.
Rd

7
US-2

Barton
Av

U
S

ma
yT
ho
An
d

Ge
org
ia

Av

Market St

wR
d
Ho
llo
ley

St

Shi
p

to n
Ho
us

Dou
g

l as...
D

ld
O

on

Le
e

Pk

SR-1
11

Notes:

t
ay

Pk

Da
yto
n

Pk

1. ID numbers correspond to project list tables included a...
ma
yT
ho
An
d

wR
d

d
Turner R

ley
Shi
p

Funded and constructed by 2020

New Roadway
Intersection Improvements,Preventa...
Chattanoog
ga‐Hamilton Cou
unty/North Geo
orgia 2040 Regio
onal Transportation Plan 

Table 8.1

Fiscally Constrained Proj...
Chattanooga‐Hamilto
on County/Nort
th Georgia 2040 Regional Trans
sportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RTP ...
Chattanoog
ga‐Hamilton Cou
unty/North Geo
orgia 2040 Regio
onal Transportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RT...
Chattanooga‐Hamilto
on County/Nort
th Georgia 2040 Regional Trans
sportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RTP ...
Chattanoog
ga‐Hamilton Cou
unty/North Geo
orgia 2040 Regio
onal Transportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RT...
Chattanooga‐Hamilto
on County/Nort
th Georgia 2040 Regional Trans
sportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RTP ...
Chattanoog
ga‐Hamilton Cou
unty/North Geo
orgia 2040 Regio
onal Transportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RT...
Chattanooga‐Hamilto
on County/Nort
th Georgia 2040 Regional Trans
sportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RTP ...
Chattanoog
ga‐Hamilton Cou
unty/North Geo
orgia 2040 Regio
onal Transportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RT...
Chattanooga‐Hamilto
on County/Nort
th Georgia 2040 Regional Trans
sportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RTP ...
Chattanoog
ga‐Hamilton Cou
unty/North Geo
orgia 2040 Regio
onal Transportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RT...
Chattanooga‐Hamilto
on County/Nort
th Georgia 2040 Regional Trans
sportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RTP ...
Chattanoog
ga‐Hamilton Cou
unty/North Geo
orgia 2040 Regio
onal Transportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RT...
Chattanooga‐Hamilto
on County/Nort
th Georgia 2040 Regional Trans
sportation Plan 

State 

Reven
nue 
Tier
r 

2040 
RTP ...
 Project Maps & List: Draft 2040 Regional Transportation Plan
Upcoming SlideShare
Loading in …5
×

Project Maps & List: Draft 2040 Regional Transportation Plan

648 views

Published on

List and maps of all transit, bicycle/pedestrian, and roadway projects within the 2040 RTP.

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
648
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Project Maps & List: Draft 2040 Regional Transportation Plan

