Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
Kondwani Mtalimanja“CONNECTING AFRICA IN A 21STCENTURY INTERNATIONAL NGO”
AgendaIntroduction to the Save the Children International     • Vision     • Mission     • Theory of ChangeIT Support Mode...
Save the Children International• WE ARE the world’s leading independent organisation for children.•    OUR VISION is a wor...
Our Theory ofChange is…
AgendaIntroduction to the Save the Children International     • Vision     • Mission     • Theory of ChangeGlobal IT Suppo...
Total number of IT staff                                      Region 3 MEE  142                                           ...
– Network Team (2)Country, Regional and Global IT Teams all work                                                       – F...
AgendaIntroduction to the Save the Children International     • Vision     • Mission     • Theory of ChangeGlobal IT Suppo...
Our IT Strategyis looking at allIT capabilities,fromfoundational tostrategicallydifferentiating
In 2012 we Delivered…                                Transitioned            Developed a set of Delivered Phase 1 of      ...
AgendaIntroduction to the Save the Children International     • Vision     • Mission     • Theory of ChangeGlobal IT Suppo...
However there are Challenges that we face… • Network Capacity e.g. VSAT and Government restrictions • IT Skills Capacity e...
Thank You Very Much      Q&A
Upcoming SlideShare
Loading in …5
×

Kondwani Mtalimanja, IT Manager at Save the Children - Current IT situation in Africa and the it strategy work we are currently completing at Save the Children

649 views

Published on

Kondwani Mtalimanja, IT Manager at Save the Children spoke at the CIO Africa Event 2013

Published in: Spiritual, Business
  • Hello there! Get Your Professional Job-Winning Resume Here! http://bit.ly/topresum
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

Kondwani Mtalimanja, IT Manager at Save the Children - Current IT situation in Africa and the it strategy work we are currently completing at Save the Children

  1. 1. Kondwani Mtalimanja“CONNECTING AFRICA IN A 21STCENTURY INTERNATIONAL NGO”
  2. 2. AgendaIntroduction to the Save the Children International • Vision • Mission • Theory of ChangeIT Support ModelIT Strategy and 2012 DeliverablesChallengesQ&A
  3. 3. Save the Children International• WE ARE the world’s leading independent organisation for children.• OUR VISION is a world in which every child attains the right to survival, protection, development and participation.• OUR MISSION is to inspire breakthroughs in the way the world treats children, and to achieve immediate and lasting change in their lives.
  4. 4. Our Theory ofChange is…
  5. 5. AgendaIntroduction to the Save the Children International • Vision • Mission • Theory of ChangeGlobal IT Support ModelIT Strategy and 2012 DeliverablesChallengesQ&A
  6. 6. Total number of IT staff Region 3 MEE 142 Region 1 S&C Asia Iraq 1 Armenia o/s Nepal/Bhutan 3 In Countries / Regions 127 Georgia 1 Afghanistan 7 In Global roles 15 Jordan1 2 Central Asia2 5 Albania o/s Region 5 Kosovo o/s Pakistan 19Most of our staff W&C Africa NW Balkans o/s Bangladesh Sri Lanka 12 2 Yemen 2are based in Senegal 2 oPt 1 Total staff : 48 Sierra Leone 1countries… Burkina Faso 1 Lebanon Egypt 1 o/s DRC 3 Region 6 Region 2 Nigeria 3 East Africa Liberia 1 Total staff : 9 SE&E Asia Ethiopia 7 Cote d’Ivoire 1 Rwanda 1 DPRK - Niger 1 Laos 1 Region 4 LAC Mali 1 Uganda 2 Cambodia 2 Somalia 3 Nicaragua 2 Guinea 1 Region 7 Kenya 2 Philippines 3 Colombia 1 Total staff : 15 Vietnam 1 Peru 1 Southern Africa Tanzania 1 Myanmar 3 South Sudan 2 Ecuador o/s Indonesia 3 Mozambique 2 Sudan 3 El Salvador 1 China 1 Malawi 1 Haiti 4 Singapore 2 Zambia 1 Total staff : 21 Bolivia 3 Total staff : 16 Zimbabwe 1 Total staff : 13 Total staff : 5
  7. 7. – Network Team (2)Country, Regional and Global IT Teams all work – FMS Team (4)together to support… – AMS Team (1) – Intranet (1) StC – Servers / storage ( 2)Level 3 Global – Help desk (1) (UK & US) Regional IT (6)Level 2 SCI SCI SCI SCI Asia (2) MEE (1) Africa (2) LAC (1) Country 1 Country 3 Country 5 Country 7Level 1 1 – IT Manager Country IT 2 – IT Assistant (121) Country 2 Country 4 Country 6 Country 8 3 – IT Techs Sub offices
  8. 8. AgendaIntroduction to the Save the Children International • Vision • Mission • Theory of ChangeGlobal IT Support ModelIT Strategy and 2012 DeliverablesChallengesQ&A
  9. 9. Our IT Strategyis looking at allIT capabilities,fromfoundational tostrategicallydifferentiating
  10. 10. In 2012 we Delivered… Transitioned Developed a set of Delivered Phase 1 of 11,000+ standard globalAgresso system to over email accounts to IT Procedures 50 countries globally, including O365 ( being updated) 9 in ESA Built a new global Delivered IT Team Awards Mgmt System 1.0 Delivered SCM Project Built a new template for Launched intranet To 6 Ethiopia Country web sites sites
  11. 11. AgendaIntroduction to the Save the Children International • Vision • Mission • Theory of ChangeGlobal IT Support ModelIT Strategy and 2012 DeliverablesChallengesQ&A
  12. 12. However there are Challenges that we face… • Network Capacity e.g. VSAT and Government restrictions • IT Skills Capacity e.g. Asia vs. Africa • Getting IT to be seriously taken by Country Office Directors
  13. 13. Thank You Very Much Q&A

×