PARK SITE WE ARE HERE
FUNDING <ul><li>PARK CONSTRUCTION </li></ul><ul><li>DEVELOPER/PARK IMPACT FEES </li></ul><ul><li>EASTERN ELK GROVE FINANCE...
Why is it taking so long to build the rest of our park?!
THE GOOD NEWS <ul><li>The CSD has $710,000 of Park Impact Fees to build  </li></ul><ul><li>Park Site B – Sheldon Place </l...
<ul><li>Park development funds cannot be used for maintenance costs. </li></ul><ul><li>It would be fiscally irresponsible ...
<ul><li>Proposition 218 was passed by the voters of California in 1996.  </li></ul><ul><li>In the last 11 years, maintenan...
WHAT ARE OUR OPTIONS?
OPTION #1 The ‘do nothing’ option - do not build the park.
OPTION #2 <ul><li>The CSD is asking property owners in your area to vote on a new  </li></ul><ul><li>park maintenance asse...
PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN <ul><li>The Elk Grove West  </li></ul><ul><li>Vineyard Park Assessment ...
PARK SITE B – SHELDON PLACE 1.6 ACRES PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
<ul><li>CSD PARK DESIGN PRINCIPLES </li></ul><ul><li>These park design principles are taken from the CSD’s Draft Master Pl...
<ul><li>Community Meeting #1 is a workshop format to develop ideas for the  </li></ul><ul><li>the design of the park. </li...
PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
Picnic  Area DECOMPOSED GRANITE SURFACING DRINKING FOUNTAIN SHADE STRUCTURE  CONCRETE BARBECUE CONCRETE PICNIC TABLES (5) ...
PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
Playground 2-5 YEAR OLD AREA 5-12 YEAR OLD AREA <ul><li>SEPARATE 2-5 and 5-12 PLAY AREAS </li></ul><ul><li>MOVEMENT PLAY E...
2 – 5 Year Old Playground SHIP THEMED PLAY EQUIPMENT   SPINNING EQUIPMENT SHADE CANOPY SWINGS PARK SITE B – SHELDON PLACE ...
5-12 Year Old Playground SWINGS SHIP THEMED PLAY STRUCTURE PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN PEBBLE FLEX ...
PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
Adult Fitness Area BENCH THREE (3) ADULT FITNESS STATIONS  DECOMPOSED GRANITE SURFACING PARK SITE B – SHELDON PLACE CONCEP...
PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
Half Court Basketball OPEN GRASS AREA PARK BENCHES  HALF COURT BASKETBALL PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PL...
PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
Landscaping <ul><li>SHADE TREES   </li></ul><ul><li>SHRUBS AND GROUNDCOVERS – LOW GROWING AND  </li></ul><ul><li>LOW MAINT...
<ul><li>NEXT STEPS </li></ul><ul><li>Public Comment on  yourcsd.com  – June/July 2009 </li></ul><ul><li>CSD Board Master P...
PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
Upcoming SlideShare
Loading in …5
×

