Optimized Plannning Industry Process Experience enable contrators to evaluate multiple construction processes planning

Published in: Engineering
  • Be the first to comment

  • Be the first to like this

Optimized Planning Industry Process Experience

  1. 1. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 1 Optimized Planning Industry Process Experience
  2. 2. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 2 Traditional Industry Approach
  3. 3. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 3 Our Approach Has 5 Key Processes Building Lifecycle Collaboration Platform
  4. 4. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 4 Supporting Facility Planning, Validation & Delivery 3D Project (Facility / Buildings) • BIM • VDC Processes • Sequence of Construction • Organized by Jobs Scheduled • Quick Re-planning to accommodate real world conditions • Costing Analysis 3D Resources • Cranes • Transporters • Craft Labor , Forms , Scaffolding Integrated , Common, shared 3D construction environment
  5. 5. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 5 Project Manager Understand Project Status
  6. 6. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 6 Manage Multi Scenario for the Same Project
  7. 7. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 7 Articulate Construction Progress by Weekly Basis
  8. 8. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 8 Simulate Construction Plan A with Schedule and 3D Models
  9. 9. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 9 Change Construction Plan A to Plan B
  10. 10. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 10 Construction Plan B
  11. 11. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 11 Flexible and Quick Design Changes
  12. 12. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 12 Resource Simulation: Crane Reachability, Tractor Routes etc..
  13. 13. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 13 Validate Crane Work Plan Feasibility
  14. 14. 3DS.COM©DassaultSystèmes|ConfidentialInformation|7/22/2015|ref.:3DS_Document_2014 14

×