DATA CENTRE PLANNING AND EXECUTION 
- A SURVIVAL GUIDE 
Wolfgang Kuhl 
wolfgang.kuhl@pharmaserv 
+49 6421 39 5005 
http://...
Agenda 
© Pharmaserv GmbH & Co. KG, 2014 
CIO Event Berlin 06.11.2014 
 Introduction 
 Project Review 
 Building Techno...
At a glance 
© Pharmaserv GmbH & Co. KG, 2014 
06/11/2014 
 Address: 
Pharmaserv GmbH & Co. KG 
Emil-von-Behring-Straße 7...
Services 
© Pharmaserv GmbH & Co. KG, 2014 
06.11.2014 
 Project planning, provision and complete management of plants an...
Starting Situation 
Though there had been large investments in 
technology upgrades throughout the last ten years, the 
si...
Building Plan 
Racks Building Services 
6 © Pharmaserv GmbH & Co. KG, 2014 
CIO Event Berlin 06.11.2014
Construction (fast motion vid) 
7 © Pharmaserv GmbH & Co. KG, 2014 
CIO Event Berlin 06.11.2014
Building Technology Basics for IT Managers 
Electricity 
8 © Pharmaserv GmbH & Co. KG, 2014 
Eigene Fußzeile 06.11.2014 
...
Building Technology Basics for IT Managers 
Capacity: Estimates / Experienced Data 
 How much Power per Rack? 
Rough esti...
Building Technology Basics for IT Managers 
Power Distribution 
 Emergency Power 
 UPS 
 Redundancy 
 Sufficient Capac...
Building Technology Basics for IT Managers 
Cooling 
11 © Pharmaserv GmbH & Co. KG, 2014 
CIO Event Berlin 06.11.2014 
 C...
Building Technology Basics for IT Managers 
Cold Production 
 Direct / Indirect Free Cooling 
 Open Windows when it is h...
Building Technology Basics for IT Managers 
Cooling 
inrow 
cooler 
Approach Main Features Benefits 
13 © Pharmaserv GmbH ...
Building Technology Basics for IT Managers 
COP 
 Coefficient of Performance 
 Input / Output 
 Input: (electric) energ...
Building Technology Basics for IT Managers 
Building Security 
Fire 
Prevention 
© Pharmaserv GmbH & Co. KG, 2014 
Distinc...
Building Technology Basics for IT Managers 
Building Security 
CCTV 
© Pharmaserv GmbH & Co. KG, 2014 
Gates, corridors an...
Failure Probability and Availability 
17 © Pharmaserv GmbH & Co. KG, 2014 
CIO Event Berlin 06.11.2014 
 Definitions 
 F...
Failure Probability and Availability 
Definitions 
 Redundancy 
the duplication of critical components or functions of a ...
Failure Probability and Availability 
FAQ 
 Is failure probability the counterpart of availability? In worst case: Yes. 
...
Standards 
Uptime Institute Tier Levels (Subset of Requirements) 
Tier Redundancy Availability Outage 
1 N 99.67% 28.8h 
2...
(Next Generation) Security Issues 
 Communication Infrastructure of Building Technology and IT are very similar (IP, 
Eth...
Agenda (detailed, backup) 
© Pharmaserv GmbH & Co. KG, 2014 
CIO Event Berlin 06.11.2014 
 Introduction 
 Pharmaserv 
 ...
Upcoming SlideShare
Loading in …5
×

Wolfgang Kuhl, CIO at Pharmaserv - Data Centre Planning and Execution - A Survival guide

