Bowen

  1. 1. Anne Arundel County Phase II WIP Choose Clean Water Chesapeake Bay Restoration Conference January 11, 2011
  2. 2. (1) WWTPs Upgrading WWTPs to Enhanced Nitrogen Removal Capacity (2) Septic Systems Sanitary Sewer Extensions and Satellite Cluster Systems (3) Stormwater Retrofits Stormwater Outfall Restoration Stormwater Pond Restoration (4) Headwater Stream Erosion Prevention Stream Channel Restoration Ephemeral Channel Restoration Anne Arundel County Core Implementation Strategy
  3. 3. Degraded Stream Conditions
  4. 4. Restored Stream Stability Restored Hydrology within Floodplains and Streams Restored Biological Health of Streams Compliance with Water Quality Standards Ultimate Goals
  5. 5. Step Pool Stormwater Conveyance (SPSC) Restoration Strategy
  6. 6. County WWTPs ( ≈ $270,000,000) Sanitary Sewer Extensions and Satellite Cluster Systems ( ≈ $800,000,000) Stormwater Retrofits ( ≈ $400,000,000) Headwater Stream Erosion Prevention ( ≈ $400,000,000) TOTAL ESTIMATED COST: $1.87 Billion What is the Potential Cost to Anne Arundel County?

×