Retrofitting a Drinking Water Well Site with
Ion Exchange Vessels for PFAS Removal
Rachel Burger, Lauren Todd, Shirin Udwadia,
Sophia Della Rocca, & Caroline Packard
CLEMSON UNIVERSITY, CLEMSON, SC
October 28, 2021
OUTLINE
â—Ź Introduction
â—‹ Background
â—‹ Rationale
â—‹ Objectives
â—‹ Approaches/Tasks
â—‹ Deliverables
â—Ź Literature Review
â—Ź Materials and Methods
â—Ź Results
â—Ź Recommendations
â—Ź Acknowledgements
Introduction
Background
â—Ź Water fuels every aspect of life on earth.
○ Essential for basic human health and hygiene, and it drives society’s most essential
industries.
â—Ź Climate change due to human impact has created shorter rainy seasons and longer dry seasons,
diminishing many of the world’s water sources.
â—Ź Other than environmental changes affecting our water, pollution is a main threat.
â—‹ Agriculture, industrial activities, and naturally occuring substances are all causes of water
pollution.
â—‹ One contaminant polluting our water supplies is polyfluorinated substances (PFAS), which
are a category of synthetic chemicals used to make fluoropolymer coatings and products
that resist heat, oil, stains, and water.
Background
â—Ź PFAS substances have properties which make them water resistant as well as water soluble, allowing them to
bioaccumulate in bodies of water, and in human and animal populations.
â—Ź Due to the toxic nature of PFAS, and the fact that PFAS contamination is not federally regulated, the health of
humans and the environment has been negatively affected.
â—Ź Safe Drinking Water Act (SDWA) sets enforceable Maximum Contaminant Levels (MCLs) for specific chemicals
and can require monitoring of public water supplies
â—‹ There are no current MCLs established for PFAS chemicals
â—‹ EPA has initiated the steps to evaluate the need for a PFAS MCL
â—‹ EPA has issued a health advisory for PFOA and PFOS
â–  Informal guideline, non-regulatory
â—Ź The State Water Resources Control Board (SWRCB) of Orange County, California has set some of the most
stringent PFAS advisories in the country.
Rationale
â—Ź Since PFAS substances can dissolve in water, they travel through water
treatment facilities and small-scale water filters. However, they are not easily
detected or removed by traditional water treatment methods.
â—Ź PFAS substances pose a threat to public health and are heavily present in
drinking water sources.
â—‹ Large amounts of PFAS have resulted in decreased performance of the
thyroid, immune system, liver, and reproductive system.
○ From the “Road of Death” case study in Australia, there was sufficient
evidence that higher levels of PFOS and PFOA in a person’s blood can
lead to a decline in health.
Rationale
â—Ź Therefore, efficient technology needs to be developed to provide safe
drinking water and mitigate the risk of PFAS exposure to public
health.
â—Ź Unconventional methods that are proven to be effective in removing
PFAS include activated carbon absorption, ion exchange resin, and
high pressure membrane filtration.
Objective
The objective of this project is to retrofit a drinking water well site with ion
exchange vessels as a treatment technology system for the purpose of
removing polyfluorinated substances (PFAS) and decontaminating the
community water systems.
Tasks
Task 1: To research PFAS and establish their general structure, usage, interaction in the environment, human health effects, and current federal and
state regulations.
Task 2: To study ion exchange vessels and define the mechanisms required for the removal process, and assess advantages and disadvantages
over other treatment processes.
Task 3: To determine and compare different vendors and technologies for the ion exchange vessel.
Task 4: To identify the specific characteristics of PFAS and contamination levels at the well site, in addition to water qualities such as pH, inorganic
ion and natural organic matter concentrations.
Task 5: To retrofit the drinking water treatment and distribution systems: wells, existing and additional pumps, engineering and design of novel
treatment technology.
Task 6: To create a model of the drinking water treatment system and site, and model PFAS removal.
Task 7: To estimate a budget for the cost of retrofitting the drinking water treatment and distribution systems (wells, existing and additional pumps,
and ion exchange filtration system).
Task 8: To assess the environmental, economic, and societal impacts of the ion exchange vessel on PFAS removal.
Data/
Analysis
Design/Modeling
Cost/
Recommendations
Tasks
Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8
Data/Analysis Design/Modeling Cost/Recommendations
Task 1: To research PFAS and establish their general structure, usage, interaction with the environment,
human health effects, and current federal and state regulations.
Tasks
Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8
Data/Analysis Design/Modeling Cost/Recommendations
Task 2: To study ion exchange vessels and define the mechanisms required for the removal process, and
assess advantages and disadvantages over other treatment processes.
â—Ź Sub-task 2.1: To research other proposed alternatives and compare them to the ion exchange
method.
â—Ź Sub-task 2.2: To identify any restrictions or limitations that need to be considered prior to
choosing a resin media and designing the vessels.
Tasks
Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8
Data/Analysis Design/Modeling Cost/Recommendations
Task 3: To determine and compare different vendors and technologies for the ion exchange vessel.
Tasks
Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8
Data/Analysis Design/Modeling Cost/Recommendations
Task 4: To identify the specific characteristics of PFAS and contamination levels at the well site, in
addition to water qualities such as pH, inorganic ions and natural organic matter concentrations.
â—Ź Sub-task 4.1: To select an anion exchange resin that is compatible with the PFAS and water
characteristics and maintains an adequate uptake capacity.
â—Ź Sub-task 4.2: To find a vendor with the selected anion exchange resin(s).
Tasks
Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8
Data/Analysis Design/Modeling Cost/Recommendations
Task 5: To retrofit the drinking water treatment and distribution systems: wells, existing and additional pumps,
engineering and design of novel treatment technology.
● Sub-task 5.1: To report the well’s original design, existing pumps, and flow characteristics, such as flow
rate, variability, and pressure.
â—Ź Sub-task 5.2: To analyze flow characteristics and determine if an additional pump or modification is
needed.
â—Ź Sub-task 5.3: To design a pre-filtration unit to remove large suspended solids and prevent damage to
following units and pipes.
â—Ź Sub-task 5.4: To develop a list of materials and equipment required for the design, and provide
calculations for design feasibility.
Tasks
Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8
Data/Analysis Design/Modeling Cost/Recommendations
Task 6: To create a model of the drinking water treatment system and site, and model PFAS removal.
â—Ź Sub-task 6.1: To design the well site using AutoCAD.
â—Ź Sub-task 6.2: To design the drinking water distribution and treatment using SuperPro.
â—Ź Sub-task 6.3: To model removal of PFAS using STELLA.
Tasks
Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8
Data/Analysis Design/Modeling Cost/Recommendations
Task 7: To estimate a budget for the cost of retrofitting the drinking water treatment and distribution
systems (wells, existing and additional pumps, and ion exchange filtration system).
Tasks
Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8
Data/Analysis Design/Modeling Cost/Recommendations
Task 8: To assess the environmental, economic, and societal impacts of the ion exchange vessel on
PFAS
removal.
â—Ź Sub-task 8.1: To evaluate the required maintenance, such as resin regeneration protocols, brine
treatment and reuse.
â—Ź Sub-task 8.2: To determine future impacts on the environment and human health.
Deliverables
Deliverable 1: Alternative technologies and vendors analysis
Deliverable 2: Models, designs, and calculations for the water treatment and distribution system components
Deliverable 3: Model for an effective yet aesthetically pleasing well site
Deliverable 4: Project budget
Deliverable 5: Develop recommendations for future maintenance, upkeep, and potential future challenges (water
quality, regulations, emerging contaminants)
Deliverable 6: Final report
Literature Review
What is PFAS?
â—Ź Perfluorinated/polyfluorinated substances (PFAS): group of man-made chemicals, used in
consumer products to make them non-stick and water resistant.
â—Ź PFAS are persistent chemicals and can bioaccumulate in bodies of water and of animals;
they can also dissolve in water and traditional drinking water treatment technologies
cannot remove them.
○ They have been aptly nicknamed “forever chemicals”.
â—Ź These chemicals have unique physical and chemical properties which allow them to repel
oil and water, resist temperature, and reduce friction.
Chemical Structure
â—Ź Chemical structure: all PFAS contain a chain
of carbons attached to fluorines with a
functional group at the end
â—‹ Most PFAS compounds can be broken