1,135 views

Published on

Wolfgang Kuhl, CIO at Pharmaserv presented at CIO Event Europe in September 2014

  • DOWNLOAD FULL BOOKS INTO AVAILABLE FORMAT ......................................................................................................................... ......................................................................................................................... 1.DOWNLOAD FULL PDF EBOOK here { https://tinyurl.com/y8nn3gmc } ......................................................................................................................... 1.DOWNLOAD FULL EPUB Ebook here { https://tinyurl.com/y8nn3gmc } ......................................................................................................................... 1.DOWNLOAD FULL doc Ebook here { https://tinyurl.com/y8nn3gmc } ......................................................................................................................... 1.DOWNLOAD FULL PDF EBOOK here { https://tinyurl.com/y8nn3gmc } ......................................................................................................................... 1.DOWNLOAD FULL EPUB Ebook here { https://tinyurl.com/y8nn3gmc } ......................................................................................................................... 1.DOWNLOAD FULL doc Ebook here { https://tinyurl.com/y8nn3gmc } ......................................................................................................................... ......................................................................................................................... ......................................................................................................................... .............. Browse by Genre Available eBooks ......................................................................................................................... Art, Biography, Business, Chick Lit, Children's, Christian, Classics, Comics, Contemporary, Cookbooks, Crime, Ebooks, Fantasy, Fiction, Graphic Novels, Historical Fiction, History, Horror, Humor And Comedy, Manga, Memoir, Music, Mystery, Non Fiction, Paranormal, Philosophy, Poetry, Psychology, Religion, Romance, Science, Science Fiction, Self Help, Suspense, Spirituality, Sports, Thriller, Travel, Young Adult,
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Hello there! Get Your Professional Job-Winning Resume Here! http://bit.ly/topresum
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

Wolfgang Kuhl, CIO at Pharmaserv - Data Centre Planning and Execution - A Survival guide

