5. Bee Creek Combined Project
• Oct 16 1994 Flood: Record 15 inches/24
hours
• Water in structures
• 1995 to 2005 engineering designs and reviews
– FEMA Permitting
– Corps Permitting
• Capital Project 2005 to 2008 Construction
20. Bee Creek Maintenance
• Developer inconsistently maintained creek
• 1995 to 2003 City mows bypass channel area
• 2003 citizens ask City to stop mowing
• No drainage easement along creek area
• 2003 developer sells property along creek
21. Feedback – HOA / Residents
• Meetings with HOA and Residents
• Summary of Stated HOA Concerns:
–Increased flood water heights
–Swimming pool floods
–Increase vegetation, brush, trees and debris
–Dead and down trees from drought
–Upstream development and local standards
22. Feedback – HOA / Residents
• Summary of HOA Stated Requests:
–Request for City to maintain creek
• Initial channel repair
• Recurring mowing
–Consider a larger CIP channel improvement
24. Recommendations
1. Complete the Drainage Master Plan
–CIP Identify and Prioritize
2. Additional public engagement
3. More detailed study of area
4. Address maintenance / drainage easement