down into units: (1) the hydrophobic,
nonionic tail consisting of the
fluorinated carbon chain (2) the anionic
head, having a negative charge
â—Ź PFAS owe their properties to the carbon-
fluorine bond, one of the shortest and
strongest known
https://engineering.tufts.edu/cee/sustainabilityLab/
research/validation-prediction-PFAS.htm
https://www.niehs.nih.gov/health/topics/agen
ts/pfc/index.cfm
Classification
of PFAS
Most common types:
â—Ź PFAA: perfluoroalkyl acids
â—Ź PFOA: perfluorooctanoate
â—Ź PFOS: perfluorooctane
sulfonate
â—Ź Polymeric: stay intact
throughout lifetime
â—Ź Non-polymeric: useful and
harmful even after degradation
Classification of PFAS
â—Ź Long-chain PFAS contain 6 or more carbons, short-chain PFAS contain less than 6
â—Ź The two PFAS most commonly found by water systems are legacy long-chain
compounds that have been phased out of manufacturing, perfluorooctanoate (PFOA) and
perfluorooctane sulfonic (PFOS) acids.
â—Ź Long-chain PFAS have been found to have high bioaccumulation potential compared to
short-chain
â—‹ For example, the half-life of PFOS in the human body is 5 years or more
â—‹ By comparison, the half-life of PFBA (a short-chain PFAS) is 3 to 4 days
â—Ź Long-chain PFAS are no longer commonly used but are easier to remove, while short-
chain PFAS are much more difficult to extract
Environmental Interaction
â—Ź Sources of environmental contamination include:
â—‹ Disposal of wastes generated during primary and secondary PFAS production
â—‹ Degradation of consumer products containing PFAS
â—‹ Fire fighting foams used for flammable liquids and fire department training
â—Ź Environmental release mechanisms associated with these facilities include: air
emissions and dispersion, spills, and disposal of manufacturing wastes and
wastewater
â—Ź Conventional sewage treatment methods do not efficiently remove PFAS
â—‹ Some PFAS are frequently detected in wastewater treatment plant effluents
● PFAS in an area’s wastewater indicates their presence in drinking water
Environmental Interaction
â—Ź PFAS have been found in domestic
sewage sludge and biosolids
â—Ź Application of biosolids as a soil
amendment can result in an
additional transfer of PFAS to soil;
then available for uptake by plants
and soil organisms
â—‹ PFAS can then enter the food
chain through biosolids-
amended soil
Manufacturing and Usage
Commercial products containing PFAS:
â—Ź Paper and packaging
â—Ź Fire-fighting foams
â—Ź Outdoor textiles and sporting equipment
â—Ź Non-stick cookware
â—Ź Cleaning agents and fabric softeners
â—Ź Paints and dyes
â—Ź Adhesives
â—Ź Medical products
Major manufacturing sources:
â—Ź Textiles and leather products
â—Ź Metal plating and etching
â—Ź Wire manufacturing
â—Ź Industrial plastics
â—Ź Photolithography
https://www.ppmindustries.com/en/the-adhesive-
tape-manufacturer
History of PFAS
3M Company
â—Ź The history of PFAS production begins with the 3M Company, founded in 1902 as a mining
venture. The company is based in St. Paul, Minnesota.
â—‹ Has now moved on to manufacture sandpaper, abrasive materials, tapes (masking tape
and Scotch® tape brand), and more.
â—Ź In the 1940s, they began utilizing electrochemical fluorination to manufacture certain
products, introducing PFAS – aka the forever chemicals – into the everyday lives of
consumers.
â—Ź 3M Company has failed to notify the government multiple times since USEPA rules were
released in 2002.
â—Ź Even with government assistance, 3M has only spent 12% of the 10 billion taxpayer dollars
the company was allocated for PFAS clean up, and wasting this money has brought multiple
lawsuits against them
Health Risks: Minnesota Case Study
â—Ź PFAS have been linked to a major cancer crisis in Washington County,
Minnesota. Several major drinking water supplies were contaminated
with PFAS, allegedly from the 3M Company dumping the chemicals in
the city’s landfills.
â—Ź 3M used PFAS as a key ingredient in ScotchGuard products in Oakdale,
Washington County. It was found that the children who died were 171%
more likely to have had a diagnosis of cancer than children who died in
unaffected areas.
â—Ź In 2018, the state of Minnesota settled its lawsuit against the 3M
Company in return for a settlement of $850 million.
○ Minnesota’s attorney general sued 3M in 2010 alleging that the
company’s production of PFAS had damaged drinking water and
natural resources in the Twin Cities Metropolitan area.
Health Risks: Australia Case Study
â—Ź Multiple areas in Australia were contaminated with PFAS due to fire fighting activities on nearby defense
force bases, creating what they call “the Road of Death.”
â—Ź Members of these communities were exposed to PFAS primarily through the use of contaminated water
including bore and river water on their properties, and via eating locally grown foods.
● Australian Government Department of Health: “Currently
there is limited evidence that exposure to PFAS causes
adverse human health effects.”
â—Ź This is in contrast to the USEPA, which has concluded
PFAS are a human health hazard, and at high enough
levels can cause immune dysfunction, hormonal
interference, and certain types of cancer in humans.
Health Risks: Australia Case Study
● Recently, Australian National University’s College of Health
& Medicine conducted an investigation into the exposure
levels and potential health effects on “the Road of Death.”
● Participants referred to what they suspected was a “cancer
cluster” several times, which had occurred in a specific
geographical location in the PFAS Investigation Area
â—‹ Participants were particularly concerned about the
onset of cancers and the deterioration of existing
health conditions
â—Ź However, ANU found no convincing evidence that PFAS
contamination caused cancer in humans
https://www.foe.org.au/water_industry_a_major_source_of_pfas_contamination
Current Action For Awareness & Removal
â—Ź The PFAS Action Act of 2021 was recently introduced by Michigan Representative Debbie
Dingell, and aims to set a pathway for PFAS chemical to be designated hazardous
substances.
â—‹ This will open the door for future regulation in drinking water, as well as clean up
under other existing legislations.
â—‹ In April, the bill passed in the House by a vote of 241 to 183.
â—Ź According to the Government Accountability Office, the Department of Defense spent $1.1
billion on PFAS clean up in 2020, and estimates it will spend $2.1 billion more in 2021.
â—‹ Officials say it might take decades to fully address PFAS pollution.
Existing Regulations
â—Ź Safe Drinking Water Act (SDWA) sets enforceable Maximum Contaminant Levels (MCLs) for
specific chemicals and can require monitoring of public water supplies
â—‹ No current MCLs established for PFAS chemicals
â—Ź EPA has issued a health advisory for PFOA and PFOS; however it serves as an informal
guideline and is non-regulatory
â—Ź EPA collected data for chemicals that were suspected contaminants in drinking water but did
not have health based-standards set under the SDWA
â—‹ Six PFAS substances were included for monitoring
â—Ź The Toxic Substances Control Act (TSCA) includes a requirement for industry reporting of
chemicals to the EPA. To date, 330 PFAS substances have been reported.
Existing Regulations
â—Ź Thus, there are no federal regulations for PFAS substances in the United States.
â—Ź However, the California State Water Resources Control Board (SWRCB) Division of
Drinking Water has set some of the most stringent PFAS advisories in the country
â—‹ The focus of our project is a well site in Orange County
â—‹ The control board set notification and response levels to regulate PFAS state-wide
Ion Exchange (IX)
â—Ź IX is a water treatment method where ionic contaminants
are removed from water by exchange with another non-
objectionable ionic substance.
â—‹ Both the contaminant and the exchange substance
must be dissolved and have the same type of
electrical charge.
â—Ź During the exchange process, any ionic contaminants in
the water are traded for “healthier” ions provided by the
exchange substance
â—‹ The contaminant ions are then attracted or fixed to
the exchange substance and cannot pass through to
the rest of the water treatment process.
https://en.wikipedia.org/wiki/Ion-exchange_resin
IX Mechanism
https://www.sciencedirect.com/science/article/pii/S0045
653521002460#fig4
â—Ź Anion exchange resins are made up of
highly porous, polymeric microbeads that
are basic and water insoluble.
â—‹ Characteristics are chosen based
on the substance being removed:
strongly or weakly basic functional
group, acrylic or styrenic matrix, and
gel or macroporous cross linking
â—Ź The resin beads have a positive functional group that is immobile with a negatively charged exchange ion
attached. The negatively charged PFAS have a greater attraction to the immobile functional group, so the
exchange ion is released and the PFAS are loaded onto the resin.
â—Ź Anion IX removes 100 percent of the PFAS for a time that depends on the choice of resin, bed depth, flow rate,
and which PFAS need to be removed
IX Vessel
â—Ź The IX resin is loaded into vessels.
â—Ź The contaminated solution enters the top of the vessel,
runs through a compact mixed resin bed, which will pick up
