Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Extreme Long Penetrator (C38r) Sewer Nozzle Assembly

814 views

Published on

For smaller pipes

  • Be the first to comment

  • Be the first to like this

Extreme Long Penetrator (C38r) Sewer Nozzle Assembly

  1. 1. C38r Starter Kit Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º How to build your custom C38r Direct Hit assemblies 100 MM 150 MM 225 MM PCT/AU2012/000326 Add on no 3 is the safety pipe DIRECT HIT® © Copyright Jim Paris 2013 M: 21 09 14 www.DirectHitSewerNozzles.com
  2. 2. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º 100 MM 150 MM 225 MM PCT/AU2012/000326 Add on no 3 is the safety pipe M: 21 09 14 The C38R works in any of the 100mm pipe combinations shown below except red. DIRECT HIT® cannot go down the red arrows. red arrows. in 100mm lines C38R cannot go down the 24º Extreme root penetrator PCT/AU2012/000326 front 24º and back 30° C38r Starter Kit
  3. 3. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º 100 MM 150 MM 225 MM PCT/AU2012/000326 Add on no 3 is the safety pipe M: 21 09 14 C38R in 100mm lines (cut with front turbo nozzle) Cut Clean tree roots drain FAST walls Unblock grease, soap etc. Remove sand from lines & grates Harden deposits, lime, cement etc. Ice in drains Adjust assembly to suit 100, 150 & 225 lines Clean manholes, shafts, pits & hydro excavate C38r Starter Kit Penetrate tree roots FAST YES YES YES YES YES YES YES NO YES YES cut, clean & adjust with front turbo nozzle and flush from back jets C38R in 100 mm lines (what can it go through, around, up or down) 80 mm using 03 Hose 90 mm using 03 Hose 100 mm using 03 or 04 Hose 100 mm using 03 or 04 Hose 100 mm using 03 or 04 Hose 100 mm using 03 or 04 Hose 100 mm using 03 or 04 Hose 50 mm Min Access No 50 mm Bend 150 mm using 03 or 04 Hose NO NO NO YES YES YES YES YES YES
  4. 4. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º 100 MM 150 MM 225 MM PCT/AU2012/000326 Add on no 3 is the safety pipe M: 21 09 14 The C38R front turbo nozzle works in any of the 150mm pipe combinations shown below. DIRECT HIT® in 150mm lines C38R 24º Extreme root penetrator PCT/AU2012/000326 front 24º and back 30° C38r Starter Kit
  5. 5. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º 100 MM 150 MM 225 MM PCT/AU2012/000326 Add on no 3 is the safety pipe M: 21 09 14 C38R 24º in 150mm lines (cut with front reverse turbo nozzle) Clean drain walls Unblock grease, soap etc. Remove sand from lines & grates Harden deposits, lime, cement etc. Ice in drains Adjust assembly to suit 100, 150 & 225 lines Clean manholes, shafts, pits & hydro excavate Cut tree roots FAST C38r Starter Kit Penetrate tree roots FAST YES YES YES YES YES YES YES NO YES YES cut, clean & adjust with front turbo nozzle and flush from back jets C38R in 150 mm lines (what can it go through, around, up or down) 80 mm using 03 Hose 90 mm using 03 Hose 100 mm using 03 or 04 Hose 100 mm using 03 or 04 Hose 150 mm using 03 or 04 Hose 100 mm using 03 or 04 Hose 100 mm using 03 or 04 Hose 50 mm Min Access No 50 mm Bend 150 mm using 03 or 04 Hose NO NO YES YES YES YES YES YES YES
  6. 6. C38r Starter Kit Add on no:1 and make a Cap Kit Add on no: 2 are the rings Add on no 3 is the safety pipe To make the C38r assembly take your C38r carriage PCT/AU2012/000326 Front view Back view Side view 24º 100 MM 150 MM 225 MM
  7. 7. From your Starter kit take the front nozzle 24º PCT/AU2012/000326 Add on no:1 and make a Cap Kit Add on no: 2 are the rings 100 MM 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  8. 8. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 100 MM 150 MM 225 MM Screw them together with spanners provided in the starter kit 24º PCT/AU2012/000326 Add on no 3 is the safety pipe top view C38r Starter Kit
  9. 9. 24º PCT/AU2012/000326 Connect hose Add on no:1 and make a Cap Kit Add on no: 2 are the rings 100 MM 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  10. 10. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º PCT/AU2012/000326 Place assembly in the pipe 100 MM 150 MM 225 MM Add on no 3 is the safety pipe Side view C38r Starter Kit
