Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Cosumnes CSD - Buscher Park Conceptual Master Plan

5,477 views

Published on

Buscher Park Conceptual Master Plan by the Cosumnes Community Services District (CSD).

Published in: Business
  • Be the first to like this

Cosumnes CSD - Buscher Park Conceptual Master Plan

  1. 1. BUSCHER PARK CONCEPTUAL MASTER PLAN
  2. 2. BUSCHER PARK CONCEPTUAL MASTER PLAN
  3. 3. PARK SITE WE ARE HERE
  4. 4. BUSCHER PARK CONCEPTUAL MASTER PLAN BUSCHER PARK 2.3 ACRES
  5. 5. <ul><li>CSD PARK DESIGN PRINCIPLES </li></ul><ul><li>These park design principles are taken from the CSD’s 2008 Master Plan. </li></ul><ul><li>BUSCHER PARK IS DEFINED AS A LOCAL PARK. </li></ul><ul><li>SIZE – LOCAL PARKS GENERALLY RANGE IN SIZE FROM 1,500 S.F. TO 3 </li></ul><ul><li>ACRES IN SIZE. THE PARK SITE IS 2.3 ACRES. </li></ul><ul><li>A LOCAL PARK TYPICALLY INCLUDES THE FOLLOWING AMENITIES: </li></ul><ul><ul><li>SMALL PLAYGROUNDS TARGETED FOR AGES 2-5 AND 5-12 </li></ul></ul><ul><ul><li>SOME SHADED PLAY ELEMENTS </li></ul></ul><ul><ul><li>SMALL SPORT COURTS </li></ul></ul><ul><ul><li>SMALL PICNIC SHELTER </li></ul></ul><ul><ul><li>SWINGS </li></ul></ul><ul><ul><li>BENCHES </li></ul></ul><ul><ul><li>LANDSCAPING </li></ul></ul><ul><ul><li>ADA COMPLIANT AMENITIES </li></ul></ul><ul><li>LAND USAGE – 90% ACTIVE/10% PASSIVE </li></ul><ul><li>LIGHTING – SECURITY LIGHTING ONLY </li></ul><ul><li>CONSTRUCTION BUDGET - $925,000 </li></ul>BUSCHER PARK COMMUNITY WORKSHOP
  6. 6. <ul><li>6 PARTICIPANTS </li></ul><ul><li>3 CONCEPTUAL PLANS </li></ul><ul><li>6 RESIDENTS PROVIDED COMMENTS VIA E-MAIL </li></ul>August 26 th Community Meeting #1 BUSCHER PARK CONCEPTUAL MASTER PLAN
  7. 7. BUSCHER PARK CONCEPTUAL MASTER PLAN GROUP 1
  8. 8. BUSCHER PARK CONCEPTUAL MASTER PLAN GROUP 2
  9. 9. BUSCHER PARK CONCEPTUAL MASTER PLAN GROUP 3
  10. 10. PRIORITY DESIGN ELEMENTS AND CONCERNS: BUSCHER PARK CONCEPTUAL MASTER PLAN <ul><li>Picnic Area </li></ul><ul><li>Play Areas – separate 2-5 and 5-12, safe distance from the street, maintain visibility </li></ul><ul><li>Open Grassed Area – large enough for kids to play games but small enough so no programmed sports </li></ul><ul><li>Fence surrounding park – safety concern regarding conflicts between children and traffic, - berms, partial fencing, tree planting as alternatives </li></ul><ul><li>Preserve passive nature of site, provide alternative quiet areas, </li></ul><ul><li>Parking – contact city to add some limited on street parking spaces (City responded that it would require reconfiguration of Matina Dr) Contact elkgrovecity.org </li></ul><ul><li>Provide lots of walkways/loop trails </li></ul>
  11. 11. <ul><li>OTHER DESIGN ELEMENTS (includes on-line comments): </li></ul><ul><li>Basketball Court (2) (numerous comments - pros and cons) </li></ul><ul><li>Adult Fitness (2) </li></ul><ul><li>Horseshoes (1) </li></ul><ul><li>Putting Green (1) (via email) </li></ul><ul><li>Volleyball or ping pong table (1) (via email) </li></ul><ul><li>Dog Park (2) (all via e-mail) </li></ul><ul><li>Historic/Exploration Theme </li></ul>BUSCHER PARK CONCEPTUAL MASTER PLAN
