10 (TransMilenio), Colombia 50 5 1974: Curitiba 25 0 0 1970 1975 1980 1985 1990 1995 2000 2005 2010 source: BRTdata.org, October, 2012
  5. 5. Photo: URBS Curitiba, RIT Initial Corridor 1972 Full BRT in 1982 Photo: URBS
  6. 6. Quito, Metrobús-QPhoto: D. Hidalgo EMBARQ Initial corridor 1995
  7. 7. Bogota, TransMilenio Initial Corridor 2000Photo: EMBARQ
  8. 8. Istanbul Metrobus Initial Corridor 2008Photo: D. Hidalgo EMBARQ
  9. 9. Ahmedabad Janmarg Initial Corridor 2009Photo: CEPT
  10. 10. GuangzhouInitial Corridor 2010
  11. 11. Mexico Metrobús Line 4 2012 Photo: CTS EMBARQ Mexico
  12. 12. México City Metrobús 6 years, 95 km 614,000 pax/day +105 km 2013-2018http://www.metrobus.df.gob.mx/mapa.html
  13. 13. Rio de Janeiro, TransoestePhoto: EMBARQ Brasil 2012
  14. 14. Rio de Janeiro, TransoestePhoto: EMBARQ Brasil 2012
  15. 15. Rio de Janeiro150 km planned 2012-2016
  16. 16. http://www.metroenbogota.com/wp-content/uploads/2012/08/transmilenio-hasta-el-aeropuerto-el-doraro.jpg Bogotá, TransMilenio Phase III & Citywide Integrated System 2012
  17. 17. TransMilenio, Bogotá 104 km BRT, Integrated System 7 million trips per day http://www.surumbo.com/paginas_php3/loadinfo.php3?InaNuIdMn=311&IngNuEleE=2& nav=1http://www.surumbo.com/paginas_php3/loadinfo.php3?InaNuIdMn=311&IngNuEleE=2&nav=1
  18. 18. Central StationUrban Renewal Project (TOD under construction)
  19. 19. BRT showcases effective south- south cooperation: High performance, low cost, rapid implementation, positive impacts Examples have inspired rapid uptake in varied geographies Expertise exchange: LAC, Asia, Africa and back
  20. 20. Outstanding issuesWhat is BRT? or types of BRT?Comparison with alternatives – Tram, LRT, Metro;What is the niche for BRT?Land use integration – safe access?Road Safety – Health – Climate Change?Quality of service – subsidies - finance?PPP contracts, incentives, control?… Need to continue working in these and other issues
  21. 21. SSC How?Information exchange Web material, webinars Conferences PublicationsCollaborative research Observatories Case StudiesStudy toursTrainingExperts/staff exchange, peer-to-peerlearning
  22. 22. www.embarq.org
  23. 23. www.sibrtonline.org www.brt.cl
  24. 24. SIBRT: 19 Public Agencies from 8 Countries
  25. 25. Asia BRTSAhmedabad JakartaSurat ManilaIndore CebuJaipur BangkokDelhi DhakaPimpri-Chinwad LahoreHubli-Dharwad ColomboBangalore HanoiMumbai ……
  26. 26. Filename/RPS Number

×