Cosumnes CSD - Sheldon Place Park Conceptual Master Plan

1,458 views

Published on

Published in: Art & Photos, Business, Travel
  • Be the first to comment

  • Be the first to like this

Cosumnes CSD - Sheldon Place Park Conceptual Master Plan

  1. 1. PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  2. 2. PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  3. 3. PARK SITE WE ARE HERE
  4. 4. FUNDING <ul><li>PARK CONSTRUCTION </li></ul><ul><li>DEVELOPER/PARK IMPACT FEES </li></ul><ul><li>EASTERN ELK GROVE FINANCE PLAN </li></ul><ul><li>$710,000 CONSTRUCTION BUDGET </li></ul><ul><li>PARK MAINTENANCE </li></ul><ul><li>LANDSCAPE & LIGHTING ASSESSMENTS - $115/YEAR </li></ul><ul><li>MAINTENANCE OF 10 PARKS TOTALING 58 ACRES AND </li></ul><ul><li>17 ACRES OF LANDSCAPE CORRIDORS </li></ul>PARK SITE B – SHELDON PLACE COMMUNITY WORKSHOP
  5. 5. Why is it taking so long to build the rest of our park?!
  6. 6. THE GOOD NEWS <ul><li>The CSD has $710,000 of Park Impact Fees to build </li></ul><ul><li>Park Site B – Sheldon Place </li></ul>
  7. 7. <ul><li>Park development funds cannot be used for maintenance costs. </li></ul><ul><li>It would be fiscally irresponsible of the CSD to proceed with the </li></ul><ul><li>construction of a park that they cannot afford to maintain. </li></ul>THE NOT-SO-GOOD NEWS <ul><li>The CSD does not yet own the park site. </li></ul><ul><li>Landscape and Lighting (L&L) assessments pay for park </li></ul><ul><li>maintenance. Current L&L assessments are not enough to </li></ul><ul><li>maintain Park Site B – Sheldon Place. </li></ul>
  8. 8. <ul><li>Proposition 218 was passed by the voters of California in 1996. </li></ul><ul><li>In the last 11 years, maintenance costs have risen at a rate that </li></ul><ul><li>has exceeded the CPI, typically 2 – 4%, and the District cannot </li></ul><ul><li>assume the maintenance of new parkland with the current </li></ul><ul><li>available funding. </li></ul><ul><li>The proposition prohibits raising assessments at a rate that </li></ul><ul><li>exceeds the CPI (Consumer Price Index) without a balloted vote. </li></ul>HOW DID THIS HAPPEN? <ul><li>The assessment rate is 11 years old. Rates were determined prior </li></ul><ul><li>to build out of the benefit zone and before Sheldon Place was a </li></ul><ul><li>subdivision. There was no method for anticipating future parks. </li></ul>
  9. 9. WHAT ARE OUR OPTIONS?
  10. 10. OPTION #1 The ‘do nothing’ option - do not build the park.
  11. 11. OPTION #2 <ul><li>The CSD is asking property owners in your area to vote on a new </li></ul><ul><li>park maintenance assessment. </li></ul><ul><li>Passing this measure would allow CSD design staff to proceed </li></ul><ul><li>with preparation of construction documents. </li></ul><ul><li>If passed, maintenance funding would be available for this park </li></ul><ul><li>and other parks in the area. </li></ul>
  12. 12. PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN <ul><li>The Elk Grove West </li></ul><ul><li>Vineyard Park Assessment </li></ul><ul><li>will be $96 annually or </li></ul><ul><li>about $8 per month. </li></ul><ul><li>51% of the returned ballots </li></ul><ul><li>must vote ‘yes’ on this </li></ul><ul><li>measure for passage. </li></ul><ul><li>Ballots arrived </li></ul><ul><li>May 1 and must be </li></ul><ul><li>returned by June 17 </li></ul><ul><li>If this measure fails, the construction of Park Site B – Sheldon </li></ul><ul><li>Place will be postponed indefinitely. </li></ul>
  13. 13. PARK SITE B – SHELDON PLACE 1.6 ACRES PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  14. 14. PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  15. 15. <ul><li>CSD PARK DESIGN PRINCIPLES </li></ul><ul><li>These park design principles are taken from the CSD’s Draft Master Plan. </li></ul><ul><li>PARK SITE B – SHELDON PLACE IS DEFINED AS A LOCAL PARK. </li></ul><ul><li>SIZE – LOCAL PARKS GENERALLY RANGE IN SIZE FROM 1,500 S.F. TO 3 </li></ul><ul><li>ACRES IN SIZE. THE PARK SITE IS 1.6 ACRES. </li></ul><ul><li>A LOCAL PARK TYPICALLY INCLUDES THE FOLLOWING AMENITIES: </li></ul><ul><ul><li>SMALL PLAYGROUNDS TARGETED FOR AGES 2-5 AND 5-12 </li></ul></ul><ul><ul><li>SOME SHADED PLAY ELEMENTS </li></ul></ul><ul><ul><li>SMALL SPORT COURTS </li></ul></ul><ul><ul><li>SMALL PICNIC AREA W/ SHELTER </li></ul></ul><ul><ul><li>SWINGS </li></ul></ul><ul><ul><li>BENCHES </li></ul></ul><ul><ul><li>LANDSCAPING </li></ul></ul><ul><ul><li>ADA COMPLIANT AMENITIES </li></ul></ul><ul><li>LAND USAGE – 90% ACTIVE/10% PASSIVE </li></ul><ul><li>LIGHTING – SECURITY LIGHTING ONLY </li></ul>PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  16. 