  1. 1. . Rd 7 US-2 Barton Av U S ma yT ho An d Ge org ia Av Market St wR d Ho llo ley St Shi p to n Ho us Dou g l as St ! Broad St 141 St Ra mp To I1 24 Lin d say 5TH 3R D ST E ST E 136 11T H ST 10T H E ST E ML t ST W rS tn u Rid g eR d he Bro a dS t St ay M sR d Av Orc ha oHu g ain llie Rd Mccallie Ferry Rd U S 138 k 137 dP U S v hw oo 136 US27 yA Av Ce nt 138 SR -6 Pk Tsati T e r Av S rd K E Me o ad ie wv w HS TE d R St nob on ST 17T ! ! ! Mo n ! tl a ke Rd Love ll Rd 23R D EM Kel ly St yP ! Study Area rd Orc ha vd Bl ffo Gi Do ll Ar ms tro n le vil ss Ro Tennessee-Georgia State Line Inset 1 dR d gR d Rd Hixson Pk Po e r Rd Da yto n te Hotw a Water Body 319 ¬ « Lovell Rd Da yt o n Pk N County Boundary yto Da 5 ! Roberts Mill Rd Miles Dallas Hollow Rd 27 £ ¤ erd Sil v ee R d. Rd e R d Fa ir Oo le Rd rR d Glo ve eR d Ri dg t Tva A to n Dr Bay Shore Rd Pk n Ha rri so rR d Tyn e Rd Va ll fS Lu p Hic ko ry ea cce ss Rd k Altamont Av Enterprise South 75 § ¦ ! ¨ _ Lee or e ie P kwy St Ma in Little on Edg m n to Pa tte R d dD r dla n ife nd Wo o St a Rd Jen kins Pin e Rid g eR d Rd old R ifer G ap R d Oolt ewa h-Rin gg 317 ¬ « Stan d Rd d Jen kin s pR W es l ey an ks Ba n l Rd arre NG unb Ga sH ill R d Mo rri Rd SR-32 1 rain erd EB Cherokee Valley Rd 151 Br idg e wa y 41 41 £ ¤ 2 Rd 2 ¬ « n Dr Boynto National Military Park v le C Notc h Rd _ h Jo ! Thre e Burning Bush Dyer Rd p Po g rin Sp lar u d sR an el d St Evitt St Burning Bush Rd Rd United States Highway 27 er Sta t 75 § ¦ ¨ eR ou te 2 27 e1 Potts Rd Rd Oa k Ha mil lH ollo Rd wR d M ou Cov e nt Rd Pi sg ah R d £ ¤ ¬ « Pos t 3 Rou t Sta te Red Be lt Bu rn i ng Bu s hR d elt R d 151 01 Red B e2 Ave Lee Crittenden Ave Davis Ridge Rd t Rou Highway 19 gs Rd te Sta Osburn R d Rd Poplar Sprin 51 on ns Lee-Gordon Mill Rd EL ong llo Ho 7 ay 2 ighw NH Peav in e Rd d yR aja ck Rd Ban d ck Ni 2. Transit projects not shown on the map include: transit general (operations and maintenance of existing CARTA system), frequency improvements on existing CARTA routes, set aside for additional transit capacity, feasibility studies for bus rapid transit and light rail transit lines. W 1. ID numbers correspond to project list tables included as Table 8.1 of the RTP document. Long Hollo w Rd d wR Notes: Stewart Rd sH igh Rd te tate Quarles Rd Ste wa rt eR ou dS Pine Grove Rd Dr Dietz Rd ! w State Route 146 Sta t Un ite Cheroke e Valley Rd Rd Rou te Mac k le State Smit hR d Page Rd Cross St il sv ay Gr Keith Rd oor eR d SM Rd rie n d Rd Rd low ford ord NC onc Rd Vance Igo u Rd ev ie Pk E Dr rsity Dr ! d eR NM oor ir A v Bel vo gold e ge nt R d Univ e Hic ko ph Sh e Talley Rd N ll Co Mc b Rd Green rG ap yR d ry V alle sD r Mo s a n to wn R d _ Ger m an Ge rm Lakes wn Rd Rd Re id el B Tun n NC ham to w nR d Deb b Pk lvd Av lain ber Av Av on Do ds Rd N Cre st eD r ino l Park City Rd Sh al 139 tR d mi t Sch W Rd N Jenkins d dR 135 d Forrest Rd as R s Highw ay 27 United S tate eR d Mi ss ion Ri dg Rd Dr yV al l ey Rin g La k Hog a 193 way Hig h ge Dr wR d Wi ld Crestr id Ho llo Hamilton Place U S Steele Rd nR d Mcfarland Ave Rd Valle y oga ano Cha tt Chickamauga Rd Rd ck d Gateway Ln ee lR Bil d NL ong Ap iso n U S Re ed s d Lytle R yR Nic k-A -Ja Ro an em SS Cres t Rd S Ho ga n Indian Ave Wilson Rd Rd e5 Ro ut Sta te Hw y nic Sc e Lula Lake Rd 9 18 te Rd Rd y Hw 11 £ ¤ Tal la lv Koa B Rd Thom Rd 142 !p Ro u e tt low ford U S ! m Ra Ly tl e Sha l it Ex te Ben n ed er e Le 1 St a 138 Post Rd Highway 813 alle WV Nick-A Jack Rd te James St 2 ¬ « State Route 2 u Ro 11 te am St U S Rd y hwa Hig h ing £ ¤ ce 134 ! m Bir e Pik U S a St 11 I-24 Sp ru Rd Park City Salem Rd I-24 Maple St v sA Do dd v sA Do dd ! rest WC W Gordon Ave Glentana St ok e ar A v 4TH AV 136 n ai Br ! 299 r 137 d sR os nR Rd d tR te Rou jo D y Hw on Fr State Na va U S h Jo U S _ Chattanooga Airport rd Rd Shallowfo St N tS wS Will o AV nR d nR d Wils o Wo rkm a HS TE No ah la Sh o Dr e rs id Ri ve tS ry S Hic ko 38T Av r al Ce nt v eA Westside Av 7 Le St Av cla w Ho ltz Av Ca in 4TH ne Ten St Elmo Av Och s Hw y NB r ag gA v E Brow Rd Tennessee Av n Av enso Alto n sse e Par k Av Blv d Pk ie tch ha W au Step h TE 37TH S St lvd e Le Rd r dD ST E v xB rG ap Graysville Fle 38T H yA Oa k S Crest Rd W oo e tw ST W Blvd ville Ross g Av 34 n S Brag § ¦ ¨ aL St ST E Clio Av -11 US Wa g ta u 38T H Bai le dife ! ! 40TH ST W ai n TE 28T H v Kel ly Av Ce nt r al t Ma rke tS t dS Bro a 23R DS 153 Rd EM yA Av Will ow ! sa Lin d nd Rd Moccasin Be rry R d ns F e Bro w Inset 1 U S Pk Bai le HS TE Sh ol Av Barton Eld e Burge s Ca Ch est rter S nut t St Broad St y Ho St ust on Dou St gl a sS t s Rd Market S t Pineville Rd Rd n ta in rM ou ie tch ha St llie Sta n ! ! 20T Mc ca y Old Lee Hw Rd u Wa 24 SR -1 ain ST E Wi lco Rd Creek Spring gs ST .W . WM St ort Airp wy ings H Cumm ! Cu mm in H 3R D t 153 SR- 20 T M 10T L Kin g HS T E Blvd U S 141 ST E rS ld O Bonny Oaks Dr t 5TH ¬ « lS ! ss Gla Glenwood Dr ! ! . wy Pk 153 el 4TH ST E nt Rd pb m Ca ro erf Riv ! y Av ewa Gat Av son v rA Am n N Market St Wild e ! Man d. res R Frazie r ufactu n ey o ds Do St Rd om 17 SR- erd la H wy. Wis d ico a Add i Av Jer s m As h ll Da d sR Hw y nR d nP wy Rd r la H Webb Rd lD ico t Rd Av E Ly n do nA v Lu llw a y kw ter tP Rd d nR ta i or ia Kings Poin Ha rris o un n po Du Mo Eas t al M em Am n ! n Sig on A v nl Pro ffitt Rd ! Cass andr a Big ion Rd ey El y p Cham N Rd Mar tin Pk Ln Av ar Cr ee La m kR d 129 Snow Hill Rd in U S Ashland Ter Hunter Rd Rd n ta 132 h wa Mo u Hamill Rd U S Hixso n Mcc a N Ely Rd d gs R tle 27 £ ¤ Norcress Rd Rd hill de Pa lis a 130 prin Oo n- U S Northgate Mall _ ! G re e Smit h ntow nR d Bro w row EB WR d. sD r Av Dr il S rt Ta Sho so rri Ha wa y i an d tt R Rd Rd Ap p mi sh Rid ge Gadd Rd la De Signal Mountain Blvd twa Wils o Ed wa rd s Rd . Pk tR d Adams n Au l d bR d Bl v so er es d An m Ja ville Rd ub Gr Po int Rd Time s nA v e. Av h- G eor get vie w Sh a Rd ow nR d Bl vd Da yto n eR d B ay Rd Rd ill or d son ut Ri dg o Sc M ck l ef ir N y Bo ¬ « ld Go C int Po Har ri tH wy 153 Rd Pk New Hixs on R d le y Va l Rd dl e ut M id C or ra l Sawyer Rd. Pk Sc o r we Lo Timesville Suck Cree k tre r he Ta f C ra b s ra Th 127 sR d tr ab Cr Rd s es Mo Bo y £ ¤ 58 ¬ « W Gann Rd nR d y-D all a Hw y Pk Da is al e Bo wm a r Pk Da yto n ye Saw Clark Rd 4 Rd Igou Ferry Rd ll R d 3 Sequoyah Access Lov e 2 S Rd 1 Pk n y mb Ha 0 0 Ho ltz cla w Av Le e U S er R d r al Pk gton Pk opp Wil lo Gra ssh Was hin D on t ld O t ay Ma rke tS Bro a Other Roadway Landmark HS TE St dS Big t S odd yC ree k 20T wS tS Bir c U S U S ST W Rd 20T H 139 ng dl i ST. W. ra Sp 11 SR-1 Bai le 20T H St N Sto rm WM Mc ca Will ow er R d Mayflower Rd Ch es U S Ga s lvd 137 Re tr 139 Ki n gB U S t St Ca rte St W Limited Access Roadway U S ST E U S 153 Existing CARTA Corridor _ 5TH Rd Creek Rock U S Transit- Premium Bus, Local Bus y. Pkw - 60 SR Ma in Transit- BRT ! ! 10TH ST W 12T H Funded and constructed by 2040 ! 153 d ! Transit- Premium Bus, Local Bus, and Shuttle Bus ! ! ! Funded and constructed by 2030 U S lvd Chestnut St Transit- Premium Bus, Local Bus Ki n gB d Turner R 6TH ST E 6TH ST W Gateway Av ³ Funded and constructed by 2020 ! 4TH ST E 4TH ST W ML sR d 141 Legend ³ 2ND ST W Blv Av N Funded Transit Projects Rd ont erfr Riv ox nob m m Ha Wi lc rd K Riverside Ave. nu Ma es tur fa c ai n St
