This document discusses ISO 19650 and outlines a process for project mobilization and collaborative production of information according to its guidelines. It emphasizes the importance of proper planning, preparation and training during mobilization to setup the project team and technology for success. It also stresses the need for communication, trust and transparency during collaborative production to avoid issues like delays, rework and confusion. Key aspects covered include mobilizing resources and IT, testing procedures, generating and reviewing information, quality assurance checks and using technology like Plannerly to simplify the workflow.
14. SCOPE
PLAN
Standards, processes and requirements FROM
TEMPLATES
Project Planning Project Controls
SCHEDU
LE
TRACK
Collaborative task management and INTEGRATED
VERIFICATION
VERIFY
CONTRA
CT
Plannerly Modules Are Designed To Support Workflow
17. 17
Planning and Preparation?
NOT That Fun!
Usually An
Overhead Cost
Unplanned
Training
Tedious
Have Multiple
Starting Points
Uncoordinated
Unclear Process
Complex Tools
18. 18
Implications?
Untrained Teams
Learning On The
Job
Starting From
Scratch
Reinventing
Processes Every
Project
Difficult To Find
Information
Multiple To Do
Lists
Wasted Time
Searching
Unavailable Teams
Involve The Wrong
People/Team Teams Start
Without The Right
Knowledge
22. 22
5.1 Mobilize Resources
Include The Right Teams
Deliver
Education/On-
boarding
Skills and Training
Resource Availability
Team Permissions:
Viewer, Editor, Manager
23. 23
5.2 Mobilize Information Technology
Configure
Technology
Hardware and Software
Testing Plans
Procure + Consolidate Technology Resources
24. 24
5.3 Test Project Methods and Procedures
Test Production
Methods + Procedures
Breakdown Structure
Identification
Communicate Procedures
To All Task Teams
Templates For Information
Management Tasks
32. 32
6.1 Reference Information And Shared Resources
Check CDE for requirements
Check CDE for reference information
Report to the Lead Appointed
Party if any reference
information is missing
33. 33
6.2 Generate Information
Follow Production
Methods and
Procedures
Generate The Necessary
Level of Information Need
Export Structured Data For
Automation + Validation
Plan To Coordinate Geometric
Models With Other Models
Automated Tasks
From Contract
40. 40
Summary: ISO 19650 Mobilize + Collaborative Production Workflow
✓ Follow your Mobilization Plan
✓ Check Resources
✓ Deliver Training Early
✓ Test Software Before Live Project Work
✓ Walk Through Procedures
✓ Communicate Methods
✓ Communicate Missing Information Early
✓ Follow Quality Process
41. SCOPE
PLAN
Standards, processes and requirements FROM TEMPLATES
Project Planning Project Management
SCHEDULE TRACK
Collaborative task management and INTEGRATED VERIFICATION
VERIFY
This Process Is Simplified Using Plannerly:
CONTRACT
SELECT ONE OR MORE MODULES TO SIMPLIFY YOUR BIM MANAGEMENT
Traverse through the obstacles with flawless execution
With no changes or unforeseen conditions the project will be smooth for everyone!
With all goals with ease we will have plenty of time to have fun!
Will our project even get off of the ground?
The Mobilization and Collaborative Information Production guide teams to start projects with consistent collaboration
Plannerly supports the ISO 19650 workflow
Plan+Scope+Contracts simplify standards management and help streamline BIM Execution Planning (BEP)
Schedule+Track reduce the admin burden and simplify the management of BIM Tasks
Verify completes the BIM workflow by connecting your BIM requirements to the model for BIM compliance
Today we will cover testing procedures, how to use the same requirements from the scope (original contract). We will also cover collaborative sequencing and cover steps following ISO 19650 guidelines to review and progress tasks
Project Mobilization is the Planning and Preparation work for project execution
We understand that this responsibility isn’t something all team members want to take on.
However it’s important because of all the risk we take on. We then find ourselves making it up as we go - “It’s like fixing a plane in mid-flight”
The ISO 19650 standards
Don’t make up the process as you go - make sure the procedures will work out before sharing with the team
What are the most important BIM Uses for the project?
Why are teams creating 3D modeling in the first place?
What’s the PURPOSE for BIM?
Let’s start a BEP on the right foot by asking some questions that need to be clear
Sequencing story - two parallel projects running the same coordination process.
Automated Tasks
Each team should be responsible for updating their own tasks.
Do this as a team!
Sharing the right level of permission to each team so that they can update their own tasks - progress updates will be always up to date with the “herding cats”
Let’s start a BEP on the right foot by asking some questions that need to be clear
Plannerly supports the ISO 19650 workflow
Plan+Scope+Contracts simplify standards management and help streamline BIM Execution Planning (BEP)
Schedule+Track reduce the admin burden and simplify the management of BIM Tasks
Verify completes the BIM workflow by connecting your BIM requirements to the model for BIM compliance
watch the “Basics” videos and
let us know when you would like to schedule your SmartLeanBIM® Masterclass!
It is going to be cheaper this month
questions about pricing…
We would love to partner with you to help our industry!
Are you ready to work together?
Meet us?: https://www.plannerly.com/meeting
Partner?: https://www.plannerly.com/register