Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
Upcoming SlideShare
Toys 4 techies #COMIT2016
Next
Download to read offline and view in fullscreen.

1

Share

Download to read offline

Safe Dig Packs improving utility safety #COMIT2016

Download to read offline

Presentation by Nick Boyle & Declan Grogan (Balfour Beatty & NDL Ltd) at COMIT 2016: Digitally Building Britain, September 2016
More information: http://www.comit.org.uk/liveblog

Related Books

Free with a 30 day trial from Scribd

See all

Related Audiobooks

Free with a 30 day trial from Scribd

See all

Safe Dig Packs improving utility safety #COMIT2016

  1. 1. Balfour Beatty - Digital Project Delivery BIM - Better Information Management
  2. 2. About Challenge Solution Implementation The Tech Results Implications NDL Questions Agenda
  3. 3. Communication is key – a common language • In your mind or on a blank piece of paper • X marks the spot • Travel 1 mile South • Travel 1 mile East • Travel 1 mile North • Back where you started? 4
  4. 4. 5
  5. 5. 6
  6. 6. 7
  7. 7. 8
  8. 8. Blackfriars Station – a common language? 9
  9. 9. Common Data Environm ent Client EIR BIM Execution Plan Informatio n Managem ent Plan Site Mobilisatio n IT Model Office Digital Site Survey Designers Using BIM Digital Planning Digital Cost Estimation Digital Safety Health Environm ent and Wellbeing Digital Temporar y Works Integration Digital Supply Chain Integration Tier 2.3 Digital Procurem ent – Tracking Deliveries Digital Site Setting Out i.e. Machine Control Digital Progress Recording Digital Quality / Form Collection Digital Asset Data Collection Digital Asset Managem ent GIS/ Handover Knowledg e Sharing Digital Project Delivery – Processes
  10. 10. Dartford HD GPR – Working with Supply Chain 2014 onwards 450 Design Clashes 400 Existing Service Clashes
  11. 11. Mobile digital technology on Site – 500No+ devices 12
  12. 12. Safer Dig
  13. 13. The Objective: To be safe  Want to be Lean and efficient – Reduce errors – Improve accuracy – Save time and money  Minimise disruption – S74’s – Lane Rentals
  14. 14. Safety First!  Does not replace onsite protocols or discovery  Better planned – Fewer surprises – The more efficient the job  Helps with reduced notice jobs Safer Dig
  15. 15. The Challenge: Can we automate this?
  16. 16. The Challenge 300+ Information providers  Manual production of map packs  Human error (Eastings & Northings)  Reduce Cost  Scale  Different  Systems  Formats  Scales
  17. 17. Solution – NDL SX  Found it from work with councils in planning and highways – Read & Write to any system – Non invasive – Workforce automation robotics engine – Transaction queuing and management  Balfour Beatty Wrapper / Front-End for Staff
  18. 18. Implementation  Started with Gas and Water  Implemented a dev and test environment on windows servers  Fully Virtualised Environment  Developed Balfour Beatty portal  Implemented queuing  Developed scripts for the NDL robot to drive the common systems – Replace the human operator – Work the way they work – Work at the speed they work  Security Layer  Transaction monitoring dash board
  19. 19. The Tech Portal Dashboard Manager Map Pack Document Room User / Contract Credentials Queue - SQL target systems Gas Electric WaterTelecoms SQL Server
  20. 20. Implementation Challenges  Target Systems do change – 1st and 2nd line support – .Net Developers - Rarely needed – ITIL Change Management processes  Care to be a ‘well behaved user’  Back office availability – Queue  Now asynchronous queuing / load balancing
  21. 21.  Eastings and Northings entered once  No more manual intervention  25 – 30 minutes saved per job  Now have a bulk import option – Plan tasks – direct  Full Audit Trail The results 55 target systems 8000 jobs 120,000 maps
  22. 22. The results  Maps delivered consistently and to scale  Jobs are planned more easily  Crews are better informed and safer  Moved from just Gas & Water to Power Transmission  Future wider use across Balfour Beatty
  23. 23. COMPUTER SAYS NO?
  24. 24. Wider implications  B.I.M. – Interact with sub contractor systems – Bulk Data Migration into/out of BIM  Automate the supply chain / network  Take data from the field  Get it to the right place
  25. 25. About NDL  Tools Supplier – Integration and Automation – Cross platform mobile  Serving – LG – Health – Social Housing  Find out more at www.ndl.co.uk Join a webinar:- 9th November?
  26. 26. Thank you for your time
  • Luatnkt

    Oct. 28, 2016

Presentation by Nick Boyle & Declan Grogan (Balfour Beatty & NDL Ltd) at COMIT 2016: Digitally Building Britain, September 2016 More information: http://www.comit.org.uk/liveblog

Views

Total views

532

On Slideshare

0

From embeds

0

Number of embeds

268

Actions

Downloads

3

Shares

0

Comments

0

Likes

1

×