16. <ul><li>Community Meeting #1 is a workshop format to develop ideas for the </li></ul><ul><li>the design of the park. </li></ul><ul><ul><li>April 16 th </li></ul></ul><ul><ul><li>No attendees </li></ul></ul>PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN COMMUNITY OUTREACH PROCESS <ul><li>Community Meeting #2 is a presentation format for staff to present a conceptual master plan based on ideas from the first meeting and CSD design principles. </li></ul><ul><ul><li>CSD Staff have completed outreach for 12 parks in past four </li></ul></ul><ul><ul><li>years </li></ul></ul><ul><ul><li>CSD Planning staff includes 3 licensed Landscape Architects </li></ul></ul><ul><ul><li>with many years experience in designing parks </li></ul></ul>
  17. 17. PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  18. 18. PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  19. 19. Picnic Area DECOMPOSED GRANITE SURFACING DRINKING FOUNTAIN SHADE STRUCTURE CONCRETE BARBECUE CONCRETE PICNIC TABLES (5) COLORED CONCRETE PAVEMENT DETAIL PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN COLORED CONCRETE
  20. 20. PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  21. 21. Playground 2-5 YEAR OLD AREA 5-12 YEAR OLD AREA <ul><li>SEPARATE 2-5 and 5-12 PLAY AREAS </li></ul><ul><li>MOVEMENT PLAY EQUIPMENT </li></ul><ul><li>COMBINATION OF RESILIENT SURFACING </li></ul><ul><li>AND WOOD FIBER </li></ul><ul><li>PLAYGROUND ADJACENT TO PICNIC </li></ul><ul><li>AREA, SHADE STRUCTURE, TABLES AND </li></ul><ul><li>BENCHES </li></ul><ul><li>SHIP / OCEAN THEME </li></ul><ul><ul><li>SHIP / OCEAN THEMED PLAY EQUIPMENT </li></ul></ul><ul><ul><li>OCEAN INSPIRED PLAY SURFACE </li></ul></ul><ul><ul><li>OCEAN INSPIRED COLORED CONCRETE </li></ul></ul>PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  22. 22. 2 – 5 Year Old Playground SHIP THEMED PLAY EQUIPMENT SPINNING EQUIPMENT SHADE CANOPY SWINGS PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN SPRINGING EQUIPMENT PEBBLE FLEX RUBBER PLAY SURFACE
  23. 23. 5-12 Year Old Playground SWINGS SHIP THEMED PLAY STRUCTURE PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN PEBBLE FLEX RUBBER PLAY SURFACE NET CLIMBER SPINNING ELEMENT OCTOPUS PLAY ELEMENT
  24. 24. PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  25. 25. Adult Fitness Area BENCH THREE (3) ADULT FITNESS STATIONS DECOMPOSED GRANITE SURFACING PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  26. 26. PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  27. 27. Half Court Basketball OPEN GRASS AREA PARK BENCHES HALF COURT BASKETBALL PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN EVERGREEN SCREEN TREES
  28. 28. PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  29. 29. Landscaping <ul><li>SHADE TREES </li></ul><ul><li>SHRUBS AND GROUNDCOVERS – LOW GROWING AND </li></ul><ul><li>LOW MAINTENANCE </li></ul><ul><li>PLANTS WITH SEASONAL COLOR TO COMPLIMENT THE </li></ul><ul><li>PLAYGROUND AND SHADE STRUCTURE </li></ul><ul><li>PLANTS WITH TEXTURE, COLOR AND SEASONAL </li></ul><ul><li>INTEREST </li></ul><ul><li>PERIMETER STREET TREES SPACED AT 30’ ON CENTER </li></ul><ul><li>GRASS MOUNDING </li></ul>PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN
  30. 30. <ul><li>NEXT STEPS </li></ul><ul><li>Public Comment on yourcsd.com – June/July 2009 </li></ul><ul><li>CSD Board Master Plan & Environmental Document Approval – July 2009 </li></ul><ul><li>Construction Drawings – July 2010 to Spring 2011 </li></ul><ul><li>Project Out to Bid – Spring 2011 * </li></ul><ul><li>Construction – Summer 2011 to Spring 2012 </li></ul><ul><li>Park Open – Summer 2012 </li></ul><ul><li>* Pending the outcome of the 218 park assessment vote </li></ul>PARK SITE B – SHELDON PLACE CONCEPTUAL MASTER PLAN