CME Warehouse - temperature & humidity controlled storage of regulated product, also include the HVAC system in the Retained Sample Store (existing R22 plant obsolete)

Published in: Business, Technology
  • Be the first to comment

Global Pharmaceutical Manufacturer – Memphis – Tennessee

  1. 1. EECO2 Case StudyGlobal Pharmaceutical Manufacturer – Memphis – TennesseeCME Warehouse - temperature & humidity controlled storage of regulated product, also include the HVAC system in the Retained Sample Store (existing R22 plant obsolete)
  2. 2. Benefits:Delivering Global Energy Saving SolutionsThe core expertise & experience within EECO2 is not the usual Consultant format as we all come from a design & buildbackground, commercially grounded and totally focused upon the identification & cost effective delivery of identifiedenergy savings.Core Objective of all services:Use our acquired experience & knowledge to provide cost effective, energy & emission reduction solutions from initialopportunity identification through implementation & verification of savings delivered globally.Actual Verified Benefits: Energy savings delivered = 1.95m kWhr/pa Energy cost savings = $135,000 Emissions reduction = 917 te CO2 Simple pay back = 1.5 years Capital cost avoidance from not replacing Retained Sample Store HVAC = $35,000EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: info@eeco2.co.uk
  3. 3. About the Project:Facility: CME Warehouse - temperature & humidity controlled storage ofregulated product, also include the HVAC system in the Retained Sample Store(existing R22 plant obsolete)Issue: Very high energy demand driven by original HVAC design & layoutBrief: Reduce energy demand without compromising on ComplianceSolution: • Reduce existing air change rates• Reduce existing fresh air volume• Install 2 new VSD’s to the 100kw supply air fans• Replace the existing supply air diffusers to improve air distribution• Use existing warehouse HVAC system to serve Retained Sample Store• Risk based approach to mitigate potential “out of condition” impactEEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: info@eeco2.co.uk
  4. 4. Conclusion and Comments: Conclusion: EECO2 supported HVAC design review, project scoped out & local contractors bid to complete project – project let & successfully completed Site Energy Manager Comments: “This project was key for delivering the sites 2010 energy target. It exemplifies how the proper air flow & fresh air can contribute significant energy savings. This type of project will be replicated in the remaining areas of our Facility” Site Energy ManagerEEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: info@eeco2.co.uk
  5. 5. Contact Details:General Enquiries & Sales Connect with us:Tel: +44 (0) 1625 660 717Email: info@eeco2.co.uk Follow us on LinkedinTechnical Support Like us on FacebookTel: +44 (0) 1625 660 717Email: info@eeco2.co.uk Follow us on TwitterEEC02 Limited Add us on Google PlusSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JN

×