  1. 1. We envision a future where construction processes are completely automated and buildings are developed by artificially intelligent machines.
  2. 2. What are we solving? Construction has been almost the same over the last hundreds of years. Traditional processes are inefficient, expensive, dangerous, and have negative effects on the environment.
  3. 3. Wired Magazine Science Alert “Singapore just launched a plan to fill the city with 3D-printed homes” The Facts “The UN estimates that by 2030, approx. 3 billion people will require housing and 3D printers are one potential solution”
  4. 4. “25% of Dubai’s buildings will be 3D printed by 2030” Sheikh Mohammed, Ruler of Dubai “Dubai unveils world's first 3D-printed office building” The Facts
  5. 5. Quotes from a recent Deloitte study regarding the benefits of implementing 3D printing in construction: Due to a 50-70 percent reduction in construction time based on increased automation Due to 50-80 percent lower labor costs, less wastage of material as it is an additive process, and potentially lower financing costs due to shorter execution time. Due to the ability to create customized and intricate design, inbuilt insulation in 3D printed walls and a higher sustainability footprint due to the use of recycled waste as part of the raw material and concrete. Faster Cheaper Better
  6. 6. What are we doing about it? We are developing a new system of construction that provides more efficient processes in architecture, engineering, and materials that revolutionizes the way we design and develop houses and buildings. This system includes providing large-scale 3D printing technologies that can automatically “print” houses and buildings based on the software designs.
  7. 7. The Cazza X1 Click to watch this video
  8. 8. The Cazza X1 This Cazza autonomous robot automatically 3D prints the concrete framework and formwork for the foundation of a house. It can also be used to print structures up to 5m in height and can print modules, homes, villas, commercial building and unique architectural structures.
  9. 9. The Cazza X1 *Robots can be lifted to build structures higher than 5m or can build modules that will be assembled as pre- fabricated modules for larger structures Starts from USD $480,000 Safety sensor network: Equipped with a set of sensors which detect the presence of people, preventing on- site hazards. Easy to control: Designed to require minimum training in Robot control and navigation. Efficient: Designed to minimize human labour, construction processes are up to 40% more efficient Robotic arm extender: Maximum frontal reach of 4.7m Hydraulic height extender support base: Maximum total height reach 5 m* Mobile tracked platform: 3.6 x 3.4 x 0.8m Upgrades include: • extended height • extended length • smoothing system mechanism for improved surface finish
  10. 10. The Cazza X1 CORE This Cazza autonomous robot automatically 3D prints the concrete framework and formwork for the foundation of a house. It can also be used to print structures up to 6m in height and can print modules, homes, villas, commercial building and unique architectural structures.
  11. 11. The Cazza X1 CORE Starts at: USD$620,000 Build for strength: A special set of covers to protect the robot, made in Carbon Fiber for increased durability in the field. Field autopilot navigation: Capable to self-navigate the construction site, minimizing the possibility of positional mistakes. Robotic arm extender: Maximum frontal reach of 4.7m Hydraulic height extender support base: Maximum total height reach 6m Mobile tracked platform: 3.6 x 3.4 x 0.8m Upgrades include: • extended height • extended length • smoothing system mechanism for improved surface finish • Autopilot navigation *Robots can be lifted to build structures higher than 6m or can build modules that will be assembled as pre- fabricated modules for larger structures
  12. 12. Design of the building or architectural structure is done using any design software. Export existing design file of project. The 3D printing software will detect what can and should be 3D printed. The machine is then brought onsite and set at printing location, the machine will then begin printing the concrete structures until the project is finished. The 3D printing process with Cazza 01 02 03
  13. 13. Examples of houses we can 3D print (designed by Cazza team)
  14. 14. How do we make money? We provide Cazza’s construction robots, technologies and “ink” (concrete, etc.) that work with the machines. We also offer design, engineering and consulting services for 3D printing construction projects.
  15. 15. The Numbers Series A round size USD$80m Projected revenue 2017 USD$45m
  16. 16. Our Team Chris Kelsey - CEO (20) Fernando De los Rios - COO (27) The Founders
  17. 17. The Founders Founder - CEO, Chris Kelsey • Former CEO of Appsitude an app development company Founder - COO, Fernando De Los Rios • Former COO of Appsitude • Former CEO of Prix, Peru’s first online grocery store
  18. 18. Research and Development Centre → Engineering team lead by PHD in Robotics Engineering → Materials team lead by Postdoctoral fellow in Materials Engineering • Computational engineers (Masters degree) • Civil engineers (Masters degree) • Mechatronic engineers (Masters degree) • Power fluid engineers (Masters degree) • Electrical engineers (Masters degree) • Automation engineers (Masters degree) Team consists of:
  19. 19. Activity in Dubai Selected to be a part of the Dubai Future Accelerator program 30 participants chosen from all over the world Collaborated with Dubai government to establish building standards and codes for 3D printing Currently, working with several large construction companies in Dubai on the planning and design for several housing projects. Projects expected to start Fall 2017 Project in Dubai to lead to a 5k housing project
  20. 20. Competitors 1) Win Sun 2) Apis Cor We use advanced concrete mixes with new ways of reinforcement. We are the only 3D printing company who sells the technology Our technology offers features that are not offered by our competitors : • Self Automated – programmable to analyze the site and begin printing without human intervention • Human sensors – Increases safety on site by detecting the presence of humans • Mobile – Ability to be operated from a distance using our software