  2. 2. D ld O on Le e Pk SR-1 11 Notes: t ay Pk Da yto n Pk 1. ID numbers correspond to project list tables included as Table 8.1 of the RTP document. Miles ³ yR d N ll R d Lov e Dallas Hollow Rd d ill R Bo wm ln Wa Rd ut 58 ¬ « Rd Sil v Ha rris o nB Rd ay ee Rd tr ab Cr Gann Rd W erd al e Da yto n Hw y Pk an s ra Th R d d eR C or ra l tre d sR ab Cr e Mos Pk R d. r he Sawyer Rd. dl e Va l le y Maha n Boy Sco u V U 58 Gap Rd t Rd int C ir N Gold Po w ck l ef Rd or d ut Rd Lower Mill Pk Fa irv ie Ri dg o Sc eR d y Bo w Ne n so Hix Rd tH wy M id ! Ta f d rry n U S 159 Dr do nA v Oo le nt R d P oi nda Wa co Park City Rd ns R d old R St Oolt ewa h- R ingg ie P kwy Deb b Ma in Little Edgmon Rd en Pa tt Rd dD r Jen kin s Wo odl an d old R Oolt ewa h- R ingg R d rG ap ife nd St a arre Univ e NG unb rsity Dr l Rd Bl vd ac e Pl n Rd Jen kin s Rd ks Ba n sH ill R d Mo rri SR-32 1 Cherokee Valley Rd a Gr vil ys le Rd sv Gray d ille R Valley R d Stat e Rou te 72 Cheroke e Un ite Dietz Rd 31 d as R Sta t Forr e eR ou dS tate sH igh wa y 41 U S 169 State Route 151 V U 100 41 £ ¤ te 2 V U 76 s Highw ay 27 N Jenki Br idg e Rd United S tate Ringgold Doltewah Rd on Dr sh Burning Bu 51 Rou t e1 d te R prings Rd Sta te Laf a ge R d Un ite d St at e s Hi gh wa y 27 Ham il Rd Long Hollow Rd Red Be lt 27 Rd Ba n Potts Rd ¬ « dy k Rd Post O a re Th 151 d Ri Bu rn i ng Bu s hR d elt R d d hR o tc eN vis Da Ave Lee Crittenden Ave Davis Ridge Rd l Ho llow Rd Ham ill H ollo ou M nt sg Pi wR d ah Rd 01 ts R d in e2 Poi n r Sp lar pu t Rou Fiv e e Stat § ¦ ¨ Rd gs y et Osburn R d 3 ! te Sta Highway 19 Po Poplar S Red B £ ¤ St 75 81 3 Rd a te Keith Rd f La _ t ye Evitt St Burning Bush Rd nt Dr y Bo d R National Military Park United States Highway 27 eR d Ri dg Rd d ion erd lv Koa B Mi ss rain ! 146 V U State Route 146 st R d Rd Hap p Dry Valley Rd Ha m ilto Rd 43 ge idge d ! Pine Grove Rd Dr rid d wa y Lee-Gordon Mill W 10Th St Rd ve Co pR 32 Mack Smith Rd w rB rR Wilde Cre str yR d ord ith Cross St ev ie de d Lytle R Rd Ga U S Rd U S V U V U y Va lley m Tho rE eD eR d NC onc U S 38 34 Rd ! Rd t Rd nR d ! High way 193 to w nR d Rd Re id Hic ko gold n xa Highway 813 Valley R d Vance Rd ! U S 36 La k Rd Dyer Rd ga Rid g Rd EB Rd d Hi gh au g lle Co e Al rR Gateway Ln ka m low ford 33 2 ¬ « Wi lde N Long Hollow Rd Chattano oga Pk ry V alle La ke Ho ga Lula ! Rd aR d kam Ch ic Rin g Sm e tt Re ed s on ns ck Sh al ! Steele Rd Post Rd h Jo Ni ck -A -Ja _ 60 Pin e U S NM ac k ns chm it WS Rd Lake 9 18 V U Igo u p te aug d eR NM oor d oor eR d SM ! Gre en S Crest Rd Gr ee ! ¬ « Ch ic d Rd V U Rd ! St a her dR d Sh ep Rd Ta lle y ir Av Belv o ! Ben n ! te ey Jer s Rd woo d Gre en Dr Mo ss t Mos sS ow nR dN ant red W Cloud Springs Rd 2 Rd ee Bill R m Ra U S Ly tl e 99 66 Ge rm ow nR dS U S 39 Pine Hill Dr 176 176 V U Exit Sce n 1 U S U S y Hw nR d Ho ga St ! ow nR d d sR os nR te Indian Ave ne 37 ! ! Flegal Ave Wilson Rd Bra i U S Lak es R d nR d Wils o ce Rd Rd ant ! ou eR Sp ru rG ap d tR Maple St e Le Ge rm Rd S 35 Cre st ST E low ford Chattanooga Airport rd Rd ant em v sA Do dd 38T H dife V U 6 on Fr Flee twoo d Dr Burnt Mill Rd Ochs H wy Ext Rd 163 U S W Gordon Ave nic U S SS ! AV 4TH AV 4TH Av ! Av 7 N r ino TE jo D le D r 170 h Jo ic H wS r 15 fo Shallow Ge rm U S Sta n _ 172 176 Ro u nP lvd el B lain ber Rd N St Kel ly Orc ha tS ry S Na va U S nR d Glentana St Tun n Av on NC ham sA Do dd St r al Ce nt Wo rkm a St Sha l Pk Rd 69 Dr Gle n v Cre st ! nob rd K St v Will o Av S cla w Ho ltz Hic ko Par k Alto n Av Ca in Tennessee Av St Elmo Av Hw y Och s Av Ce nt Blv d eA v sse ne Ten wy ic H cen Mtn S out Loo k Av NB ragg N Hermita ge Rd E Brow Rd ! rG ap Rd S Bragg Av yA Oa k dife Graysville Lula Lake ai n U S James St Nick-A Jack Rd Nick A Jack Ln wy eH Api son V U ! n Av E 63 ! enso T 37TH S V U V U ! Step h ST E ¬ « Rd Creek Spring ST W 153 ! Hw y EM 181 ST E Sta n Page Rd Sc e wS r al t Ma rke tS t dS Bro a Pk tch ie ! ha Bai le tS Av ! 23R DS 28T H U S State Route 2 Ol e dL rch Rd Wa u Av t Sta Red Riding Hood Trl Mill Rd wo od llie ! Mc ca v d City R Park e Do ds Av ok e yA HS TW 180 Salem Rd 11 £ ¤ Av v ar A t Bai le dS Bro a Sh ol Orc ha 163 Av Lee t Lightfoo 90 Ho yt e Westsid ! 299 V U 64 St N t St W U S ! a lvd Ro an ST E ST E Clio Av Blvd -11 US at W a ug New York Av Av N 3R D Ki n gB 10T H S lvd TE 11T HS TE 38T H V U 70 Old Lee Hwy 161 rd K 5TH W 38T H Hw y d e rs id Ri ve Av Barton ST E ML rS Ca rte 5TH lle Rossvi 40TH ST W Rd xB Will ow Ramp To I124 nd Rd Moccasin Be V U 68 St rd St ffo h Gi erg db Lin ST w Rd t Chu Prospec ! 33R D 75 § ¦ ¨ 61 V U Bonny Oaks Dr St U S nob ! ns F erry Ge org ia A v Lin dsa yS Ho t ust on Do St ugl as St Mable St s Rd Burge s Market S t Rd n ta in ou rM R !d ST .W . t el l Rd H Wilc o ! 20 T Ma in rS b mp Ca ort Airp HS TW n rfro wy. t Pk ! ! Bro w lvd nR d 153 SR- Ki n gB Chestnut St Gateway Av 4TH ST E ! El de e Riv ! 2ND ST W ML in Vie ! r Av ! 