and retain the PFAS contaminants. The treated water exits
the vessel at the bottom.
â—‹ Flow rate through the vessel is regulated by valves to
ensure there is enough contact time for the ion
exchange to take place.
â—‹ Pretreatment is often needed before the IX vessels to
ensure the most efficient use of the ion exchange
resin.
Resin Regeneration
â—Ź IX resins can either be single use or regenerative
â—‹ Since resin manufacturing has a large environmental burden, regenerative resins are
preferred
â—Ź Regeneration occurs within the vessels through a two step process:
â—‹ Backwashing uses a back flow of water for the removal of debris such as organic matter
â—‹ A regeneration solution, usually a brine, is back flowed through the resin to remove the
attached PFAS from the resin and replace them with chloride ions
â—Ź This process produces a concentrated waste stream of PFAS, which is typically
disposed of through incineration. However, this method, along with microbial,
sonochemical, electrochemical, and photon-based degradation are still being
researched.
Alternative Methods
â—Ź Granulated activated carbon (GAC) is a porous adsorption media made from organic carbon
materials which filters contaminants via a physical mass transfer process.
â—‹ Its extremely high internal surface area contributes to adsorption, and heat is used to
activate the media surface area.
â—Ź Reverse osmosis removes contaminants by pushing the water under pressure through a
semipermeable membrane, then the contaminant is collected for disposal.
â—‹ This method is commonly used for household water purification and production of
bottled water.
● Nanofiltration is similar to reverse osmosis, however the membrane is not as “tight”. This
method operates at a lower pressure and is less effective at removing dissolved solids.
Advantages and Limitations
Advantages and Limitations
For these reasons, we decided to model the drinking water well site with an
ion exchange vessel for PFAS removal.
Materials and Methods
Project Site Information
â—Ź The project focuses on a residential area in the Orange County Water District
â—‹ Well Site #7 includes an existing groundwater extraction well, clear well with
a booster pump, and a chloramine disinfection system.
â—Ź The facility was designed to produce up to 2,000 gpm of drinking water for
delivery to the distribution system. The distribution system will go to a water
treatment facility for further disinfection.
â—Ź The pump station and chemical facilities were designed to host a future additional
well and booster pump for a higher production rate of up to 4,000 gpm.
Well Site Water Quality
IX Resin
We have chosen the Purolite PFA694E resin.
● Reduces PFAS to non-detect levels ranging from 1 – 5 parts per trillion
â—Ź Has a polystyrenic backbone which is crosslinked with divinylbenzene and a complex
amino functional group
â—Ź Removes PFAS via a dual mechanism of ion exchange and adsorption
â—Ź Effective on short and long chain PFAS
â—Ź Very high operating capacity and a higher total exchange
capacity than its competitors
â—Ź Regenerative
Purolite PFA694E Characteristics
Governing Equations
â—Ź Langmuir Isotherm
Where C is the dissolved chemical species, S is an adsorption site, CS is the chemical
bound to the site, Keq is the equilibrium constant governing the reaction, and Stot is the
total site concentration.
Governing Equations
â—Ź Mass Balance
Hydraulic Calculation Assumptions
Criteria Assumptions
Pumping System Upgrade existing pump to provide 2,000
gpm flow
Number of pumps: 1 pump
Static Water Level and Drawdown Level Suction Side HWL: 99 ft
Suction Side LWL: -8 ft
Pump System Conditions Intake Elevation: -119 ft
Discharge Elevation: 307 ft (highpoint in
pump piping)
Min. Roughness Factor: 130
Max. Roughness Factor: 140
Altitude: 302 ft
Water Temp.: 60 degrees F
Well Schematic
Diagram
Pump System Head
Loss and Motor
Equations
Modeling
â—Ź To model the PFAS accumulation and the concentration gradient through the
IX resin, STELLA will be used.
â—Ź To model the influent and effluent concentration of PFAS through the IX
vessel, SuperPro will be used.
â—Ź To model the pump and pre filtration unit, Solidworks will be used.
â—Ź To model the whole site process, AutoCAD and Google SketchUp will be used.
IX Resin Model
â—Ź Modeling PFAS accumulation in the ion exchange vessel in Stella
Stella Modeling Report
â—Ź Modeling the concentration gradient in the ion exchange vessel also in STELLA
Stella Modeling Report
Concentration
(ng/L)
â—Ź Modeling initial and final PFAS concentrations using SuperPro
SuperPro Modeling Report
Results For IX Vessel, Prefiltration Unit,
Pump, & Site Process with Solidworks &
AutoCAD
Purolite PFA694E Requirements for IX Vessel
Number of Trains 2
Vessel Diameter 12 ft
Media Volume per Vessel 420 ft3
Total Media Volume 1680 ft3
Vessel Area 113 ft2
Bed Depth 3.7 ft
Linear Velocity 8.8 gpm/ft2
Specific Flow Rate 2.4 gpm/ft3
With these configurations, the lag vessel breakthrough will occur at approximately
189,000 bed volumes. This is equal to about 412 days if the system ran 24/7 at 2000
gpm.
IX Vessel
â—Ź For the IX vessel, we chose Evoqua Water Technologies to provide the vessel
since they are able to make the vessel any size we need.
â—Ź The following Solidworks model is based off of an Evoqua vessel and the
dimension requirements from the Purolite resin.
IX Vessel 3D Model
Water Inlet
(10 in
diameter
pipe)
Regeneration
Inlet (20 in
diameter
pipe) Resin Bed
(3.7 ft deep)
Treated Water Outlet
(10 in diameter pipe)
Waste Outlet (20 in diameter pipe)
Vessel diameter: 12 ft
Prefiltration Unit
â—Ź The chosen prefiltration unit is a Yardney Angled Centrifugal Sand Separator.
● From Yardney’s given flow size charts, the model chosen for a 2,000 gpm flow rate is a
PCS-100LA. It can handle flow from 1300-2300 gpm
○ Particle size max: 1.5”
â—‹ Removes sand, rock, grit, and other inorganic contaminants with fine filtration
down to 75 microns.
○ 10” inlet/outlet diameter; 10” piping from prefiltration unit to IX vessel
â—Ź There will be two prefiltration units in series in order to maximize the amount of water
that can be treated.
Prefiltration Unit Models
10” inlet
10”
outlet
2” purge
outlet
Pump System Head Loss
and Motor Calculations
Cross sectional area: A=Ď€*r2
Where: D [10 in]
r [0.417 ft]
A [0.55 ft2]
Velocity: V=Q/A
Where: Q [2000 gpm = 32.68 fps]
V [59.92 fps]
Velocity head: Hv=V2/2g
Where: g [32.2 ft/s2]
Hv [55.75 ft]
Pipe Friction Head loss: HI=L*Sf
Where: Sf= (10.44Q1.85)/(10.441.85 *D4.8655)
Sf [0.001175 ft/ft]
L [216.64 ft]
HI [0.255 ft]
Input Shaft Power: Ps=(Q*TH)/(Cf*E)
Where: TH [107 ft]
E [80% efficiency]
Cf [3960 for english units]
Ps [67.55 hp]]
Pump: Original Choice
â—Ź For 2000 gpm flow rate, the WaterBoss Lineshaft Turbine Pump by
Wolf Customized Pumps was chosen. Specifically model 14HME.
â—Ź This pump was chosen because it can handle deep well types and
the materials it’s made of allow it to handle harsh conditions (like
the high flow rate and being underground).
1800 RPM Performance
Curve for original pump
choice
â—Ź This performance curve was
provided by Wolf.
● Overall , this pump won’t be able to
provide enough power, according
to the calculations.
Pump: New Choice
â—Ź The new chosen pump is just one model up from the previous,
which is a WaterBoss Lineshaft Turbine Pump by Wolf Customized
Pumps, specifically their 14HMO.
â—Ź It can handle a flow rate of 1500-3250 gpm
● The bowl diameter is 14” and it is made of glass lined CL30 cast
iron. The impeller material is C876 BRZ with an enclosed style.
● The 10” piping can connect the pump to the pre-filtration unit with
a fitted connector between the the bowl and the piping.
1770 RPM Performance
Curve for new pump
choice
â—Ź This performance curve was
provided by Wolf.
â—Ź The new pump is able to provide
more than enough power and can
accommodate the system head.
Site Process Flow Model
Pump and Prefiltration
IX Vessel Train
Site Model: Overhead View
Site Model: Close Up
Option 1
Option 2
Cost Estimate
â—Ź Ion exchange vessel
â—‹ $200,000
â—Ź Resin
â—‹ $1,000 per cubic foot
â–  $1,680,000 for 4 vessels
â—Ź Pre-filtration unit
â—‹ $6,000
â—Ź Pump
â—‹ $7,000
â—Ź Warehouse construction: $400,000
â—Ź Total: $
Recommendations for Maintenance
â—Ź The resin will need to be regenerated before the 412 day breakthrough time to keep the
effluent concentration less than 2 ng/L
â—‹ Backwashing will occur before the regeneration to remove any accumulated debris or
fine resin particles
â—‹ Regeneration with a 0.5% ammonium chloride brine results in higher PFOA and PFOS
recovery rates
â—Ź Eventually, the resin will be exhausted, and it will no longer be beneficial to regenerate as the
removal efficiency decreases with each regeneration.
â—‹ Since the lifespan is dependent on many factors such as temperature, oxidants,
organics, and other foulants, it is difficult to predict the exact replacement period. Most
strongly basic anion exchange resins last 5-8 years.
Acknowledgements
Alex Lin, P.E., AECOM
Dr. Alessandro Franchi, P.E., AECOM
Dr. Darnault, Ingénieur
Dr. Xiao
Dr. Drapcho
Dr. Lipscomb
And the wonderful Capstone Team: Lauren Todd, Shirin Udwadia, Rachel Burger, Caroline Packard,
Sophia Della Rocca
Thank You