  1. 1. DATA CENTRE PLANNING AND EXECUTION - A SURVIVAL GUIDE Wolfgang Kuhl wolfgang.kuhl@pharmaserv +49 6421 39 5005 http://www.rechenzentrum-hessen.de/ © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014
  2. 2. Agenda © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014  Introduction  Project Review  Building Technology Basics for IT Managers  Failure Probability and Availability  (Next Generation) Security Issues 2
  3. 3. At a glance © Pharmaserv GmbH & Co. KG, 2014 06/11/2014  Address: Pharmaserv GmbH & Co. KG Emil-von-Behring-Straße 76 35041 Marburg, Germany Phone +49 (0)64 21 39 - 60 00  CEO: Thomas Janssen  Established in: 1997  Employees: 370  Turnover in 2012 in €: 73 million Plant section Görzhausen Main plant
  4. 4. Services © Pharmaserv GmbH & Co. KG, 2014 06.11.2014  Project planning, provision and complete management of plants and buildings  Energy management and supply with a high security of supply guarantee  Development and implementation of state-of-the-art information and communication solutions  Integrated technical services from the planning phase to the turn-key production plants  Logistics services including GMP warehouses for pharmaceutical base materials  Occupational health and consulting services regarding environmental protection, occupational safety and waste disposal measures
  5. 5. Starting Situation Though there had been large investments in technology upgrades throughout the last ten years, the sites still were lacking a state of the art datacentre for the companies at the sites Based on our site-master-plan and a weighted rating matrix a former construction building was chosen as location for the new data centre. Since there is little or no supply for housing in the region, pharmaserv decided to make the datacentre available to companies outside the sites too. 5 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06/11/2014
  6. 6. Building Plan Racks Building Services 6 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014
  7. 7. Construction (fast motion vid) 7 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014
  8. 8. Building Technology Basics for IT Managers Electricity 8 © Pharmaserv GmbH & Co. KG, 2014 Eigene Fußzeile 06.11.2014  Challenges  Capacity (Sizing)  Availability  In Case of Fire
  9. 9. Building Technology Basics for IT Managers Capacity: Estimates / Experienced Data  How much Power per Rack? Rough estimate: 5kW Average in our datacentre: 3kW  How much Power All in All? + 30% for cooling + 10% for UPS + 20kW general usage in a medium sized datacentre E.g. for 50 Racks: 50 x 5kW x(1 + 0.3 + 0.1) + 20 kW = 370kW  Limit for Single Rack Fuse: 16A 3 power lines 3 x 16A x 230V = 11kW 9 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014
  10. 10. Building Technology Basics for IT Managers Power Distribution  Emergency Power  UPS  Redundancy  Sufficient Capacities  Different Fire Zones Consider different scenarios, e.g.: What will happen to the temperature when the datacentre is running on UPS? sub distr. cooling Sub distr. general 10 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06/11/2014 UPS-A UPS-B UPS distr. B main distribution A main distribution B sub distr. A sub distr. B UPS distr. A
  11. 11. Building Technology Basics for IT Managers Cooling 11 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014  Challenges  Capacity (Sizing)  Availability  Efficiency  Ease of maintenance  Risk of leakage
  12. 12. Building Technology Basics for IT Managers Cold Production  Direct / Indirect Free Cooling  Open Windows when it is hot inside: direct free cooling  Build a heat exchanger into your window: indirect free cooling  Add recirculation coolers and pipe refrigerant into the heat exchanger: more sophisticated free cooling  Geothermal Cooling Like above, but ground water instead of air is used 12 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014 Source: wikipedia  Compressor / Heat Pump (Refrigeration Cycle) 1. Condenser 2. Expansion valve 3. Evaporator 4. Compressor  Substantially higher energy consumption
  13. 13. Building Technology Basics for IT Managers Cooling inrow cooler Approach Main Features Benefits 13 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06/11/2014 20 kW 20 kW 20 kW 20 kW buffer-storage cold corridor 20°? 30°? valves pumps Centralised Battery of cooling units blows cold air into the raised floor Easy to build and to maintain; fewer leakage issues De-Centralised Refrigerant is brought as close as possible to the heat load Energy efficient; raised floor not mandatory; fire zones easier to implement
  14. 14. Building Technology Basics for IT Managers COP  Coefficient of Performance  Input / Output  Input: (electric) energy needed to produce cold  Output: cooling energy  COP <= 3:  14 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014
  15. 15. Building Technology Basics for IT Managers Building Security Fire Prevention © Pharmaserv GmbH & Co. KG, 2014 Distinct Fire zones; Walls and doors are fire resistant >= 90 min (F90) Fire Detection Early fire detection with ASD Fire Extinction Automatic fire extinction 15 CIO Event Berlin 06.11.2014
  16. 16. Building Technology Basics for IT Managers Building Security CCTV © Pharmaserv GmbH & Co. KG, 2014 Gates, corridors and critical systems. 24x7 monitoring, recording for forensic purposes. Compliance with local laws (in Germany: Betriebsverfassungsgesetz / Datenschutzgesetze) Access Control AAA: Authentication, authorization, accounting; security zones; separation gate; outbound access control; anti-pass-back, Health / Safety Things to consider: dead-man’s button; oxygen reduction; extinguishing agent; workplace; emergency exits; first aid kit 16 CIO Event Berlin 06.11.2014
  17. 17. Failure Probability and Availability 17 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014  Definitions  FAQ  Standards
  18. 18. Failure Probability and Availability Definitions  Redundancy the duplication of critical components or functions of a system with the intention of increasing reliability of the system [wikipedia.org]. N+2  N units suffice, 2 units are redundant  Availability vs. Reliability Availability is the ratio of the total time a functional unit is capable of being used during a given interval to the length of the interval. Reliability describes the ability of a system or component to function under stated conditions for a specified period of time. [wikipedia.org] 18 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014
  19. 19. Failure Probability and Availability FAQ  Is failure probability the counterpart of availability? In worst case: Yes. Availability of 90% means downtime of 10% in worst case. You will expect the system to run 100% of the time, but you will be prepared to deal with 10% downtime.  How about an availability of 99.0%? No go. 1 year = 8,760h 99.0% availability  87.6h downtime  If I add a redundant system, is failure probability cut by half? Nearly never. 2 units, failure probability 1% each Resulting failure probability: 1% x 1% = 0,01% 19 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014
  20. 20. Standards Uptime Institute Tier Levels (Subset of Requirements) Tier Redundancy Availability Outage 1 N 99.67% 28.8h 2 N+1 99.75% 22.0h 3 N+1 99.98% 1.6h 4 2 x (N+1) 99.99% 0.8h In Marketing it is sometimes sufficient to only meet one criteria Comparable Standards from BITKOM, ECO or TUV Rheinland Other (nontechnical) standards: ISO 27001, PS 951, ISAE 3402 20 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014
  21. 21. (Next Generation) Security Issues  Communication Infrastructure of Building Technology and IT are very similar (IP, Ethernet, Internet Access)  Standard passwords are often not changed  Common exploits applicable  Servers are vulnerable during start up  Attack Building Technology  shut power off an on  attack Server during start up 21 © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014
  22. 22. Agenda (detailed, backup) © Pharmaserv GmbH & Co. KG, 2014 CIO Event Berlin 06.11.2014  Introduction  Pharmaserv  How you can benefit from this workshop  How I can benefit from this workshop  Project Review  Fast motion vid  The key project parameters  Building Technology Basics for IT Managers  Electricity  Cooling  Building security  Standards  Uptime Institute, BITKOM, TÜV Rheinland  Certification  (Next Generation) Security Issues  Building Technology vulnerabilities  Hybrid Attacks 22

×