17 SR- Av Wild e t ss S Gla Dr vd Bl Rd m m Ha Fraz ie iso No ah Ro an o Do ds ke ico Av la H St k Ad d on om wy. Wis d nP riso Har Am n N Market St Pineville Rd e ke nuf Ma ure ac t ta Moun Lee U S U S Ln Enterprise South Ly n E a d sR 174 V U int Rd _ ! ro he C i de ers Riv e. Av 24 62 o Kings P nt Av Altamo ! d. sR § ¦ ¨ gs wy Webb Rd ter Lu llw a m e or 20T Cu mm in la H Av 12T Cumm ico Ha rris o Rd tain oun Am n d oint R k P Kings 183 wy ings H rR d 28 Dr ll Da U S Tyn e V U St ! h As 182 Clark Rd 184 ! rien R ! al M al Rd U S M cb ! Sig n ori Va ll N cce ss Rd ! Me m Pro ffitt Rd to St n Av er ey sort D r Lake R e Hic ko ry Lu p Rd d in R Cu lv er R d Pk Ha rri so n Pk Hixso n ! kw y t Eas to rt Ma Mounta in Dr Sims Tva A nt P fS Dup o ea EN ew be C reek R d. 3 Glo v eR d Ri dg Norcre n Ely L Av La m V U nl Rd G re e Rd Snow Hill ek ion Rd Rd Cr e re k p Cham o St Su c Hunter Rd Rd r n Ashland Te n Ga ar Mis si ssip N pi A v Pa lis a de Rid ge sD r wa y Av 156 Hamill Rd h wa U S 55 tle lvd Rd Oo n- Rd Ely s pring so rri Ha s Rd V U Bay Shore Rd Rd in B _ i tt County Boundary l na n ta Northgate Mall m sh Sig u Mo pring S t Tail Shor Big ss Rd Dr la De Study Area Morr ison S and ra Smit h Mcc a E i an Cas s hill Brow Rd ntow nR d in C n ta Mo u Rd Br ow Ap p Rd on WR d. t mp Ha ! Rd kR d ree Gadd Rd Rd ks Dr tR d Adams Pk. Timberlin State Line Au l twa Blv on Da yt nA v e. Wils o d Bl v Rd es n rso m Ja ¬ « b Rd 153 ub Gr oint eR d e And P rds svill h- G eor get v Tim e a Edw ow nR d Sh a ville A ! Time s Other Roadway y 11 hwa Hig Rd 77 27 £ ¤ Limited Access Roadway m Bir V U £ ¤ 127 Water Body ing S y mb Ha k Anderson Pk Pik Pk r ts M rP n e Rob e wy Sa Landmark m ha Birchwoo d ll R d Lov e Da is Rd ke y-D all a tl a yto Da Fiscally Constrained Roadway Projects te Rou sR d n Mo Add Bike Lane Existing Bike Lanes & 2014-2017 TIP Bike Lanes State Sequoyah Access Rd Igou Ferry Rd Existing Greenway _ Pk Pk n Da yt o St Funded and constructed by 2040 ! ¬ « n Add Bike Lane 319 a Be ! ! ! Funded and constructed by 2030 Rd Mo wb ra Add Bike Lane Po e Lovell Rd Funded and constructed by 2020 ! 3 gR d 2 2. Bike/ped projects not shown on the map include a set aside for sidewalk network improvements. tron 1 r Arm s 0 Tsati T e Hixson Pk Legend r Rd US-27 Funded Bike/Ped Projects te Hotw a te Rou 2
  3. 3. ma yT ho An d wR d d Turner R ley Shi p Funded and constructed by 2020 New Roadway Intersection Improvements,Preventative Maintenance, Safety Improvements,Widening Bridges Intersection Improvements Re tr k dP hw oo Bir c US27 yC ree k Pk Big Sod d Le e SR -6 ! Pk Tsati T e Da yto n r Rd r dR d gR d yP on Ar ms tro n Hixson Pk ! Do ll d w Rd ke Rd Love ll Rd a Me vie ow tl a Mo n N U n Pk 27 Pk n ! Lovell Rd Da yt o S Sequoyah Access Gann Rd R d ! son 26 Rd Fa ir twa Oo le Bay Shore Rd rR d Clark Rd ! Tyn e Rd ey Hic ko ry Enterprise South in Vie or e ! ie P kwy St Ma in ! dD r ! Dr ers i ty Un iv dla n Wo o ifer G ap R d Oolt ewa h-Rin gg EB Cherokee Valley Rd 151 Pine Grove Rd 11 National Military Park 10 75 § ¦ ¨ Burning Bush Thre e Notc h Rd _ # Dr pu Po lar g rin Sp le C n la ve d St Evitt St Burning Bush Rd n Boynto Sta t eR ou te 2 d sR on ns 51 e1 Rou t Sta te Potts Rd Rd Oa k 151 ¬ « Pos t hR d Bu s i ng Bu rn 01 Ha mil lH ollo Rd wR d M ou Cov e nt Rd Pi sg ah R d Crittenden Ave e2 Ave Lee 27 £ ¤ t Rou Davis Ridge Rd Red Be lt te Sta Highway 19 3 Osburn R d Rd gs Rd EL ong llo Ho 7 ay 2 ighw NH e Rd Long Hollo w Rd d wR Peav in yR aja ck Rd 2. Roadway projects not shown on the map include: pavement maintenance set aside, bridge maintenance set aside, arterial ITS signal upgrades and synchronization set aside, safety set aside. Ban d ck Ni 1. ID numbers correspond to project list tables included as Table 8.1 of the RTP document. d W Notes: Stewart Rd Rd # Ste wa rt 2 ¬ « elt R d Quarles Rd Keith Rd ! ! Dietz Rd Cheroke e Valley Rd Rou te State Rd 41 £ ¤ 48 Poplar Sprin Red B W es l ey an rain erd Rd SR-32 1 ! le U S Rd h Jo Lee-Gordon Mill Rd ¬ « sH ill R d ! NM ac k ! e 317 Mo rri ith Sm vil ys 76 U S Br idg 190 U S nR d old R d Rd ks Ba n d Jen kin s Rd 193 Stan d ! l Rd arre NG unb Deb b Little n to Pa tte yR d ry V alle Hic ko Rd ord NC onc Rd Vance , % ! Rd Rd rie n Mc b wn Rd ! Rd Re id No ah herd She p rt R d oor eR d SM United States Highway 27 Rd 8 2 Rd Crestr id ge Dr Airp o d eR NM oor ir A v Bel vo ! Rd s Highw ay 27 eR d Mi ss ion Ri dg Rd Dr yV al l ey United S tate N Jenkins 193 way Hig h Rd Chickamauga Rd ! Talley Rd N wn R d a n to to w nR d an Park City Rd mi t Sch W Rd Valle y oga ano Cha tt 189 41 te e y wa eR ou eg Pk E Dr h Hig Rd 31 Sta t ll Co 192 s ate ck U eR d !d Nic k-A -Ja State Route 146 U S d Forrest Rd as R Dyer Rd Rid g lv Koa B d wR d Pk el B Tun n sD r Mo s Ger m Rd N Cre st eD r ino l em SS Cres t Rd S Rd nR d Hog a tR d 18 9 Mcfarland Ave Lula Lake Rd ! te ! ¬ « Re ed s er ! ! , % St Ro u Dr 146 nt R d ed te w Post Rd Wi ld pR d dR Tal la it Un St a ev ie ! Ho llo Thom Ga ee lR Bil # p 100 d Lytle R yR Gateway Ln a Gr ! 43 U S U Highway 813 alle WV Nick-A Jack Rd NL ong 72 U S m Ra La k ! Rd ey lvd Av lain ber NC ham Do ds v sA Do dd Ge rm Steele Rd 47 U S ! Ly tl e Jer s v la Sh o Av Av ok e on Ro an Av N St N Will ow tS wS v sA Do dd Ho ga n Indian Ave Wilson Rd # 9 ! ¬ « State Route 2 Igo u 114 U S 1 2 Hamilton Place 113 Rd Page Rd nR d Wils o 7 Sta te Hw y Ro ut e5 te 11 _ low ford Ap iso n 99 Pin e it Ex u Ro James St gold Rd Cross St Av r al Ce nt Will o AV 4TH AV 4TH Ca in Av ar A v Par k Alto n sse e ne Ten St Elmo Av Och s Hw y NB r ag gA v E Brow Rd Tennessee Av n Av enso Step h ! nic rA Am n e rs id Ri ve nob rd K Orc ha tS St Av cla w Ho ltz ry S Kel ly Av r al Ce nt Hic ko Av Blv d Pk ie tch ha W au Sh ol Av Barton St Market St ! ! Bro a dS t say S Ho t ust on Ch Carte est nut r S t St Broad St nd Rd Moccasin Be Dr N Market St Market S t s Rd Burge s rry R d ns F e Bro w Lin d Pineville Rd Rd n ta in ou rM Eld e ! Sc e te m St a St ha ce La ke Sh al ! W X U S Rin g Rd y hwa Hig ing 11 £ ¤ Sp ru Park City Salem Rd m Bir e Pik Maple St ns Rd 66 U S 7! U S d tR Glentana St n ai Br ed er Rd y Hw Rd U S on Fr 299 Gr ee Rd rest WC W Gordon Ave e tt W X! U 4 U 6 ! ! te Rou Ben n low ford 60 e Le 188 Rd h Jo d sR os nR S Crest Rd State r Rd nR d Chattanooga Airport ! ! Wo rkm a jo D es ak Av Lee Westside Av HS TE _ 5 U 69 Graysville 38T ! TE 37TH S Na va nL Dr ood e tw ST E ! 38T H v St Rd U S Sha l 191 ! ST W yA Oa k rd Shallowfo 90 U S lvd ee Gr Fle 38T H ST E Blvd ville Ross g Av ! W 28T H Bai le xB , % ! TE Wi lco ! y Hw ! St 64 U S e ! 23R DS ai n Clio Av ug n aL S Brag ta Wa -11 US § ¦ ¨ 34 EM v ! s Rd 40TH ST W Rd U S SR -1 HS TE yA 63 Jenkin ! 