  11. 11. 24º PCT/AU2012/000326 Turn the water on Add on no:1 and make a Cap Kit Add on no: 2 are the rings 100 MM 150 MM 225 MM Add on no 3 is the safety pipe Side view C38r Starter Kit
  12. 12. C38r Starter Kit Add on no:1 and make a Cap Kit Add on no: 2 are the rings Add on no 3 is the safety pipe 100 MM 150 MM 225 MM How does the C38rs with its 24º front turbo nozzle work in 100-150mm with no rings 150mm 100mm 630mm 380mm cut tree root blockage C38rs traveling this way hits the blockage 90mm © Copyright Jim Paris 2013 24º PCT/AU2012/000326
  13. 13. C38r Starter Kit Add on no:1 and make a Cap Kit Add on no: 2 are the rings Add on no 3 is the safety pipe 100 MM 150 MM 225 MM How does the C38rs with its 24º front turbo nozzle work in 100-150mm with no rings 150mm 100mm 630mm 380mm tree root blockage go back and forward 90mm 90mm © Copyright Jim Paris 2013 cut 24º PCT/AU2012/000326
  14. 14. C38r Starter Kit Add on no:1 and make a Cap Kit Add on no: 2 are the rings Add on no 3 is the safety pipe 100 MM 150 MM 225 MM How does the C38rs with its 24º front turbo nozzle work in 100-150mm with no rings 150mm 100mm 630mm 380mm tree root C38rs is through the blockage 90mm © Copyright Jim Paris 2013 cut 24º PCT/AU2012/000326
  15. 15. C38r Starter Kit Add on no:1 and make a Cap Kit Add on no: 2 are the rings Add on no 3 is the safety pipe 100 MM 150 MM 225 MM You have just unblocked the drain and penetrated the roots. You used your CCTV and found roots. Cut the roots by moving forward and backwards 90mm 380mm tree root cut cut 90mm C38rs cuts the roots at the top of the pipe © Copyright Jim Paris 2013 24º PCT/AU2012/000326
  16. 16. C38r Starter Kit Add on no:1 and make a Cap Kit Add on no: 2 are the rings Add on no 3 is the safety pipe 100 MM 150 MM 225 MM Or you can have a diferent outcome so go to the next page 380mm C38rs cuts the roots at the top of the pipe © Copyright Jim Paris 2013 cut 24º PCT/AU2012/000326
  17. 17. C38r Starter Kit Add on no 3 is the safety pipe 24º PCT/AU2012/000326 Turn the water of Add on no:1 and make a Cap Kit Add on no: 2 are the rings 100 MM 150 MM 225 MM
  18. 18. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º PCT/AU2012/000326 Remove assembly from pipe 100 MM 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  19. 19. Add the ring if you need to cut roots around a corner, cut roots higher and go over a dislodged pipe 24º PCT/AU2012/000326 front view of 100mm ring Add on no:1 and make a Cap Kit Add on no: 2 are the rings 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  20. 20. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º PCT/AU2012/000326 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  21. 21. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º PCT/AU2012/000326 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  22. 22. 24º PCT/AU2012/000326 Place assembly in pipe Add on no:1 and make a Cap Kit Add on no: 2 are the rings 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  23. 23. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º PCT/AU2012/000326 150 MM 225 MM Add on no 3 is the safety pipe Side view C38r Starter Kit
  24. 24. 24º PCT/AU2012/000326 Turn water on Add on no:1 and make a Cap Kit Add on no: 2 are the rings 150 MM 225 MM Add on no 3 is the safety pipe Side view C38r Starter Kit
  25. 25. C38r Starter Kit Add on no:1 and make a Cap Kit Add on no: 2 are the rings Add on no 3 is the safety pipe 150 MM 225 MM How does the C38r with its 24º front turbo nozzle work in 100mm with the 100mm ring on 380mm 248mm 100mm cut cut C38r can cut bigger roots with the ring, due to been closer to them © Copyright Jim Paris 2013 24º PCT/AU2012/000326 24º
  26. 26. 24º PCT/AU2012/000326 Go over a dislodged pipe Add on no:1 and make a Cap Kit Add on no: 2 are the rings 150 MM 225 MM Add on no 3 is the safety pipe Side view C38r Starter Kit
