All WP Meeting Athens - Workpackage 1 Update - Doron Goldfarb

818 views

Published on

Published in: Education, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
818
On SlideShare
0
From Embeds
0
Number of Embeds
486
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

All WP Meeting Athens - Workpackage 1 Update - Doron Goldfarb

  1. 1. WP1 - Content DM2E All WP Meeting Athens, 28 November 2013 Doron Goldfarb, Austrian National Library (ONB) co-funded by the European Union
  2. 2. Outline 1. WP1 last six months 2. New associated partners 3. Current status of content providers 11.06.2013 DM2E All WP Meeting: Work Package 1 2
  3. 3. WP1 Last six months • MS1 Final Integration Report Draft • EAD Meeting with NLI/SBB/UBER in Berlin • Specification for uncertainties in metadata • Task 1.3 Evaluation MINT, OmNom & SILK • Task 1.4 Pundit test scenario setup / evaluation 11.06.2013 DM2E All WP Meeting: Work Package 1 3
  4. 4. MS1 Final Integration Report Draft • MS1 Final Integration Report Draft • July 2013 • Detailed descriptions of Content Provider workflows • Results of MINT Questionnaire 11.06.2013 DM2E All WP Meeting: Work Package 1 4
  5. 5. EAD Meeting with NLI/SBB/UBER in Berlin • Meeting with NLI/SBB/UBER in Berlin • Preliminary EAD mapping considerations for SBB/JDC/BRANDEIS • Questions regarding the representation of the various hierarchical levels – Mandatory Web-Resources – Person/Subject references on different levels 11.06.2013 DM2E All WP Meeting: Work Package 1 5
  6. 6. Specification for uncertainties in metadata • Provider input collected at London meeting • Metadata elements with sometimes uncertain information: – Person roles (“presumed author”) – Time(spans) (19XX, 168?, 1500-1533) • Collaborated with WP2 for specification (-> WP2) 11.06.2013 DM2E All WP Meeting: Work Package 1 6
  7. 7. Task 1.3 OmNom evaluation • Will be done by ONB in cooperation with UMA • Evaluation questionnaire created 11.06.2013 DM2E All WP Meeting: Work Package 1 7
  8. 8. Task 1.3 SILK evaluation • Will be done by MPIWG together with UMA • Triplestore with contextualization data set up • Needs data ingested in order to be done!!! • Evaluation questionnaire created 11.06.2013 DM2E All WP Meeting: Work Package 1 8
  9. 9. T1.4 Pundit test scenario setup / evaluation • ONB in cooperation with UIB, NET7, UBER • Surveys created for different audiences • Will be presented tomorrow 11.06.2013 DM2E All WP Meeting: Work Package 1 9
  10. 10. TBD: WIKI about DM2E mapping • For each legacy data format one Wiki page on dm2e.eu • Short description/history of the format & its uses • “Showcase” mapping from format to DM2E model • Provide sample data & XSLT transformation online • In cooperation with WP4 / Documentation deliverable 11.06.2013 DM2E All WP Meeting: Work Package 1 10
  11. 11. Outline 1. WP1 Last six months 2. New associated partners 3. Current status of content providers 11.06.2013 DM2E All WP Meeting: Work Package 1 11
  12. 12. New associated partners • EUROCORR – Burckhardtsource – EUROCORR Advanced Grant project, funded by ERC – Burckhardtsource platform on Muruca DL (Net7) – http://burckhardtsource.org 11.06.2013 DM2E All WP Meeting: Work Package 1 12
  13. 13. New associated partners - Negotiating • MarineLives - http://marinelives.org/ „MarineLives is an innovative academic project for the collaborative transcription, linkage and enrichment of primary manuscripts, which were originated in the High Court of Admiralty, London, 1650-1669. The end product will be a publicly and freely available online academic edition” 11.06.2013 DM2E All WP Meeting: Work Package 1 13
  14. 14. New associated partners - Negotiating • Mannheim University Library http://www.ub.uni-mannheim.de – Collection of old prints, some of them already digitised, others currently digitised throughout ongoing project 11.06.2013 DM2E All WP Meeting: Work Package 1 14
  15. 15. Outline 1. WP1 Last six months 2. New associated partners 3. Current status of content providers 11.06.2013 DM2E All WP Meeting: Work Package 1 15
  16. 16. Status of Content Providers • Focus on Final Content Integration due January 2014 – – – – – BBAW CJH NLI MPIWG ONB – – – – – SBB UIB DFGA HUB UBFFM 11.06.2013 Codices ABO Ready No data available yet Workflow ready Ready Ready Parts ready Workflow ready, Delivery 2014 Ready Workflow ready Ready Ready DM2E All WP Meeting: Work Package 1 ~430,000 ~400,000 ~2,900,000 >535,000 ~45,000 ~15,000,000 ~106,000 ~5,000 ~20,000 ~205,000 ~267,000 16
  17. 17. Status of Content Providers Ready: ~ 1,487,000 Partly ready: ~ 15,000,000 Workflow ready: ~ 3,426,000 GOAL January 2014: 15,000,000 11.06.2013 DM2E All WP Meeting: Work Package 1 17
  18. 18. Status of Content Providers Partly ready: ~ 15,000,000 ONB ABO Data 11.06.2013 DM2E All WP Meeting: Work Package 1 18
  19. 19. Status of Content Providers 11.06.2013 DM2E All WP Meeting: Work Package 1 19
  20. 20. Thank You ! co-funded by the European Union

×