Implementing NDC target under MRV: Challenge and principle on land based sector
May. 15, 2018•0 likes
1 likes
Be the first to like this
Show More
•380 views
views
Total views
0
On Slideshare
0
From embeds
0
Number of embeds
0
Download to read offline
Report
Environment
Presented by Rizaldi Boer of the CCROM-Bogor Agricultural University at the 3rd Asia-Pacific Rainforest Summit, on 23–25 April 2018 in Yogyakarta, Indonesia
Implementing NDC target under MRV: Challenge and principle on land based sector
Logo here
23-25 April 2018: Rizaldi Boer
CCROM-Bogor Agricultural University
Implementing NDC
Target under MRV
Challenge and Principle
on Land Based Sector
Logo here
LUCF in NDC
What challenges in the
implementation of MRV for
NDC achievement from
forest and NDC
achievement in general?
What scientific
recommendation related to
the MRV implementation
for NDC from forest?
23-25 April 2018: Rizaldi Boer
CCROM SEAP-Bogor Agricultural University
2
PROLOG
• By 2030, under the
BAU Indonesian
emission will reach
2.87 Gt CO2e (more
than doubled of 2010
emission)
• LUCF is expected to
contribute to about
70% of
the emission reduction
target of the NDC
Logo here
Source: - Ministerial Regulation No. 70/2017
- Guidelines of MRV REDD+ Indonesia
INSTITUTIONAL MECHANISM FOR MRV
23-25 April 2018: Rizaldi Boer
CCROM SEAP-Bogor Agricultural University
Logo here
Source: - Ministerial Regulation No. 70/2017
- Guidelines of MRV REDD+ Indonesia
INSTITUTIONAL MECHANISM FOR MRV
23-25 April 2018: Rizaldi Boer
CCROM SEAP-Bogor Agricultural University
Logo here
Source: - Ministerial Regulation No. 70/2017
- Guidelines of MRV REDD+ Indonesia
INSTITUTIONAL MECHANISM FOR MRV
23-25 April 2018: Rizaldi Boer
CCROM SEAP-Bogor Agricultural University
Annex to Decision 14/CP.19
- Institutional system for monitoring
- Consistency in methodology used
for construction of RL and results
- Data/information that allows for
reconstruction of results
- Use most recent IPCC GL
- AD: combine use of RS and ground
base
- Estimates: transparent, consistent,
as far as possible accurate ~ reduce
uncertainties
Logo here
Source: - Ministerial Regulation No. 70/2017
- Guidelines of MRV REDD+ Indonesia
INSTITUTIONAL MECHANISM FOR MRV
23-25 April 2018: Rizaldi Boer
CCROM SEAP-Bogor Agricultural University
Annex to Decision 14/CP.19
- Institutional system for monitoring
- Consistency in methodology used
for construction of RL and results
- Data/information that allows for
reconstruction of results
- Use most recent IPCC GL
- AD: combine use of RS and ground
base
- Estimates: transparent, consistent,
as far as possible accurate ~ reduce
uncertainties
1. Institutional
arrangement and
regulations
2. Human capacity
and financial
resources
3. Methodology
• Estimation (AD
and EF)
• Uncertainty