More Related Content

What's hot

Final capstone presentation
Final capstone presentationFinal capstone presentation
Final capstone presentationColinRichter3
 
Capstone midterm presentation
Capstone midterm presentationCapstone midterm presentation
Capstone midterm presentationMichaelSmith808947
 
Algae growth and long term storage
Algae growth and long term storageAlgae growth and long term storage
Algae growth and long term storageMichaelSmith808947
 
Research pres aerogel
Research pres aerogelResearch pres aerogel
Research pres aerogelCarolinePackard
 
Capstone midterm
Capstone midtermCapstone midterm
Capstone midtermSarahLangston5
 
CE6605 Environmental Engineering II - Course Presentation
CE6605 Environmental Engineering II - Course PresentationCE6605 Environmental Engineering II - Course Presentation
CE6605 Environmental Engineering II - Course PresentationRathnavel Ponnuswami
 
Capstone design final project upload
Capstone design final project uploadCapstone design final project upload
Capstone design final project uploadSarahLangston5
 
IRJET- Water Reclamation and Reuse
IRJET- Water Reclamation and ReuseIRJET- Water Reclamation and Reuse
IRJET- Water Reclamation and ReuseIRJET Journal
 
Improvement of uf membrane performance
Improvement of uf membrane performanceImprovement of uf membrane performance
Improvement of uf membrane performancemauriciocabral2018
 
Water quality monitoring
Water quality monitoringWater quality monitoring
Water quality monitoringManojKumar5984
 
Characterization of Leachate Contaminants from Waste Dumpsites in Maiduguri, ...
Characterization of Leachate Contaminants from Waste Dumpsites in Maiduguri, ...Characterization of Leachate Contaminants from Waste Dumpsites in Maiduguri, ...
Characterization of Leachate Contaminants from Waste Dumpsites in Maiduguri, ...AZOJETE UNIMAID
 
Drinking water and wastewater monitoring
Drinking water and wastewater monitoringDrinking water and wastewater monitoring
Drinking water and wastewater monitoringAli Adane
 
The Development and Deployment in Developing Countries of Manifolded, Three-S...
The Development and Deployment in Developing Countries of Manifolded, Three-S...The Development and Deployment in Developing Countries of Manifolded, Three-S...
The Development and Deployment in Developing Countries of Manifolded, Three-S...Michigan State University Research
 
IRJET- Economical Water Purifier using Natural and Waste Materials
IRJET- Economical Water Purifier using Natural and Waste MaterialsIRJET- Economical Water Purifier using Natural and Waste Materials
IRJET- Economical Water Purifier using Natural and Waste MaterialsIRJET Journal
 
1.1 Manuele Margni
1.1 Manuele Margni1.1 Manuele Margni
1.1 Manuele MargniIzabela Popova
 
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...James Robinson
 
Evaluation of Potential Physico-Chemical Ground Water Pollution: a Case Study...
Evaluation of Potential Physico-Chemical Ground Water Pollution: a Case Study...Evaluation of Potential Physico-Chemical Ground Water Pollution: a Case Study...
Evaluation of Potential Physico-Chemical Ground Water Pollution: a Case Study...EditorIJAERD
 

What's hot (20)

Final capstone presentation
Final capstone presentationFinal capstone presentation
Final capstone presentation
 
Capstone midterm presentation
Capstone midterm presentationCapstone midterm presentation
Capstone midterm presentation
 
Algae growth and long term storage
Algae growth and long term storageAlgae growth and long term storage
Algae growth and long term storage
 
Research pres aerogel
Research pres aerogelResearch pres aerogel
Research pres aerogel
 
DNBR
DNBRDNBR
DNBR
 
Nabec (smith, m)
Nabec (smith, m)Nabec (smith, m)
Nabec (smith, m)
 
Capstone midterm
Capstone midtermCapstone midterm
Capstone midterm
 
CE6605 Environmental Engineering II - Course Presentation
CE6605 Environmental Engineering II - Course PresentationCE6605 Environmental Engineering II - Course Presentation
CE6605 Environmental Engineering II - Course Presentation
 
Capstone design final project upload
Capstone design final project uploadCapstone design final project upload
Capstone design final project upload
 
L 1 introduction
L 1 introductionL 1 introduction
L 1 introduction
 
IRJET- Water Reclamation and Reuse
IRJET- Water Reclamation and ReuseIRJET- Water Reclamation and Reuse
IRJET- Water Reclamation and Reuse
 
Improvement of uf membrane performance
Improvement of uf membrane performanceImprovement of uf membrane performance
Improvement of uf membrane performance
 
Water quality monitoring
Water quality monitoringWater quality monitoring
Water quality monitoring
 
Characterization of Leachate Contaminants from Waste Dumpsites in Maiduguri, ...
Characterization of Leachate Contaminants from Waste Dumpsites in Maiduguri, ...Characterization of Leachate Contaminants from Waste Dumpsites in Maiduguri, ...
Characterization of Leachate Contaminants from Waste Dumpsites in Maiduguri, ...
 
Drinking water and wastewater monitoring
Drinking water and wastewater monitoringDrinking water and wastewater monitoring
Drinking water and wastewater monitoring
 
The Development and Deployment in Developing Countries of Manifolded, Three-S...
The Development and Deployment in Developing Countries of Manifolded, Three-S...The Development and Deployment in Developing Countries of Manifolded, Three-S...
The Development and Deployment in Developing Countries of Manifolded, Three-S...
 
IRJET- Economical Water Purifier using Natural and Waste Materials
IRJET- Economical Water Purifier using Natural and Waste MaterialsIRJET- Economical Water Purifier using Natural and Waste Materials
IRJET- Economical Water Purifier using Natural and Waste Materials
 
1.1 Manuele Margni
1.1 Manuele Margni1.1 Manuele Margni
1.1 Manuele Margni
 
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
 
Evaluation of Potential Physico-Chemical Ground Water Pollution: a Case Study...
Evaluation of Potential Physico-Chemical Ground Water Pollution: a Case Study...Evaluation of Potential Physico-Chemical Ground Water Pollution: a Case Study...
Evaluation of Potential Physico-Chemical Ground Water Pollution: a Case Study...
 

Similar to Be 4750 capstone presentation

338774160-Water-Treatment-Plant-Design-Project_2.pdf
338774160-Water-Treatment-Plant-Design-Project_2.pdf338774160-Water-Treatment-Plant-Design-Project_2.pdf
338774160-Water-Treatment-Plant-Design-Project_2.pdfaloknayak47
 
338774160-Water-Treatment-Plant-Design-Project.pdf
338774160-Water-Treatment-Plant-Design-Project.pdf338774160-Water-Treatment-Plant-Design-Project.pdf
338774160-Water-Treatment-Plant-Design-Project.pdfaloknayak47
 
Waterborne engineering (csu) design report
Waterborne engineering (csu) design reportWaterborne engineering (csu) design report
Waterborne engineering (csu) design reportAshwin Dhanasekar
 
IRJET- Experimental Work by Vacuum Methodology Study on Waste Water
IRJET- Experimental Work by Vacuum Methodology Study on Waste WaterIRJET- Experimental Work by Vacuum Methodology Study on Waste Water
IRJET- Experimental Work by Vacuum Methodology Study on Waste WaterIRJET Journal
 
PROJECT PPT.pptx
PROJECT PPT.pptxPROJECT PPT.pptx
PROJECT PPT.pptxSamuelLepariyo
 
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)Stephen Flood
 
Handbook for the operation of water treatment works
Handbook for the operation of water treatment worksHandbook for the operation of water treatment works
Handbook for the operation of water treatment worksHilda Inaya
 
IRJET- Treatment of Dairy Waste Water by using Groundnut Shell as Low Cost Ad...
IRJET- Treatment of Dairy Waste Water by using Groundnut Shell as Low Cost Ad...IRJET- Treatment of Dairy Waste Water by using Groundnut Shell as Low Cost Ad...
IRJET- Treatment of Dairy Waste Water by using Groundnut Shell as Low Cost Ad...IRJET Journal
 
CHE5055 M Crawcour research proposal 28 April 2010
CHE5055 M Crawcour research proposal 28 April 2010CHE5055 M Crawcour research proposal 28 April 2010
CHE5055 M Crawcour research proposal 28 April 2010Megan Rose
 
Network and mandates of wq monitoring
Network and mandates of wq monitoringNetwork and mandates of wq monitoring
Network and mandates of wq monitoringhydrologyproject0
 
Andreoli et al 2007 sludge treatment and disposal
Andreoli et al 2007 sludge treatment and disposalAndreoli et al 2007 sludge treatment and disposal
Andreoli et al 2007 sludge treatment and disposalTung Huynh
 
Environmental Footprint of Ecofiltro Water Filter: Comparative Analysis of Fi...
Environmental Footprint of Ecofiltro Water Filter: Comparative Analysis of Fi...Environmental Footprint of Ecofiltro Water Filter: Comparative Analysis of Fi...
Environmental Footprint of Ecofiltro Water Filter: Comparative Analysis of Fi...Sustainable Brands
 
Article four (recovered) one plus
Article four (recovered) one plusArticle four (recovered) one plus
Article four (recovered) one plusDr Robert Craig PhD
 
[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...
[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...
[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...Good Earthkeeping Organization Inc (GEO)
 
Business Case - H2FLOW
Business Case - H2FLOWBusiness Case - H2FLOW
Business Case - H2FLOWPeter L. Blaha
 
cel-report
cel-reportcel-report
cel-reportadnan malak
 

Similar to Be 4750 capstone presentation (20)