  27. 27. 24º PCT/AU2012/000326 Turn water of Add on no:1 and make a Cap Kit Add on no: 2 are the rings 150 MM 225 MM Add on no 3 is the safety pipe Side view C38r Starter Kit
  28. 28. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º PCT/AU2012/000326 Remove assembly from pipe 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  29. 29. 24º PCT/AU2012/000326 Remove the ring Add on no:1 and make a Cap Kit Add on no: 2 are the rings 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  30. 30. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º PCT/AU2012/000326 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  31. 31. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º PCT/AU2012/000326 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  32. 32. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º 100 MM 150 MM 225 MM PCT/AU2012/000326 Add on no 3 is the safety pipe top view C38r Starter Kit
  33. 33. C38r Starter Kit Add on no:1 and make a Cap Kit Add on no: 2 are the rings Add on no 3 is the safety pipe Access through 50 mm PVC pipe 24º 100 MM 150 MM 225 MM
  34. 34. C38r Starter Kit Add on no:1 and make a Cap Kit Add on no: 2 are the rings Add on no 3 is the safety pipe Access through 50 mm PVC pipe PCT/AU2012/000326 24º 100 MM 150 MM 225 MM
  35. 35. C38r Starter Kit Add on no:1 and make a Cap Kit Add on no: 2 are the rings Add on no 3 is the safety pipe Access through 50 mm PVC pipe PCT/AU2012/000326 100 MM 150 MM 225 MM
  36. 36. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 100 MM 150 MM 225 MM Add on no 3 is the safety pipe Access through 50 mm PVC pipe © Copyright Jim Paris 2013 C38r Starter Kit
  37. 37. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 100 MM 150 MM 225 MM Add on no 3 is the safety pipe C38r Starter Kit Turn the water on and unblock the drain © Copyright Jim Paris 2013
  38. 38. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 100 MM 150 MM 225 MM Add on no 3 is the safety pipe C38r Starter Kit Turn the water off © Copyright Jim Paris 2013
  39. 39. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º 100 MM 150 MM 225 MM PCT/AU2012/000326 Add on no 3 is the safety pipe Remove assembly from pipe top view C38r Starter Kit
  40. 40. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º 100 MM 150 MM 225 MM PCT/AU2012/000326 Add on no 3 is the safety pipe Remove the hose top view C38r Starter Kit
  41. 41. Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º 100 MM 150 MM 225 MM PCT/AU2012/000326 Add on no 3 is the safety pipe In larger lines to prevent the assembly turning around use the appropriate safety pipe top view C38r Starter Kit
  42. 42. 24º PCT/AU2012/000326 Take of the front nozzle Add on no:1 and make a Cap Kit Add on no: 2 are the rings 100 MM 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  43. 43. Add on no:1 and make a Cap Kit Add on no: 2 are the rings PCT/AU2012/000326 24º 100 MM 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  44. 44. Add on no:1 and make a Cap Kit Add on no: 2 are the rings Take the cap from your Cap kit if you need to go further in the line PCT/AU2012/000326 24º 100 MM 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  45. 45. Add on no:1 and make a Cap Kit Add on no: 2 are the rings Screw them together with spanners provided in the starter kit PCT/AU2012/000326 24º 100 MM 150 MM 225 MM Add on no 3 is the safety pipe top view C38r Starter Kit
  46. 46. Add on no:1 and make a Cap Kit Add on no: 2 are the rings PCT/AU2012/000326 24º Place assembly in the pipe 100 MM 150 MM 225 MM Add on no 3 is the safety pipe Side view C38r Starter Kit
  47. 47. PCT/AU2012/000326 Turn the water on Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º 100 MM 150 MM 225 MM Add on no 3 is the safety pipe Side view C38r Starter Kit
  48. 48. PCT/AU2012/000326 1. Turn the water of Add on no:1 and make a Cap Kit Add on no: 2 are the rings 24º 100 MM 150 MM 225 MM Add on no 3 is the safety pipe Side view C38r Starter Kit
  49. 49. DIRECT HIT® © Copyright Jim Paris 2013 M: 21 09 14 www.DirectHitSewerNozzles.com

×