  12. 12. BUSCHER PARK CONCEPTUAL MASTER PLAN
  13. 13. BUSCHER PARK CONCEPTUAL MASTER PLAN
  14. 14. Playground 2-5 YEAR OLD AREA 5-12 YEAR OLD AREA <ul><li>SEPARATE 2-5 and 5-12 PLAY AREAS </li></ul><ul><li>LOCATED AWAY FROM STREET AND FENCED ON </li></ul><ul><li>EXPOSED SIDE </li></ul><ul><li>SEPARATE & PROTECTED OPEN GRASS AREA </li></ul><ul><li>ADJACENT PLAYGROUND </li></ul><ul><li>COMBINATION OF RESILIENT SURFACING </li></ul><ul><li>AND WOOD FIBER </li></ul><ul><li>PLAYGROUND ADJACENT TO PICNIC </li></ul><ul><li>AREA, SHADE STRUCTURE, TABLES AND </li></ul><ul><li>BENCHES </li></ul><ul><li>UNITED STATES EXPLORER/NAVIGATION THEME </li></ul><ul><ul><li>COMPASS/NAVIGATION FEATURE </li></ul></ul><ul><ul><li>NORTH STAR CONSTELLATION FEATURE </li></ul></ul><ul><ul><li>FORT PLAY FEATURE </li></ul></ul>BUSCHER PARK CONCEPTUAL MASTER PLAN
  15. 15. 2 – 5 Year Old Playground SHIP THEMED PLAY EQUIPMENT SPINNING EQUIPMENT SHADE CANOPY SWINGS BUSCHER PARK CONCEPTUAL MASTER PLAN SPRINGING EQUIPMENT PEBBLE FLEX RUBBER PLAY SURFACE
  16. 16. 5-12 Year Old Playground SWINGS 5-12 YEAR OLD PLAY STRUCTURE BUSCHER PARK CONCEPTUAL MASTER PLAN SPINNING ELEMENT PEBBLE FLEX RUBBER PLAY SURFACE BOOK AND MAP PLAY ELEMENT CONCRETE LOG BENCH
  17. 17. BUSCHER PARK CONCEPTUAL MASTER PLAN
  18. 18. Picnic Area DECOMPOSED GRANITE SURFACING DRINKING FOUNTAIN SHADE STRUCTURE CONCRETE BARBECUE CONCRETE PICNIC TABLES (5) COMPASS FEATURE BUSCHER PARK CONCEPTUAL MASTER PLAN COMPASS FEATURE
  19. 19. BUSCHER PARK CONCEPTUAL MASTER PLAN
  20. 20. Plaza/Passive Areas/Fencing DECORATIVE FENCING BUSCHER PARK CONCEPTUAL MASTER PLAN BENCHES FOR PASSIVE ACTIVIES (IE. READING, RELAXATION, ETC.) ATTRACTIVE LANDSCAPE AREAS AWAY FROM ACTIVE USE AREAS VIEW
  21. 21. BUSCHER PARK CONCEPTUAL MASTER PLAN
  22. 22. Plaza/Passive Areas/Fencing DECORATIVE FENCING BUSCHER PARK CONCEPTUAL MASTER PLAN BENCHES FOR PASSIVE ACTIVIES (IE. READING, RELAXATION, ETC.) ATTRACTIVE LANDSCAPE AREAS AWAY FROM ACTIVE USE AREAS INTERLOCKING PAVING STONE PLAZA AREA
  23. 23. BUSCHER PARK CONCEPTUAL MASTER PLAN
  24. 24. Adult Fitness Area BENCH THREE (3) ADULT FITNESS STATIONS DECOMPOSED GRANITE SURFACING BUSCHER PARK CONCEPTUAL MASTER PLAN
  25. 25. Landscaping <ul><li>SHADE TREES </li></ul><ul><li>SHRUBS AND GROUNDCOVERS – LOW GROWING AND </li></ul><ul><li>LOW MAINTENANCE </li></ul><ul><li>PLANTS WITH SEASONAL COLOR TO COMPLIMENT THE </li></ul><ul><li>PLAYGROUND AND SHADE STRUCTURE </li></ul><ul><li>PLANTS WITH TEXTURE, COLOR AND SEASONAL </li></ul><ul><li>INTEREST </li></ul><ul><li>PERIMETER STREET TREES SPACED AT 30’ ON CENTER </li></ul><ul><li>GRASS MOUNDING </li></ul>BUSCHER PARK CONCEPTUAL MASTER PLAN
  26. 26. <ul><li>NEXT STEPS </li></ul><ul><li>Public Comment on yourcsd.com – October 2010 </li></ul><ul><li>CSD Board Master Plan & Environmental Document Approval – November 2010 </li></ul><ul><li>Construction Drawings – January 2011 to Spring 2011 </li></ul><ul><li>Project Out to Bid – Summer 2011 </li></ul><ul><li>Construction – Summer 2011 to Spring 2012 </li></ul><ul><li>Park Open – Spring 2012 </li></ul>BUSCHER PARK CONCEPTUAL MASTER PLAN
  27. 27. BUSCHER PARK CONCEPTUAL MASTER PLAN

×