Inka Orko, VTT - Products from waste water components
Inka Orko, VTT - Products from waste water componentsInka Orko, VTT - Products from waste water components
Inka Orko, VTT - Products from waste water components
 
338774160-Water-Treatment-Plant-Design-Project_2.pdf
338774160-Water-Treatment-Plant-Design-Project_2.pdf338774160-Water-Treatment-Plant-Design-Project_2.pdf
338774160-Water-Treatment-Plant-Design-Project_2.pdf
 
338774160-Water-Treatment-Plant-Design-Project.pdf
338774160-Water-Treatment-Plant-Design-Project.pdf338774160-Water-Treatment-Plant-Design-Project.pdf
338774160-Water-Treatment-Plant-Design-Project.pdf
 
Waterborne engineering (csu) design report
Waterborne engineering (csu) design reportWaterborne engineering (csu) design report
Waterborne engineering (csu) design report
 
IRJET- Experimental Work by Vacuum Methodology Study on Waste Water
IRJET- Experimental Work by Vacuum Methodology Study on Waste WaterIRJET- Experimental Work by Vacuum Methodology Study on Waste Water
IRJET- Experimental Work by Vacuum Methodology Study on Waste Water
 
PROJECT PPT.pptx
PROJECT PPT.pptxPROJECT PPT.pptx
PROJECT PPT.pptx
 
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
 
Presentation of Berezutskyi 1
Presentation of Berezutskyi 1Presentation of Berezutskyi 1
Presentation of Berezutskyi 1
 
Handbook for the operation of water treatment works
Handbook for the operation of water treatment worksHandbook for the operation of water treatment works
Handbook for the operation of water treatment works
 
IRJET- Treatment of Dairy Waste Water by using Groundnut Shell as Low Cost Ad...
IRJET- Treatment of Dairy Waste Water by using Groundnut Shell as Low Cost Ad...IRJET- Treatment of Dairy Waste Water by using Groundnut Shell as Low Cost Ad...
IRJET- Treatment of Dairy Waste Water by using Groundnut Shell as Low Cost Ad...
 
CHE5055 M Crawcour research proposal 28 April 2010
CHE5055 M Crawcour research proposal 28 April 2010CHE5055 M Crawcour research proposal 28 April 2010
CHE5055 M Crawcour research proposal 28 April 2010
 
Network and mandates of wq monitoring
Network and mandates of wq monitoringNetwork and mandates of wq monitoring
Network and mandates of wq monitoring
 
Andreoli et al 2007 sludge treatment and disposal
Andreoli et al 2007 sludge treatment and disposalAndreoli et al 2007 sludge treatment and disposal
Andreoli et al 2007 sludge treatment and disposal
 
Environmental Footprint of Ecofiltro Water Filter: Comparative Analysis of Fi...
Environmental Footprint of Ecofiltro Water Filter: Comparative Analysis of Fi...Environmental Footprint of Ecofiltro Water Filter: Comparative Analysis of Fi...
Environmental Footprint of Ecofiltro Water Filter: Comparative Analysis of Fi...
 
Article four (recovered) one plus
Article four (recovered) one plusArticle four (recovered) one plus
Article four (recovered) one plus
 
Organic chemist
Organic chemistOrganic chemist
Organic chemist
 
[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...
[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...
[Guest Speaker] Yue Rong - GEOs Gas Thermal Remediation Workshop Series - Los...
 
Business Case - H2FLOW
Business Case - H2FLOWBusiness Case - H2FLOW
Business Case - H2FLOW
 
cel-report
cel-reportcel-report
cel-report
 
Pharmaceutical Water Instrumentation Guide
Pharmaceutical Water Instrumentation GuidePharmaceutical Water Instrumentation Guide
Pharmaceutical Water Instrumentation Guide
 

Recently uploaded

IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectErbil Polytechnic University
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate productionChinnuNinan
 

Recently uploaded (20)

IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction Project
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
 

