Wilkinson Eyre Architects                                                                                                 ...
DHRUV_SETH 0824 BUILDING_TECHNOLOGY   GATESHEAD MILLENIUM BRIDGE_INTRO
HYDRAULIC          POWERED BY                                    ACTUATORS           8 ELECTRIC             MOTORS        ...
PARKING AT THE SIDES                                                                                       PARKING AT THE ...
STRESS LEVELS AT DIFFERENT PARTS OF THE PARABOLADHRUV_SETH 0824 BUILDING_TECHNOLOGY       GATESHEAD MILLENIUM BRIDGE_FABRI...
DHRUV_SETH 0824 BUILDING_TECHNOLOGY   GATESHEAD MILLENIUM BRIDGE_STRUCTURAL INFO
Upcoming SlideShare
Loading in …5
×

Gateshead dhruv

631 views

Published on

Published in: Technology, Travel
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
631
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
17
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Gateshead dhruv

  1. 1. Wilkinson Eyre Architects Gifford and Partners (Structural engineer) CATEGORY : ROTATING CABLE-STAYED STEEL-ARCH BRIDGE Gateshead Millennium Bridge (Baltic Millennium Bridge) WORLD’S FIRST ROTATING BRIDGE Newcastle Gateshead RIVER TYNEDHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_INTRO
  2. 2. DHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_INTRO
  3. 3. HYDRAULIC POWERED BY ACTUATORS 8 ELECTRIC MOTORS CROSS SECTION THROUGH END SUPPORT, SHOWING LOCATIN OF 450 MM DIA OPENING RAMS CROSS SECTION OF CURVED PEDESTRIAN AND CYCLE DECK, SHOWING STEEL BENCH 18 45 M HIGH 4 min/OPENING Rs 300/OPENING 30 m deep foundationunsorted glacial sediment LONGITUDINAL SECTION OF THE BRIDGE SHOWING UNDERLYING FISSURED COAL MEASURESDHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_SCHEMATIC
  4. 4. PARKING AT THE SIDES PARKING AT THE SIDES The concept of the rotating bridge was a reaction to three main design constraints: 1. The bridge should be 4.5m above the spring high tides in its closed position. 2. Nothing was to be built on the Gateshead quayside. 3. The deck should have a maximum slope of 1:20 to allow for disabled access.DHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_CONSTRUCTION
  5. 5. STRESS LEVELS AT DIFFERENT PARTS OF THE PARABOLADHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_FABRICATION
  6. 6. DHRUV_SETH 0824 BUILDING_TECHNOLOGY GATESHEAD MILLENIUM BRIDGE_STRUCTURAL INFO

×