62 24 Bai le Av U Le U !! ! gs St llie U S ¬ « Rd Creek Spring Cu mm in Mc ca 75 ! wy ings H 83 3R DS TE ST E Old Lee Hw y § ¦ ¨ 61 153 153 SR- 122 M 10T L Kin g HS T E Blvd WW XX 83 5TH t ! Cumm U S 20T 68 P t 70 t ! ss S Gla rS ld O U S Bonny Oaks Dr lS U S ST .W . ain U! nt Wild e Glenwood Dr 112 H WM ro erf Riv y. kw 17 SR- Rd el 4TH ST E y Av ewa Gat 20 T Av son pb m Ca Man d. res R Frazie ufactu r Add i Av ! wy. la H ico St n ! As h m o ds Do ! om 11 £ ¤ ! Wis d Hw y ! Rd ! as ! ll Da w Rd Lee ! ta Moun Rd Altamont Av _ on wy Edg m t Rd ! do nA v Ly n la H Kings Poin Av E ico 56 U S ! r 28 U S k Eas t ter y kw 57 Am n nP U S tP Rd d nR ta i lD 30 Rd un or ia ! rR d Glo ve Pk n Ha rri so Dr cce ss Rd U S Pro ffitt Rd n n po Du Mo M em ion Rd Va ll to on A v t Tva A 22 i on al Lu llw a Cass andr a Hixso n ! El y p Cham Hunter Rd N Rd Mar tin Pk ss Rd Ln Av ar La m kR d Cr ee in n ta Norc re hill Mcc a Pa lis a N Mo u Lu p , % Snow Hill Rd ! n Sig Dr Sims fS 29 Rd 3 ea U S p am Ch U nl Rd h wa Ashland Ter s ring tle Ely Rd Hamill Rd Ha rris o Rd de Rd U S il Sp Oo n- G re e Rd ntow nR d Bro w ! _ 55 ! ! Rd Smit h Wils o Po sD r WR d. Northgate Mall eR d ! Ed wa rd s row EB Dr Webb Rd ! Av i an Ri dg ! wa y Ap p rt Ta Sho so rri Ha Rid ge Gadd Rd Rd tR d Adams . Pk Signal Mountain Blvd ¬ « d bR n Au l 153 ub Gr so er es d Bl v d An m Ja ville Rd Big ! int Rd Time s nA v e. Av h- G eor get vie w Sh a Rd ow nR d Bl vd n Da yto , % ut or d ir N o Sc ck l ef B ay Rd U C int 24 Har ri Po ld Go y Bo eR d , % , % 25 58 Ri dg Hw y erd Sil v e Pk C or ra l tre New Hixs on R d le y Va l M id dl e Rd Rd ill Timesville Suck Cree k Dallas Hollow Rd al e Pk ! ut M Miles Pk Sawyer Rd. R d. Rd d sR r we Lo 5 tH wy Sc o ! 4 Ta f sR d ee £ ¤ 58 ¬ « r he Bo y 127 C ra b s ra Th County Boundary se Mo y-D all a ! Da yto n Da is nR d ! Bo wm a k tr ab Cr Study Area 77 W Tennessee-Georgia State Line y er P Saw U S 27 £ ¤ Rd Lov e y mb Ha Other Roadway Roberts Mill Rd Rd Igou Ferry Rd ll R d yto Da 0 78 U S ¬ « Limited Access Roadway 3 Pk 319 Landmark 2 on er R d Rd Intersection Improvement 1 D t ay opp ! Po e Water Body 0 Rd Rd te Hotw a New Roadway Intersection Improvements,Preventative Maintenance, Safety Improvements,Widening _ Mccallie Ferry ng dl i , % sR d Rd Gra ssh ld O Funded and constructed by 2040 ! he ay M ra Sp New Roadway Intersection Improvements,Preventative Maintenance, Safety Improvements,Widening ! oHu g 11 SR-1 Funded and constructed by 2030 ! eR d Mayflower Sto rm Interchange Modification ! Rid g Rd Ga s er R d ! # W X % Rd Creek Rock ! ! ! - 60 SR Ho llo Legend ! ³ sR d Funded Roadway Projects
  4. 4. Chattanoog ga‐Hamilton Cou unty/North Geo orgia 2040 Regio onal Transportation Plan  Table 8.1 Fiscally Constrained Project List C t State  Reven nue  Tier r  2040  RTP  ID  Lo ocal Funds  Percent  Local  Funding  F GA  2020  136  CA ARTA  RT TP  Te eam  US 27/S SR  2/Battle efield Parkway  Transit‐Local  Bus  GA portion of n new local bus serv vice  connecting For rt Oglethorpe, GA to  Downtown Cha attanooga via US 2 27.  TN/GA State  Line  Fort  Oglethorpe,  GA  4  $9,274,5 552.06  National l  Highway y  Performance  m  Program $7,419,641.65  80.00%  $0.00  0.00%  $1,854,910.41  $ 20.00%  GA  2020  100  City of Fort  Og glethorpe  all for  Ca Pr rojects  rive widening  Fant Dr and enh hancements  Safety  Improvements  City of Fort Ogl lethorpe proposes s to  widen 0.4‐mile e‐long Fant Drive in nto a  full three‐lane cross‐section, incl luding  center left‐turn lan ne.   provision of a c Also includes culvert work,  tions,  improvements at three intersect d sidewalks.  bike lanes, and SR‐146/C Cloud  Springs R Road  SR‐2/ Battlefie eld  Parkway y  0.4  $4,785,8 805.96  Surface  Transportation  Program m ‐ TPO  $3,828,644.77  80.00%  $0.00  0.00%  $957,161.19  20.00%  GA  2020  11  GD DOT  Ca all for  Pr rojects  CR‐385/ Keith Rd.  Bridge  Bridges  Replace CR‐385 5/Keith Rd. bridge e with  no added capacity.  Located at  L Little  ar Smith Chapel Rd d.  Tiger Creek nea CR‐385/Keith  Road at Little  eek  Tiger Cre      $2,331,0 045.62  Surface  Transportation  m ‐ State  Program $1,864,836.50  80.00%  $466,209.12  20.00%  $0.00  0.00%  GA  2020  8  GD DOT  Ca all for  Pr rojects  US‐41/ SR‐3 Bridge  Bridges  Bridge replacem ment on US‐41/SR R‐3  with added cap pacity (capacity  considered in p project #42).  Loca ated  at Peavine Cree ek near Haggard R Rd.,  east of Fort Og glethorpe.  at Peavin ne  Creek 3.7  miles East of  Fort  rpe  Oglethor      $4,495,4 401.95  Surface  Transportation  Program m ‐ State  $3,596,321.56  80.00%  $899,080.39  20.00%  $0.00  0.00%  GA  2020  10  GD DOT  Ca all for  Pr rojects  SR‐2 Bridge  US‐41/S Bridges  Replace US‐41/ /SR‐2 bridge with no  added capacity y.  Located at Sout th  Chickamauga C Creek in West Ring ggold  near SR‐151/Al labama Highway. h  At South Chickamauga  Creek in West  d  Ringgold      $5,827,6 614.06  Surface  Transportation  Program m ‐ State  $4,662,091.25  80.00%  $1,165,522.81  20.00%  $0.00  0.00%  GA  2020  9  GD DOT  Ca all for  Pr rojects  CR‐553/ Lakeview Dr.  Bridge  Bridges  Bridge rehabilit tation on CR‐ 553/Lakeview D Drive bridge with  added capacity y (capacity conside ered  in project #44).  Located at Black k  Branch, betwee en Steele Rd. and Page  Rd.  CR‐553/Lake  View Drive at  Black Bra anch  East of  Junction SR‐1       $1,248,8 867.46  Surface  Transportation  m ‐ State  Program $999,093.97  80.00%  $249,773.49  20.00%  $0.00  0.00%  GA  2020  205  Va arious  RT TP  Te eam  GA Pavement  Maintenance Set  2018‐2020  Aside 2 Preventative  Maintenance  Funding set asi ide for pavement  preventative m maintenance activities.          $11,511,9 956.00  National l  Highway y  Performance  m  Program $ $10,360,760.40  90.00%  $1,151,195.60  10.00%  $0.00  0.00%  GA  2020  206  Va arious  RT TP  Te eam  GA Pavement  Maintenance Set  2018‐2020  Aside 2 Preventative  Maintenance  Funding set asi ide for pavement  preventative m maintenance activities.          $15,000,0 000.00  Surface  Transportation  m ‐ State  Program $ $12,000,000.00  80.00%  $3,000,000.00  20.00%  $0.00  0.00%  GA  2020  185  Va arious  RT TP  Te eam  Sidewalk Network Set  Aside ‐ GA 2018‐2020  Complete  Streets‐ Bike/Ped  Funding set asi ide to implement  sidewalks on al ll federally classified  arterial roadwa ays within urban a areas  (recommendat tion from 2010  Bike/Ped Plan).          $1,956,5 522.00  Transportation  Alternatives  $1,565,217.60  80.00%  $0.00  0.00%  $391,304.40  20.00%  Project  Sponsor  Source  S Pro oject Name:  Category  Shor rt Description  From m:  To o:  Length  (miles) Georgia 2018‐20 020 Total:  GA  2030  76  Project Cost ( (YOE)  Federal Funding  Cate egory  Fed ederal Funds  Percent  Federal  Funding  $56,431,7 765.11  Ca atoosa  Co ounty  Ca all for  Pr rojects  Dietz Road  Widening  Widen from 2 t to 4 lanes  SR‐146/C Cloud  Springs R Road  Reeds Bridge  Road/Bo oynton  Drive  2.1     $ $46,296,607.69    $34,410,9 989.63  Surface  Transportation  m ‐ TPO  Program $ $27,528,791.70  80.00%  S State Funds  $6,931,781.42  $0.00  Percent  State  Funding    $3,203,376.00  $   0.00%  $6,882,197.93  $ 20.00%  S Section 8 – Inv vestment Priorities  145 