Be 4750 capstone presentation

  • 1. Retrofitting a Drinking Water Well Site with Ion Exchange Vessels for PFAS Removal Rachel Burger, Lauren Todd, Shirin Udwadia, Sophia Della Rocca, & Caroline Packard CLEMSON UNIVERSITY, CLEMSON, SC October 28, 2021
  • 2. OUTLINE â—Ź Introduction â—‹ Background â—‹ Rationale â—‹ Objectives â—‹ Approaches/Tasks â—‹ Deliverables â—Ź Literature Review â—Ź Materials and Methods â—Ź Results â—Ź Recommendations â—Ź Acknowledgements
  • 4. Background â—Ź Water fuels every aspect of life on earth. â—‹ Essential for basic human health and hygiene, and it drives society’s most essential industries. â—Ź Climate change due to human impact has created shorter rainy seasons and longer dry seasons, diminishing many of the world’s water sources. â—Ź Other than environmental changes affecting our water, pollution is a main threat. â—‹ Agriculture, industrial activities, and naturally occuring substances are all causes of water pollution. â—‹ One contaminant polluting our water supplies is polyfluorinated substances (PFAS), which are a category of synthetic chemicals used to make fluoropolymer coatings and products that resist heat, oil, stains, and water.
  • 5. Background â—Ź PFAS substances have properties which make them water resistant as well as water soluble, allowing them to bioaccumulate in bodies of water, and in human and animal populations. â—Ź Due to the toxic nature of PFAS, and the fact that PFAS contamination is not federally regulated, the health of humans and the environment has been negatively affected. â—Ź Safe Drinking Water Act (SDWA) sets enforceable Maximum Contaminant Levels (MCLs) for specific chemicals and can require monitoring of public water supplies â—‹ There are no current MCLs established for PFAS chemicals â—‹ EPA has initiated the steps to evaluate the need for a PFAS MCL â—‹ EPA has issued a health advisory for PFOA and PFOS â–  Informal guideline, non-regulatory â—Ź The State Water Resources Control Board (SWRCB) of Orange County, California has set some of the most stringent PFAS advisories in the country.
  • 6. Rationale â—Ź Since PFAS substances can dissolve in water, they travel through water treatment facilities and small-scale water filters. However, they are not easily detected or removed by traditional water treatment methods. â—Ź PFAS substances pose a threat to public health and are heavily present in drinking water sources. â—‹ Large amounts of PFAS have resulted in decreased performance of the thyroid, immune system, liver, and reproductive system. â—‹ From the “Road of Death” case study in Australia, there was sufficient evidence that higher levels of PFOS and PFOA in a person’s blood can lead to a decline in health.
  • 7. Rationale â—Ź Therefore, efficient technology needs to be developed to provide safe drinking water and mitigate the risk of PFAS exposure to public health. â—Ź Unconventional methods that are proven to be effective in removing PFAS include activated carbon absorption, ion exchange resin, and high pressure membrane filtration.
  • 8. Objective The objective of this project is to retrofit a drinking water well site with ion exchange vessels as a treatment technology system for the purpose of removing polyfluorinated substances (PFAS) and decontaminating the community water systems.
  • 9. Tasks Task 1: To research PFAS and establish their general structure, usage, interaction in the environment, human health effects, and current federal and state regulations. Task 2: To study ion exchange vessels and define the mechanisms required for the removal process, and assess advantages and disadvantages over other treatment processes. Task 3: To determine and compare different vendors and technologies for the ion exchange vessel. Task 4: To identify the specific characteristics of PFAS and contamination levels at the well site, in addition to water qualities such as pH, inorganic ion and natural organic matter concentrations. Task 5: To retrofit the drinking water treatment and distribution systems: wells, existing and additional pumps, engineering and design of novel treatment technology. Task 6: To create a model of the drinking water treatment system and site, and model PFAS removal. Task 7: To estimate a budget for the cost of retrofitting the drinking water treatment and distribution systems (wells, existing and additional pumps, and ion exchange filtration system). Task 8: To assess the environmental, economic, and societal impacts of the ion exchange vessel on PFAS removal. Data/ Analysis Design/Modeling Cost/ Recommendations
  • 10. Tasks Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Data/Analysis Design/Modeling Cost/Recommendations Task 1: To research PFAS and establish their general structure, usage, interaction with the environment, human health effects, and current federal and state regulations.
  • 11. Tasks Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Data/Analysis Design/Modeling Cost/Recommendations Task 2: To study ion exchange vessels and define the mechanisms required for the removal process, and assess advantages and disadvantages over other treatment processes. â—Ź Sub-task 2.1: To research other proposed alternatives and compare them to the ion exchange method. â—Ź Sub-task 2.2: To identify any restrictions or limitations that need to be considered prior to choosing a resin media and designing the vessels.
  • 12. Tasks Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Data/Analysis Design/Modeling Cost/Recommendations Task 3: To determine and compare different vendors and technologies for the ion exchange vessel.
  • 13. Tasks Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Data/Analysis Design/Modeling Cost/Recommendations Task 4: To identify the specific characteristics of PFAS and contamination levels at the well site, in addition to water qualities such as pH, inorganic ions and natural organic matter concentrations. â—Ź Sub-task 4.1: To select an anion exchange resin that is compatible with the PFAS and water characteristics and maintains an adequate uptake capacity. â—Ź Sub-task 4.2: To find a vendor with the selected anion exchange resin(s).
  • 14. Tasks Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Data/Analysis Design/Modeling Cost/Recommendations Task 5: To retrofit the drinking water treatment and distribution systems: wells, existing and additional pumps, engineering and design of novel treatment technology. â—Ź Sub-task 5.1: To report the well’s original design, existing pumps, and flow characteristics, such as flow rate, variability, and pressure. â—Ź Sub-task 5.2: To analyze flow characteristics and determine if an additional pump or modification is needed. â—Ź Sub-task 5.3: To design a pre-filtration unit to remove large suspended solids and prevent damage to following units and pipes. â—Ź Sub-task 5.4: To develop a list of materials and equipment required for the design, and provide calculations for design feasibility.
  • 15. Tasks Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Data/Analysis Design/Modeling Cost/Recommendations Task 6: To create a model of the drinking water treatment system and site, and model PFAS removal. â—Ź Sub-task 6.1: To design the well site using AutoCAD. â—Ź Sub-task 6.2: To design the drinking water distribution and treatment using SuperPro. â—Ź Sub-task 6.3: To model removal of PFAS using STELLA.
  • 16. Tasks Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Data/Analysis Design/Modeling Cost/Recommendations Task 7: To estimate a budget for the cost of retrofitting the drinking water treatment and distribution systems (wells, existing and additional pumps, and ion exchange filtration system).
  • 17. Tasks Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Data/Analysis Design/Modeling Cost/Recommendations Task 8: To assess the environmental, economic, and societal impacts of the ion exchange vessel on PFAS removal. â—Ź Sub-task 8.1: To evaluate the required maintenance, such as resin regeneration protocols, brine treatment and reuse. â—Ź Sub-task 8.2: To determine future impacts on the environment and human health.
  • 18.
  • 19. Deliverables Deliverable 1: Alternative technologies and vendors analysis Deliverable 2: Models, designs, and calculations for the water treatment and distribution system components Deliverable 3: Model for an effective yet aesthetically pleasing well site Deliverable 4: Project budget Deliverable 5: Develop recommendations for future maintenance, upkeep, and potential future challenges (water quality, regulations, emerging contaminants) Deliverable 6: Final report
  • 21. What is PFAS? â—Ź Perfluorinated/polyfluorinated substances (PFAS): group of man-made chemicals, used in consumer products to make them non-stick and water resistant. â—Ź PFAS are persistent chemicals and can bioaccumulate in bodies of water and of animals; they can also dissolve in water and traditional drinking water treatment technologies cannot remove them. â—‹ They have been aptly nicknamed “forever chemicals”. â—Ź These chemicals have unique physical and chemical properties which allow them to repel oil and water, resist temperature, and reduce friction.
  • 22. Chemical Structure â—Ź Chemical structure: all PFAS contain a chain of carbons attached to fluorines with a functional group at the end â—‹ Most PFAS compounds can be broken down into units: (1) the hydrophobic, nonionic tail consisting of the fluorinated carbon chain (2) the anionic head, having a negative charge â—Ź PFAS owe their properties to the carbon- fluorine bond, one of the shortest and strongest known https://engineering.tufts.edu/cee/sustainabilityLab/ research/validation-prediction-PFAS.htm https://www.niehs.nih.gov/health/topics/agen ts/pfc/index.cfm
  • 23. Classification of PFAS Most common types: â—Ź PFAA: perfluoroalkyl acids â—Ź PFOA: perfluorooctanoate â—Ź PFOS: perfluorooctane sulfonate â—Ź Polymeric: stay intact throughout lifetime â—Ź Non-polymeric: useful and harmful even after degradation
  • 24. Classification of PFAS â—Ź Long-chain PFAS contain 6 or more carbons, short-chain PFAS contain less than 6 â—Ź The two PFAS most commonly found by water systems are legacy long-chain compounds that have been phased out of manufacturing, perfluorooctanoate (PFOA) and perfluorooctane sulfonic (PFOS) acids. â—Ź Long-chain PFAS have been found to have high bioaccumulation potential compared to short-chain â—‹ For example, the half-life of PFOS in the human body is 5 years or more â—‹ By comparison, the half-life of PFBA (a short-chain PFAS) is 3 to 4 days â—Ź Long-chain PFAS are no longer commonly used but are easier to remove, while short- chain PFAS are much more difficult to extract
  • 25. Environmental Interaction â—Ź Sources of environmental contamination include: â—‹ Disposal of wastes generated during primary and secondary PFAS production â—‹ Degradation of consumer products containing PFAS â—‹ Fire fighting foams used for flammable liquids and fire department training â—Ź Environmental release mechanisms associated with these facilities include: air emissions and dispersion, spills, and disposal of manufacturing wastes and wastewater â—Ź Conventional sewage treatment methods do not efficiently remove PFAS â—‹ Some PFAS are frequently detected in wastewater treatment plant effluents â—Ź PFAS in an area’s wastewater indicates their presence in drinking water
  • 26. Environmental Interaction â—Ź PFAS have been found in domestic sewage sludge and biosolids â—Ź Application of biosolids as a soil amendment can result in an additional transfer of PFAS to soil; then available for uptake by plants and soil organisms â—‹ PFAS can then enter the food chain through biosolids- amended soil
  • 27. Manufacturing and Usage Commercial products containing PFAS: â—Ź Paper and packaging â—Ź Fire-fighting foams â—Ź Outdoor textiles and sporting equipment â—Ź Non-stick cookware â—Ź Cleaning agents and fabric softeners â—Ź Paints and dyes â—Ź Adhesives â—Ź Medical products Major manufacturing sources: â—Ź Textiles and leather products â—Ź Metal plating and etching â—Ź Wire manufacturing â—Ź Industrial plastics â—Ź Photolithography https://www.ppmindustries.com/en/the-adhesive- tape-manufacturer
  • 29. 3M Company â—Ź The history of PFAS production begins with the 3M Company, founded in 1902 as a mining venture. The company is based in St. Paul, Minnesota. â—‹ Has now moved on to manufacture sandpaper, abrasive materials, tapes (masking tape and Scotch® tape brand), and more. â—Ź In the 1940s, they began utilizing electrochemical fluorination to manufacture certain products, introducing PFAS – aka the forever chemicals – into the everyday lives of consumers. â—Ź 3M Company has failed to notify the government multiple times since USEPA rules were released in 2002. â—Ź Even with government assistance, 3M has only spent 12% of the 10 billion taxpayer dollars the company was allocated for PFAS clean up, and wasting this money has brought multiple lawsuits against them
  • 30. Health Risks: Minnesota Case Study â—Ź PFAS have been linked to a major cancer crisis in Washington County, Minnesota. Several major drinking water supplies were contaminated with PFAS, allegedly from the 3M Company dumping the chemicals in the city’s landfills. â—Ź 3M used PFAS as a key ingredient in ScotchGuard products in Oakdale, Washington County. It was found that the children who died were 171% more likely to have had a diagnosis of cancer than children who died in unaffected areas. â—Ź In 2018, the state of Minnesota settled its lawsuit against the 3M Company in return for a settlement of $850 million. â—‹ Minnesota’s attorney general sued 3M in 2010 alleging that the company’s production of PFAS had damaged drinking water and natural resources in the Twin Cities Metropolitan area.
