Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Oracle Primavera for Engineering and Construction

702 views

Published on

Conference Projects visualization: BIM and linear planning. Marriott Hotel (Warsaw), 16.10.2015.
Presentation given by Tony Banks - Engagement Director at Oracle Corporation.

Published in: Engineering
  • Be the first to comment

  • Be the first to like this

Oracle Primavera for Engineering and Construction

  1. 1. 16.10.2015 Marriott Hotel - Warszawa Wizualizacja projektów: BIM i planowanie liniowe Project visualization: BIM and linear planning Oracle Primavera for Engineering and Construction Tony Banks Engagement Director Oracle Corporation
  2. 2. Oracle Primavera solutions for Capital Projects
  3. 3. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.4 Trends in PPM
  4. 4. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.5 TREND 1: Proliferation of PPM E-Business Suite Microsoft SharePoint CA Clarity Container Database Planisware Artemis SAP Primavera Today’s Enterprise Capital Construction Operations Maintenance ManufacturingProduct R & DITCorporateServices •Slow reaction time •Squandered resources •Escalating costs •Conflicting priorities •Lack of alignment •No enterprise visibility •Redundant projects
  5. 5. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.6 TREND 2: Rationalization of PPM Silos Oracle Oracle Oracle Container Database Oracle Oracle Oracle Oracle Product R & DITCorporateServices Tomorrow’s Enterprise Capital Construction Operations Maintenance Manufacturing
  6. 6. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.7 TREND 3: PPM Integrated Into The Enterprise
  7. 7. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.8 TREND 4: Lean Methods Have Arrived CUSTOMER FEEDBACK ITERATIVE REFACTOR IDEA CONTINUOUS SELF-MANAGED ADAPTIVE LEARNING PROOF-OF-CONCEPT BACKLOG PRODUCT ROADMAP MILESTONE INCREMENTAL COMPLETE SPEED QUALITY VALUE IMPROVEMENT PEOPLE COMMUNICATION
  8. 8. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.9 TREND 5: The Hyper-Connected, Tech-Savvy Workforce In 2015, Millennials now make up nearly 50% of workforce Source: U.S. Bureau of Labor
  9. 9. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.11 Focus
  10. 10. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.12 ETO Manufacturing EPC Contractor Owner Capital Projects IT Software Development Routine MaintenanceProcess Improvement New Product Development Shutdown / Turnaround / Outage Earned Value Program Management Professional Services Automation Corporate Projects Integrated IT Portfolio Management Oracle: Single Vendor, Single Solution
  11. 11. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.13 of executives say too much critical information is delivered too late Real-time Analytics Demands Are Increasing
  12. 12. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.15 Mobility – Using Tablets, Smart Phones & E-mails
  13. 13. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.16 Integration Connected PPM In Sync with the Enterprise
  14. 14. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.17 Oracle Engineered Systems Full Stack Engineering Storage Servers OS and Virtualization Database Middleware Applications A P P L I C A T I O N
  15. 15. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.18 Primavera Solutions in Construction
  16. 16. Copyright © 2015, Oracle and/or its affiliates. All rights reserved.19 Standards-based Open Platform API, Web Services & Event Enablement Analytics Unifier Bid Management Field Cost control Change control Submittals & RFIs P6 EPPM Project Management Planning & Scheduling Resource Management Risk Management Program Management Mobile - Team Collaboration OOTB Integration Primavera Gateway Risk Analysis Simulation Others UCM, UPK, AutoVue OPPM Portfolio Project Selection * Available on cloud or on premise
  17. 17. Solutions across all Use Cases
  18. 18. Copyright © 2013, Oracle and/or its affiliates. All rights reserved.21 Primavera PPM for Contractors
  19. 19. Copyright © 2013, Oracle and/or its affiliates. All rights reserved.22 Flexibility to support multiple Owners
  20. 20. Copyright © 2013, Oracle and/or its affiliates. All rights reserved.23 Cost, Schedule, Risk Control
  21. 21. Copyright © 2013, Oracle and/or its affiliates. All rights reserved.24 Closeout and Handover
  22. 22. The Solution
  23. 23. Pursue Bid Mgmt Schedule Dev Risk Exposure
  24. 24. Scope Schedule Budget Resource Management Plan
  25. 25. Progress Collaborate Document Execute
  26. 26. Changes Cash Flow Forecasting Control
  27. 27. Hand-over Close-out Transition
  28. 28. Primavera Within the Enterprise
  29. 29. Primavera for Owners – Capital Projects
  30. 30. The Solution
  31. 31. Ideation Capital planning Identify
  32. 32. Scope Schedule Budget Resource Management Plan
  33. 33. Progress Collaborate Document Execute
  34. 34. Changes Cash Flow Forecasting Control
  35. 35. Maintenance Real Estate Operate
  36. 36. Where in the enterprise?
  37. 37. Dziękuję za uwagę. Thank you for your attention. Tony Banks Oracle Corporation www.oracle.com Tony.banks@oracle.com
  38. 38. Copyright © 2013, Oracle and/or its affiliates. All rights reserved.46

×