  5. 5. Chattanooga‐Hamilto on County/Nort th Georgia 2040 Regional Trans sportation Plan  State  Reven nue  Tier r  2040  RTP  ID  GA  2030  GA  Lo ocal Funds  Percent  Local  Funding  F 0.00%  $4,163,400.07  $ 20.00%  $4,921,735.71  10.00%  $0.00  0.00%  80.00%  $7,759,502.14  15.00%  $2,586,500.71  $ 5.00%  $ $28,393,383.92  90.00%  $3,154,820.44  10.00%  $0.00  0.00%  Surface  Transportation  m ‐ State  Program $4,052,952.80  80.00%  $1,013,238.20  20.00%  $0.00  0.00%  $35,000,0 000.00  Surface  Transportation  Program m ‐ State  $ $28,000,000.00  80.00%  $7,000,000.00  20.00%  $0.00  0.00%    $38,373,1 186.00  National l  Highway y  Performance  m  Program $ $34,535,867.40  90.00%  $3,837,318.60  10.00%  $0.00  0.00%       $2,533,0 096.00  National l  Highway y  Performance  m  Program $2,279,786.40  90.00%  $253,309.60  10.00%  $0.00  0.00%          $6,521,7 739.00  Transportation  Alternatives  $5,217,391.20  80.00%  $0.00  0.00%  $1,304,347.80  $ 20.00%  SR 193  US  yette  27/Lafay Rd.    $6,671,8 863.77  Congestion  on and  Mitigatio Air Quality  $5,337,491.01  80.00%  $1,334,372.75  20.00%  $0.00  0.00%  $2 237,678,897.50    $29,274,297.43    $1 14,936,446.51    $ $37,138,022.41  80.00%  $4,642,252.80  10.00%  $4,642,252.80  $ 10.00%  Source  S 72  City of Fort  glethorpe  Og Ca all for  Pr rojects  Mack Smith Road  Widening and  Enhanc cements  Safety  Improvements  Widen to a thre ee‐lane cross‐sect tion,  including a cen nter left‐turn lane.     Other improvements include  d elevating selecte ed  straitening and segments, cons structing a large  culvert, six inte ersection  improvements, , bicycle lanes and d wide  sidewalks.  SR‐146  US‐41/U US‐ 76/SR‐ 8/Ringgo old  Road  2.1  $20,817,0 000.36  Surface  Transportation  Program m ‐ TPO  $ $16,653,600.29  80.00%  $0.00  2030  139  GD DOT  RT TP  Te eam  press  I‐75 Exp Transit‐ Premium Bus  New Premium Bus express route e  connecting Ringgold, GA with  Downtown Cha  and  attanooga via I‐75  I‐24  Ringgold d (I‐ 75/SR‐15 51  Interchange)  Downtown  16.3  $49,217,3 357.09  National l  Highway y  Performance  m  Program $ $44,295,621.38  90.00%  GA  2030  43  GD DOT  Ca all for  Pr rojects  SR‐146/ /Cloud Spring  Road  Widening  Widen SR‐146/ /Cloud Spring Road d  US‐27/SR R‐1  East  CR‐ 553/Lakeview  Road  2.19  $51,730,0 014.25  Surface  Transportation  m ‐ State  Program $ $41,384,011.40  GA  2030  47  GD DOT  Ca all for  Pr rojects  I‐75  Widening  Widen I‐75 from m 6 lanes to 8 lane es.  SR‐146  Tennessee  State Lin ne  1.37  $31,548,2 204.35  National l  Highway y  Performance  m  Program GA  2030  202  Va arious  RT TP  Te eam  GA Brid dge  Maintenance Set  2021‐2030  Aside 2 Preventative  Maintenance  Funding set asi ide for bridge  preventative m maintenance activities.          $5,066,1 191.00  GA  2030  208  Va arious  RT TP  Te eam  GA Pavement  Maintenance Set  Aside 2 2021‐2030  Preventative  Maintenance  Funding set asi ide for pavement  preventative m maintenance activities.          GA  2030  207  Va arious  RT TP  Te eam  GA Pavement  Maintenance Set  Aside 2 2021‐2030  Preventative  Maintenance  Funding set asi ide for pavement  preventative m maintenance activities.        GA  2030  201  Va arious  RT TP  Te eam  dge  GA Brid Maintenance Set  2021‐2030  Aside 2 Preventative  Maintenance  Funding set asi ide for bridge  preventative m maintenance activities.     GA  2030  185  Va arious  RT TP  Te eam  Sidewalk Network Set  Aside ‐ GA 2021‐2030  Complete  Streets‐ Bike/Ped  Funding set asi ide to implement  sidewalks on al ll federally classified  arterial roadwa ays within urban a areas  (recommendat tion from 2010  Bike/Ped Plan).  GA  2030  176  Walker  W Co ounty  RT TP  Te eam  SR 2/Ba attlefield  Parkwa ay/McFarland  Ave./Ho ogan Rd.  Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2010 Bike/ /Ped  Plan Primary Network  Pro oject Name:  Category  Shor rt Description  From m:  To o:  Length  (miles) Georgia 2021‐20 030 Total:  GA  2040  137  $281,889,6 641.45  CA ARTA  Section 8 – In nvestment Pri iorities  146  Project Cost ( (YOE)  RT TP  Te eam  US‐41/Ringgold Road  Transit‐Local  Bus  New local bus s service connecting g East  Ridge, TN to Do owntown Chattanooga  via US 41.  Also o goes slightly into o  North GA.  wn  Downtow Cloud Sp pring  Rd. Park k and  Ride at I‐75  9.9  $46,422,5 528.01  Federal Funding  Cate egory  Percent  Federal  Funding  Project  Sponsor     Surface  Transportation  m ‐ State  Program Fed ederal Funds  S State Funds  Percent  State  Funding 
  6. 6. Chattanoog ga‐Hamilton Cou unty/North Geo orgia 2040 Regio onal Transportation Plan  State  Reven nue  Tier r  2040  RTP  ID  GA  2040  134  CA ARTA  GA  2040  135  GA  2040  GA  Project  Sponsor  Source  S Shor rt Description  Lo ocal Funds  Percent  Local  Funding  F 0.00%  $1,406,820.53  $ 20.00%  $377,469.19  1.75%  $3,936,464.39  $ 18.25%  80.00%  $0.00  0.00%  $3,183,300.06  $ 20.00%  $8,625,664.80  80.00%  $0.00  0.00%  $2,156,416.20  $ 20.00%  $ $94,663,234.85  90.00%  $ $10,518,137.21  10.00%  $0.00  0.00%  Surface  Transportation  m ‐ State  Program $8,821,422.40  80.00%  $2,205,355.60  20.00%  $0.00  0.00%  $5,513,3 389.00  National l  Highway y  Performance  Program m  $4,962,050.10  90.00%  $551,338.90  10.00%  $0.00  0.00%    $38,373,1 186.00  National l  Highway y  Performance  m  Program $ $34,535,867.40  90.00%  $3,837,318.60  10.00%  $0.00  0.00%       $75,000,0 000.00  Surface  Transportation  Program m ‐ State  $ $60,000,000.00  80.00%  $ $15,000,000.00  20.00%  $0.00  0.00%       $6,521,7 739.00  Transportation  Alternatives  $5,217,391.20  80.00%  $0.00  0.00%  $1,304,347.80  $ 20.00%  From m:  To o:  Length  (miles) Project Cost ( (YOE)  Federal Funding  Cate egory  Pro oject Name:  Category  RT TP  Te eam  Route 9 9 Extension  into N. GA  Transit‐Local  Bus  Extend CARTA Route 9 across sta ate  line down McFarland Ave. in GA to  Ellis Rd.  