  • 31. Health Risks: Australia Case Study â—Ź Multiple areas in Australia were contaminated with PFAS due to fire fighting activities on nearby defense force bases, creating what they call “the Road of Death.” â—Ź Members of these communities were exposed to PFAS primarily through the use of contaminated water including bore and river water on their properties, and via eating locally grown foods. â—Ź Australian Government Department of Health: “Currently there is limited evidence that exposure to PFAS causes adverse human health effects.” â—Ź This is in contrast to the USEPA, which has concluded PFAS are a human health hazard, and at high enough levels can cause immune dysfunction, hormonal interference, and certain types of cancer in humans.
  • 32. Health Risks: Australia Case Study â—Ź Recently, Australian National University’s College of Health & Medicine conducted an investigation into the exposure levels and potential health effects on “the Road of Death.” â—Ź Participants referred to what they suspected was a “cancer cluster” several times, which had occurred in a specific geographical location in the PFAS Investigation Area â—‹ Participants were particularly concerned about the onset of cancers and the deterioration of existing health conditions â—Ź However, ANU found no convincing evidence that PFAS contamination caused cancer in humans https://www.foe.org.au/water_industry_a_major_source_of_pfas_contamination
  • 33. Current Action For Awareness & Removal â—Ź The PFAS Action Act of 2021 was recently introduced by Michigan Representative Debbie Dingell, and aims to set a pathway for PFAS chemical to be designated hazardous substances. â—‹ This will open the door for future regulation in drinking water, as well as clean up under other existing legislations. â—‹ In April, the bill passed in the House by a vote of 241 to 183. â—Ź According to the Government Accountability Office, the Department of Defense spent $1.1 billion on PFAS clean up in 2020, and estimates it will spend $2.1 billion more in 2021. â—‹ Officials say it might take decades to fully address PFAS pollution.
  • 34. Existing Regulations â—Ź Safe Drinking Water Act (SDWA) sets enforceable Maximum Contaminant Levels (MCLs) for specific chemicals and can require monitoring of public water supplies â—‹ No current MCLs established for PFAS chemicals â—Ź EPA has issued a health advisory for PFOA and PFOS; however it serves as an informal guideline and is non-regulatory â—Ź EPA collected data for chemicals that were suspected contaminants in drinking water but did not have health based-standards set under the SDWA â—‹ Six PFAS substances were included for monitoring â—Ź The Toxic Substances Control Act (TSCA) includes a requirement for industry reporting of chemicals to the EPA. To date, 330 PFAS substances have been reported.
  • 35. Existing Regulations â—Ź Thus, there are no federal regulations for PFAS substances in the United States. â—Ź However, the California State Water Resources Control Board (SWRCB) Division of Drinking Water has set some of the most stringent PFAS advisories in the country â—‹ The focus of our project is a well site in Orange County â—‹ The control board set notification and response levels to regulate PFAS state-wide
  • 36. Ion Exchange (IX) â—Ź IX is a water treatment method where ionic contaminants are removed from water by exchange with another non- objectionable ionic substance. â—‹ Both the contaminant and the exchange substance must be dissolved and have the same type of electrical charge. â—Ź During the exchange process, any ionic contaminants in the water are traded for “healthier” ions provided by the exchange substance â—‹ The contaminant ions are then attracted or fixed to the exchange substance and cannot pass through to the rest of the water treatment process. https://en.wikipedia.org/wiki/Ion-exchange_resin
  • 37. IX Mechanism https://www.sciencedirect.com/science/article/pii/S0045 653521002460#fig4 â—Ź Anion exchange resins are made up of highly porous, polymeric microbeads that are basic and water insoluble. â—‹ Characteristics are chosen based on the substance being removed: strongly or weakly basic functional group, acrylic or styrenic matrix, and gel or macroporous cross linking â—Ź The resin beads have a positive functional group that is immobile with a negatively charged exchange ion attached. The negatively charged PFAS have a greater attraction to the immobile functional group, so the exchange ion is released and the PFAS are loaded onto the resin. â—Ź Anion IX removes 100 percent of the PFAS for a time that depends on the choice of resin, bed depth, flow rate, and which PFAS need to be removed
  • 38. IX Vessel â—Ź The IX resin is loaded into vessels. â—Ź The contaminated solution enters the top of the vessel, runs through a compact mixed resin bed, which will pick up and retain the PFAS contaminants. The treated water exits the vessel at the bottom. â—‹ Flow rate through the vessel is regulated by valves to ensure there is enough contact time for the ion exchange to take place. â—‹ Pretreatment is often needed before the IX vessels to ensure the most efficient use of the ion exchange resin.
  • 39. Resin Regeneration â—Ź IX resins can either be single use or regenerative â—‹ Since resin manufacturing has a large environmental burden, regenerative resins are preferred â—Ź Regeneration occurs within the vessels through a two step process: â—‹ Backwashing uses a back flow of water for the removal of debris such as organic matter â—‹ A regeneration solution, usually a brine, is back flowed through the resin to remove the attached PFAS from the resin and replace them with chloride ions â—Ź This process produces a concentrated waste stream of PFAS, which is typically disposed of through incineration. However, this method, along with microbial, sonochemical, electrochemical, and photon-based degradation are still being researched.
  • 40. Alternative Methods â—Ź Granulated activated carbon (GAC) is a porous adsorption media made from organic carbon materials which filters contaminants via a physical mass transfer process. â—‹ Its extremely high internal surface area contributes to adsorption, and heat is used to activate the media surface area. â—Ź Reverse osmosis removes contaminants by pushing the water under pressure through a semipermeable membrane, then the contaminant is collected for disposal. â—‹ This method is commonly used for household water purification and production of bottled water. â—Ź Nanofiltration is similar to reverse osmosis, however the membrane is not as “tight”. This method operates at a lower pressure and is less effective at removing dissolved solids.
  • 42. Advantages and Limitations For these reasons, we decided to model the drinking water well site with an ion exchange vessel for PFAS removal.
  • 44. Project Site Information â—Ź The project focuses on a residential area in the Orange County Water District â—‹ Well Site #7 includes an existing groundwater extraction well, clear well with a booster pump, and a chloramine disinfection system. â—Ź The facility was designed to produce up to 2,000 gpm of drinking water for delivery to the distribution system. The distribution system will go to a water treatment facility for further disinfection. â—Ź The pump station and chemical facilities were designed to host a future additional well and booster pump for a higher production rate of up to 4,000 gpm.
  • 45. Well Site Water Quality
  • 46. IX Resin We have chosen the Purolite PFA694E resin. â—Ź Reduces PFAS to non-detect levels ranging from 1 – 5 parts per trillion â—Ź Has a polystyrenic backbone which is crosslinked with divinylbenzene and a complex amino functional group â—Ź Removes PFAS via a dual mechanism of ion exchange and adsorption â—Ź Effective on short and long chain PFAS â—Ź Very high operating capacity and a higher total exchange capacity than its competitors â—Ź Regenerative
  • 47.
  • 49. Governing Equations â—Ź Langmuir Isotherm Where C is the dissolved chemical species, S is an adsorption site, CS is the chemical bound to the site, Keq is the equilibrium constant governing the reaction, and Stot is the total site concentration.
  • 51. Hydraulic Calculation Assumptions Criteria Assumptions Pumping System Upgrade existing pump to provide 2,000 gpm flow Number of pumps: 1 pump Static Water Level and Drawdown Level Suction Side HWL: 99 ft Suction Side LWL: -8 ft Pump System Conditions Intake Elevation: -119 ft Discharge Elevation: 307 ft (highpoint in pump piping) Min. Roughness Factor: 130 Max. Roughness Factor: 140 Altitude: 302 ft Water Temp.: 60 degrees F
  • 53. Pump System Head Loss and Motor Equations
  • 54. Modeling â—Ź To model the PFAS accumulation and the concentration gradient through the IX resin, STELLA will be used. â—Ź To model the influent and effluent concentration of PFAS through the IX vessel, SuperPro will be used. â—Ź To model the pump and pre filtration unit, Solidworks will be used. â—Ź To model the whole site process, AutoCAD and Google SketchUp will be used.
  • 55. IX Resin Model â—Ź Modeling PFAS accumulation in the ion exchange vessel in Stella
  • 57. â—Ź Modeling the concentration gradient in the ion exchange vessel also in STELLA
  • 59. â—Ź Modeling initial and final PFAS concentrations using SuperPro
  • 61. Results For IX Vessel, Prefiltration Unit, Pump, & Site Process with Solidworks & AutoCAD
  • 62. Purolite PFA694E Requirements for IX Vessel Number of Trains 2 Vessel Diameter 12 ft Media Volume per Vessel 420 ft3 Total Media Volume 1680 ft3 Vessel Area 113 ft2 Bed Depth 3.7 ft Linear Velocity 8.8 gpm/ft2 Specific Flow Rate 2.4 gpm/ft3 With these configurations, the lag vessel breakthrough will occur at approximately 189,000 bed volumes. This is equal to about 412 days if the system ran 24/7 at 2000 gpm.
  • 63. IX Vessel â—Ź For the IX vessel, we chose Evoqua Water Technologies to provide the vessel since they are able to make the vessel any size we need. â—Ź The following Solidworks model is based off of an Evoqua vessel and the dimension requirements from the Purolite resin.
  • 64. IX Vessel 3D Model Water Inlet (10 in diameter pipe) Regeneration Inlet (20 in diameter pipe) Resin Bed (3.7 ft deep) Treated Water Outlet (10 in diameter pipe) Waste Outlet (20 in diameter pipe) Vessel diameter: 12 ft
  • 65. Prefiltration Unit â—Ź The chosen prefiltration unit is a Yardney Angled Centrifugal Sand Separator. â—Ź From Yardney’s given flow size charts, the model chosen for a 2,000 gpm flow rate is a PCS-100LA. It can handle flow from 1300-2300 gpm â—‹ Particle size max: 1.5” â—‹ Removes sand, rock, grit, and other inorganic contaminants with fine filtration down to 75 microns. â—‹ 10” inlet/outlet diameter; 10” piping from prefiltration unit to IX vessel â—Ź There will be two prefiltration units in series in order to maximize the amount of water that can be treated.
  • 66. Prefiltration Unit Models 10” inlet 10” outlet 2” purge outlet
  • 67. Pump System Head Loss and Motor Calculations Cross sectional area: A=Ď€*r2 Where: D [10 in] r [0.417 ft] A [0.55 ft2] Velocity: V=Q/A Where: Q [2000 gpm = 32.68 fps] V [59.92 fps] Velocity head: Hv=V2/2g Where: g [32.2 ft/s2] Hv [55.75 ft] Pipe Friction Head loss: HI=L*Sf Where: Sf= (10.44Q1.85)/(10.441.85 *D4.8655) Sf [0.001175 ft/ft] L [216.64 ft] HI [0.255 ft] Input Shaft Power: Ps=(Q*TH)/(Cf*E) Where: TH [107 ft] E [80% efficiency] Cf [3960 for english units] Ps [67.55 hp]]
  • 68. Pump: Original Choice â—Ź For 2000 gpm flow rate, the WaterBoss Lineshaft Turbine Pump by Wolf Customized Pumps was chosen. Specifically model 14HME. â—Ź This pump was chosen because it can handle deep well types and the materials it’s made of allow it to handle harsh conditions (like the high flow rate and being underground).
  • 69. 1800 RPM Performance Curve for original pump choice â—Ź This performance curve was provided by Wolf. â—Ź Overall , this pump won’t be able to provide enough power, according to the calculations.
  • 70. Pump: New Choice â—Ź The new chosen pump is just one model up from the previous, which is a WaterBoss Lineshaft Turbine Pump by Wolf Customized Pumps, specifically their 14HMO. â—Ź It can handle a flow rate of 1500-3250 gpm â—Ź The bowl diameter is 14” and it is made of glass lined CL30 cast iron. The impeller material is C876 BRZ with an enclosed style. â—Ź The 10” piping can connect the pump to the pre-filtration unit with a fitted connector between the the bowl and the piping.
  • 71. 1770 RPM Performance Curve for new pump choice â—Ź This performance curve was provided by Wolf. â—Ź The new pump is able to provide more than enough power and can accommodate the system head.
  • 79. Cost Estimate â—Ź Ion exchange vessel â—‹ $200,000 â—Ź Resin â—‹ $1,000 per cubic foot â–  $1,680,000 for 4 vessels â—Ź Pre-filtration unit â—‹ $6,000 â—Ź Pump â—‹ $7,000 â—Ź Warehouse construction: $400,000 â—Ź Total: $
  • 80. Recommendations for Maintenance â—Ź The resin will need to be regenerated before the 412 day breakthrough time to keep the effluent concentration less than 2 ng/L â—‹ Backwashing will occur before the regeneration to remove any accumulated debris or fine resin particles â—‹ Regeneration with a 0.5% ammonium chloride brine results in higher PFOA and PFOS recovery rates â—Ź Eventually, the resin will be exhausted, and it will no longer be beneficial to regenerate as the removal efficiency decreases with each regeneration. â—‹ Since the lifespan is dependent on many factors such as temperature, oxidants, organics, and other foulants, it is difficult to predict the exact replacement period. Most strongly basic anion exchange resins last 5-8 years.
  • 81.
  • 82. Acknowledgements Alex Lin, P.E., AECOM Dr. Alessandro Franchi, P.E., AECOM Dr. Darnault, IngĂ©nieur Dr. Xiao Dr. Drapcho Dr. Lipscomb And the wonderful Capstone Team: Lauren Todd, Shirin Udwadia, Rachel Burger, Caroline Packard, Sophia Della Rocca

Editor's Notes

  1. Lauren Acknowledge sponsor: AECOM
  2. Sophia Read whole outline First we have introduction which include...
  3. We will now go into our introduction
  4. sophia
  5. Sophia Orange county is the reference for our project form aecom
  6. Sophia OUr rationale of our project is
  7. Sophia Emphasize the rationale *improve the speech More emphasis on the commas!!
  8. sophia
  9. Shirin We have a total of 8 tasks split up into 3 separate groups. The first three tasks are under data These are our list of tasks divided into 3 separate groups… and now we will go into the specifics This is a list of all 8 of our tasks which is divided into 3 separate groups The first 3 are...
  10. Shirin
  11. Shirin
  12. Shirin
  13. Shirin Caroline will now discuss the remaining tasks
  14. Caroline
  15. Caroline
  16. Caroline
  17. Caroline And finally task 8… Fix dashes between sub and task
  18. Sophia- Our project involves science, technology, engineering, mathematics, with a environmental protection and human health aspect. At the center, our project is to provide access to clean drinking water for all which happens to be a a grand challenge. Science, Technology, Engineering, & Mathematics (STEM) Make it bigger Environment health? grand challenge Write what grand challenge is on there , make it easier to see
  19. sophia
  20. Caroline Now we’ll be looking into our literature review findings...
  21. caroline
  22. Caroline
  23. Caroline Break down this chart a little more They can be classified as polymeric and non-polymeric PFAS, meaning they can either stay intact throughout their lifetime, or they can be broken down in to smaller PFAS which are still useful as well as harmful even after degradation
  24. Caroline
  25. Caroline found in water, air, fish, and soil
  26. Caroline
  27. Caroline The United States has yet to ratify the Stockholm Convention amendments Perfluorooctyl = PFAA
  28. Caroline Diving into the 3M company…
  29. Caroline
  30. Caroline
  31. Caroline
  32. Shirin So now what is some current actions for awareness and removal
  33. Shirin What are some existing regulations for PFAS What are some existing regulations for PFAS
  34. Shirin Lauren will now discuss ion exchange
  35. Lauren Cutting edge Key words Our project works on the the number ½ problem in the world water and PFAS Army study with the blood contamination For ion exchange video lets just restate what she said in the video. Don’t delete the video just yet
  36. Lauren More about how they work with the functional groups Explain more about functional groups and structure of everything But maybe just for the one we choose Show absorption and ion exchange and structure Confront reactions! Don’t avoid them Need to go more in depth and spend longer about the science of how this works *** use ix for all ion exchange
  37. Lauren Find a more modern ion exchange vessel More simplistic model Label each one Actual model of beads and vessel
  38. Lauren
  39. Lauren
  40. Lauren
  41. Lauren
  42. Next we will be discussing materials and methods
  43. lauren
  44. Lauren Change ug to microgram symbol for iron
  45. Lauren Pfas specific equations
  46. Lauren Highlight that resin Fix formatting Explain more about functional groups and structure of everything But maybe just for the one we choose Show absorption and ion exchange and structure Confront reactions! Dont avoid them\ Dont say as you can see, say compared with other resin the purolite has a higher exchange capacity
  47. lauren
  48. Sorption coefficient Kd = qi’(ci) ? for industrial scale adsorption processes, where high adsorbent loadings are desired, the equilibrium is non-linear, so the langmuir isotherm is most applicable Stot is total site concentration Plot [CS] on y axis and [C] on x axis, get the slope to be plugged into the mass balance -type out onto slide
  49. Lauren Remove the 7.3.6 Explain absorption for Kd And explain the difference with the pfas not moving and absorption Assumption of local equilibrium and negligible dispersion Q’ici is the slope of the languir isotherm at concentration ci Fix qi term to include prime For the final type our own equations and text out to be modified for final
  50. Rachel
  51. Rachel Provided by AECOM. Shows where the water intake is and where the pump is. Also shows that the design static head range is about 208’ to 315’
  52. Rachel
  53. lauren
  54. Lauren Ripening phenomena?? Or does it make it slower Simulate upper limits: 50 Small medium large 10, 39.8, 50, 100 Fix typo
  55. State how deep each layer 3.7 ft/5 = .74 ft = 8.88 in
  56. Lauren Find governing equations which they use
  57. Lauren Show range of PFAS concentrations Try to make it less blurry
  58. sophia
  59. Lauren From the Purolite sales representative, these are the requirements for the ion exchange vessel in order to use this particular resin. -clarify lead and lag configuration
  60. Rachel
  61. Rachel The regeneration inlet and waste outlet are for backwashing the resin Backwashing is used to regenerate the resin, which makes it more sustainable since it won’t need replacing as often. The resin bed is 3.7ft with 5 layers, each layer is about 9 inches
  62. Rachel
  63. Rachel Costs about $6000 -Say it was designed in solidworks -not filled with sand, just separating the sand out of the water
  64. Rachel These equations will be used to determine the pump system head loss and motor calculations.
  65. Rachel We were told that the site already has a pump, however AECOM cannot disclose that information due to their client. So we decided to choose a pump and assume that is what they have.
  66. Rachel Be able to explain the pump curve.
  67. Rachel
  68. Rachel
  69. Rachel This shows the site process as a whole with the pump, two prefiltration units, and 2 trains of IX vessels.
  70. Rachel
  71. Rachel This shows one of the two IX vessel trains. Explaining the lead and lag
  72. Sophia This aerial view displays where our site will be located in relation to the water source and residential living. Well site #7 sophia
  73. This model displays a close up view of the two options for the site where the ion exchange system will reside sophia
  74. Option 1 is a smaller shed. Inside the ion exchange vessels would reside with most of the pumping being in ground sophia
  75. Site two is large with the pumping systems being above ground. This site might be better as more maintenance and as regulations change, parts can be regularly replaced. sophia
  76. Sophia: 15 Shirin:10 Caroline:16 Rachel:12 Lauren:21 Cost from SuperPro Cost: Covid shortages so more expensive For construction Sophia -doble check resin costs with purolite and alex
  77. -recommended testing frequency?
  78. Sophia- Our project involves science, technology, engineering, mathematics, with a environmental protection and human health aspect. At the center, our project is to provide access to clean drinking water for all which happens to be a a grand challenge. Science, Technology, Engineering, & Mathematics (STEM) Make it bigger Environment health? grand challenge Write what grand challenge is on there , make it easier to see Pictures, graph, from superpro into which circle they fall under, change text to fit so that pictures are the center To tie everything together…., or in conclusion, we have… -in one of boxes show lab pictures and result, show design, and stella
  79. Shirin