Rossville e  Blvd/TN‐ ‐GA  State Lin ne  McFarland  s Rd.  Ave/Ellis 1.5  $7,034,1 102.63  Surface  Transportation  Program m ‐ TPO  $5,627,282.11  80.00%  $0.00  CA ARTA  RT TP  Te eam  N. GA/E East  Ridge/A Airport  Transit‐Local  Bus  GA portion of n new local bus serv vice  through N. GA to Eastgate Town  Center and Airp port  TN/GA State  Line and Mack  Smith Rd d.  prings  Cloud Sp Rd./US 2 27  4.6  $21,569,6 667.89  Surface  Transportation  Program m ‐ TPO  $ $17,255,734.31  80.00%  169  Ca atoosa  Co ounty  RT TP  Te eam  US‐41/US‐76/SR‐ 2/SR‐3/ /Ringgold  Rd./Old d Dixie  Highwa ay/Nashville St.  Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2010 Bike/ /Ped  Plan Primary Network  TN/GA State  Line  Ooltewa ah‐ Ringgold d  Rd./Evitt t St.  7.9  $15,916,5 500.32  Surface  Transportation  Program m ‐ TPO  $ $12,733,200.25  2040  31  Ca atoosa  Co ounty  all for  Ca Pr rojects  Mineral Avenue  Access  Safety  Improvements  Widening and E Enhancing from Cl loud  Spring Road to Fort Town Drive. SR‐146/C Cloud  Springs R Road  wn  Fort Tow Drive  1.1  $10,782,0 081.00  Surface  Transportation  Program m ‐ TPO  GA  2040  48  GD DOT  Ca all for  Pr rojects  I‐75  Widening  Widen I‐75 from m 6 lanes to 8 lane es.  SR‐2  SR‐146 3.63  $105,181,3 372.05  GA  2040  204  Va arious  RT TP  Te eam  GA Brid dge  Maintenance Set  2031‐2040  Aside 2 Preventative  Maintenance  Funding set asi ide for bridge  preventative m maintenance activities.          $11,026,7 778.00  GA  2040  203  Va arious  RT TP  Te eam  GA Brid dge  Maintenance Set  2031‐2040  Aside 2 Preventative  Maintenance  Funding set asi ide for bridge  preventative m maintenance activities.          GA  2040  209  Va arious  RT TP  Te eam  GA Pavement  Maintenance Set  Aside 2 2031‐2040  Preventative  Maintenance  Funding set asi ide for pavement  preventative m maintenance activities.        GA  2040  210  Va arious  RT TP  Te eam  GA Pavement  Maintenance Set  2031‐2040  Aside 2 Preventative  Maintenance  Funding set asi ide for pavement  preventative m maintenance activities.     GA  2040  185  Va arious  RT TP  Te eam  Sidewalk Network Set  Aside ‐ GA 2031‐2040  Complete  Streets‐ Bike/Ped  Funding set asi ide to implement  ll federally classified  sidewalks on al arterial roadwa ays within urban a areas  (recommendat tion from 2010  Bike/Ped Plan).     National l  Highway y  Performance  m  Program Fed ederal Funds  Percent  Federal  Funding  S State Funds  Percent  State  Funding  Georgia 2031‐20 040 Total:  $343,341,3 343.89     $2 289,579,869.82    $37,131,872.29    $1 16,629,601.78    Georgia 2018‐20 040 Total:  $681,662,7 750.45     $5 573,555,375.01    $73,337,951.15    $3 34,769,424.29    TN  2020  14  CA ARTA  Ca all for  Pr rojects  CARTA bus and  incline car  replace ements and  additions 2018‐2020  Transit‐General  Vehicle replace ement, existing service          $16,956,5 522.00  Federal T Transit  Funding (5307,  5310, 53 337,  5339)  $ $11,021,739.30  65.00%  $3,391,304.40  20.00%  $2,543,478.30  $ 15.00%  TN  2020  15  CA ARTA  Ca all for  Pr rojects  CARTA Incline Railway  Improvements 2018‐ 2020  Transit‐General  Maintenance/e enhancements for r  existing system m          $1,956,5 522.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $1,271,739.30  65.00%  $391,304.40  20.00%  $293,478.30  15.00%  S Section 8 – Inv vestment Priorities  147 
  7. 7. Chattanooga‐Hamilto on County/Nort th Georgia 2040 Regional Trans sportation Plan  State  Reven nue  Tier r  2040  RTP  ID  TN  2020  16  TN  2020  TN  Project  Sponsor  From m:  To o:  Project Cost ( (YOE)  Fed ederal Funds  Percent  Federal  Funding  S State Funds  Percent  State  Funding  Lo ocal Funds  Percent  Local  Funding  F Pro oject Name:  CA ARTA  Ca all for  Pr rojects  CARTA bus shelter  needs 2 2018‐2020  Transit‐General  Maintenance/e enhancements for r bus  shelters          $553,0 004.89  Federal T Transit  Funding (5307,  5310, 53 337,  5339)  $359,453.18  65.00%  $0.00  0.00%  $193,551.71  35.00%  13  CA ARTA  Ca all for  Pr rojects  CARTA Intelligent  Transpo ortation  System  improvements 2018‐ 2020  Transit‐General  General techno ology maintenance e and  upgrade          $1,956,5 522.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $1,271,739.30  65.00%  $391,304.40  20.00%  $293,478.30  15.00%  2020  136  CA ARTA  RT TP  Te eam  US 27/S SR  2/Battle efield Parkway  Transit‐Local  Bus  TN portion of n new local bus service  connecting For rt Oglethorpe, GA to  Downtown Cha attanooga via US 2 27.  wn  Downtow Chattano ooga  TN/GA S State  Line  5  $11,593,1 189.75  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $1,159,318.97  10.00%  $3,477,956.92  30.00%  $6,955,913.85  $ 60.00%  TN  2020  19  CA ARTA  Ca all for  Pr rojects  CARTA Care a Van  Route increases  2018‐20 020  Transit‐General  No specific rou utes defined          $553,0 004.89  Federal T Transit  Funding (5307,  5310, 53 337,  5339)  $359,453.18  65.00%  $0.00  0.00%  $193,551.71  35.00%  TN  2020  20  CA ARTA  Ca all for  Pr rojects  CARTA Preventive  Maintenance 2018‐ 2020  Transit‐General  General mainte enance          $13,043,4 478.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $8,478,260.70  65.00%  $2,608,695.60  20.00%  $1,956,521.70  $ 15.00%  TN  2020  138  CA ARTA  RT TP  Te eam  Route 4 4/I‐75 Express  Ext & M Mod  Transit‐ Premium Bus  Extend CARTA Express Route 4  on I‐75 to Lee High hway  further north o Hamilton n  Place  Lee High hway  Interchange  park‐and d‐ride  1  $3,020,0 032.44  National l  Highway y  Performance  m  Program $2,718,029.20  90.00%  $151,001.62  5.00%  $151,001.62  5.00%  TN  2020  143  CA ARTA  RT TP  Te eam  CARTA Route  Frequency  Improvements 2018‐ 2020  Transit‐ Frequency  Improvements  Increase freque ency of CARTA rou utes 1  and 34  to cut h headways in half         $25,174,7 783.27  Federal T Transit  Funding (5307,  5310, 53 337,  5339)  $2,013,982.66  8.00%  $3,020,973.99  12.00%  $2 20,139,826.62  80.00%  TN  2020  186  CA ARTA/RPA  RT TP  Te eam  anooga Way"  "Chatta Feasibility Study  Study  A study to dete ermine the feasibility of  premium trans sit ‐ including light rail ‐  connecting Dow wntown Chattano ooga,  the Airport, and Enterprise South h.          $650,0 000.00  Surface  Transportation  Program m ‐ TPO  $520,000.00  80.00%  $65,000.00  10.00%  $65,000.00  10.00%  TN  2020  63  City of  hattanooga  Ch Ca all for  Pr rojects  Shallow wford Road  Widening  Widening from m 2 lanes to 4 lanes s with  complete stree ets (TIP ID#  SHLWFRDA2J).  Airport R Road  Jersey Pike  0.9  $22,984,4 473.13  Surface  Transportation  m ‐ TPO  Program $6,895,341.94  30.00%  $0.00  0.00%  $1 16,089,131.19  70.00%  TN  2020  58  City of  hattanooga  Ch Ca all for  Pr rojects  SR‐153  Widening  Widening from m a 4‐lane section t to a  6‐lane section f from the current 6 6‐ Lane section at t Stone Ridge.  Stone Ridge  US‐27  0.8  $12,992,2 236.25  National l  Highway y  Performance  m  Program $ $10,393,789.00  80.00%  $2,598,447.25  20.00%  $0.00  0.00%  TN  2020  60  City of  hattanooga  Ch Ca all for  Pr rojects  Goodw win Road  Extension  New Roadway  New 4‐lane fac cility (extension) fr rom  Gunbarrel Road d to Hamilton Plac ce  Blvd. (TIP ID# G GOODWIN)  Gunbarrel  Road  Hamilton  vd  Place Blv 0.5  $18,820,5 512.56  Surface  Transportation  m ‐ TPO  Program $9,410,256.28  50.00%  $3,764,102.51  20.00%  $5,646,153.77  $ 30.00%  TN  2020  98  City of  hattanooga  Ch Ca all for  Pr rojects  Central Avenue  Corrido or Study  Study  A corridor plan nning and feasibilit ty  study to determ mine the best  applicable use, , operational  improvements, ,  and feasibility of f  multimodal tra affic capacity for th he  corridor, south h of 3rd Street.          $436,1 163.68  Surface  Transportation  m ‐ TPO  Program $348,930.94  80.00%  $0.00  0.00%  $87,232.74  20.00%  148  Shor rt Description  Federal Funding  Cate egory  Source  S Section 8 – In nvestment Pri iorities  Category  Length  (miles)
  8. 8. Chattanoog ga‐Hamilton Cou unty/North Geo orgia 2040 Regio onal Transportation Plan  State  Reven nue  Tier r  2040  RTP  ID  TN  2020  161  City of  hattanooga  Ch RT TP  Te eam  SR 58/S Silverdale  Highwa ay/Bonny  Oaks/Campbell  ss St./Roanoke  St./Glas Ave./Orchard Knob  Ave.  Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2010 Bike/ /Ped  Plan Primary Network  McCallie e Ave.  Murray Hills  Rd.  5.8  $6,502,9 912.10  TN  2020  68  City of  hattanooga  Ch Ca all for  Pr rojects  3rd Stre eet/4th Street  Widening  Widening of 3r rd St/4th St from  Lindsay Street t et  to Hampton Stree from 2 lane  Lindsay S Street  Hampton  Street  1.2  $19,175,7 780.34  TN  2020  182  City of  hattanooga  Ch RT TP  Te eam  Browns s Ferry Rd.  Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2040 RTP G Gap  Analysis.  US 72/US 64/  US  41/Cumm mings  Highway y  Boydston Rd.    $4,834,6 682.22  TN  2020  193  City of  Co ollegedale  all for  Ca Pr rojects  sity  Univers Drive/S Standifer Gap  Road/O Old Camp Road  intersec ction  roundabout  Intersection  Improvements  Improve University Drive /Standi ifer  Gap Road /Old   Camp Road  intersection by y adding a roundab bout.          TN  2020  6  City of  ollegedale  Co Ca all for  Pr rojects  Tallant Road  Improvements  Preventative  Maintenance  Improve Tallan nt Road from Apiso on  Pike (SR‐317) to o city limits (McDo onald  Road) by addin ng lane width,  sidewalks, curb b and gutter, drain nage  and lighting.  SR‐317  McDona ald  Road  TN  2020  5  City of  Co ollegedale  all for  Ca Pr rojects  n Road  Edgmon Improvements  Preventative  Maintenance  Improve Edgmo on Road from Tallant  Road to Lee Hig ghway (US‐11/US‐ ‐ 64/SR‐2) by adding lane width,  b and gutter, drain nage  sidewalks, curb and lighting.  Tallant R Road  (04132) TN  2020  192  City of  ollegedale  Co Ca all for  Pr rojects  Tallant  Road/M McDonald Road  intersec ction  roundabout  Intersection  Improvements  Improve Tallan nt Road with McDo onald  Road intersecti ion by adding a  roundabout.  TN  2020  191  City of  Co ollegedale  all for  Ca Pr rojects  n Road/Lee  Edgmon Highwa ay  (US‐11/US‐ 64/SR‐2 2) intersection  signaliz zation  Intersection  Improvements  TN  2020  189  City of  ollegedale  Co Ca all for  Pr rojects  Univers sity Drive  improvements  TN  2020  188  City of  ollegedale  Co Ca all for  Pr rojects  Apison Pike (SR‐317)  phase 2 2 streetscape  Project  Sponsor  Source  S Pro oject Name:  Category  Shor rt Description  From m:  To o:  Length  (miles) Project Cost ( (YOE)  Federal Funding  Cate egory  Congestion  on and  Mitigatio Air Quality  Fed ederal Funds  Percent  Federal  Funding  S State Funds  Percent  State  Funding  Lo ocal Funds  Percent  Local  Funding  F $5,202,329.68  80.00%  $650,291.21  10.00%  $650,291.21  10.00%  $ $15,340,624.27  80.00%  $0.00  0.00%  $3,835,156.07  $ 20.00%  Congestion  on and  Mitigatio Air Quality  $3,867,745.77  80.00%  $0.00  0.00%  $966,936.44  20.00%  $250,0 000.00  Congestion  Mitigatio on and  Air Quality  $200,000.00  80.00%  $0.00  0.00%  $50,000.00  20.00%  2.1  $4,297,4 458.41  Surface  Transportation  m ‐ TPO  Program $3,437,966.73  80.00%  $0.00  0.00%  $859,491.68  20.00%  US‐11‐64 4 (Lee  Highway y)  1.6  $3,255,6 650.31  Surface  Transportation  Program m ‐ TPO  $2,604,520.25  80.00%  $0.00  0.00%  $651,130.06  20.00%          $250,0 000.00  Congestion  on and  Mitigatio Air Quality  $200,000.00  80.00%  $0.00  0.00%  $50,000.00  20.00%  Improve Edgmo on Road with Lee  Highway (US‐11/US‐64/SR‐2)  y adding traffic sign nal.  intersection by         $200,0 000.00  Surface  Transportation  Program m ‐ State  $160,000.00  80.00%  $0.00  0.00%  $40,000.00  20.00%  Safety  Improvements  Adding width, c curb and gutters a and  resurfacing University Drive from m  east to Old Camp  College Drive e Road/Standifer r Gap Road.  College D Drive  East  Old  tandif Camp/St er Gap R Road  1.5  $1,300,0 000.00  Surface  Transportation  m ‐ TPO  Program $1,040,000.00  80.00%  $0.00  0.00%  $260,000.00  20.00%  Safety  Improvements  A portion of the Apison Pike (SR‐ ‐317)  Improvements pro oject  phase 2 TDOT I is in the City of f Collegedale.  The e city  has a policy of improving its majo or  with landscaping an nd  access roads w lighting.  own  Pattento Road (City  Limits)  Ooltewa ah‐ Ringgold d Road  (SR 321) and  end of phase  2 project.  2  $900,0 000.00  Surface  Transportation  m ‐ State  Program $720,000.00  80.00%  $0.00  0.00%  $180,000.00  20.00%  National l  Highway y  Performance  Program m  S Section 8 – Inv vestment Priorities  149 
  9. 9. Chattanooga‐Hamilto on County/Nort th Georgia 2040 Regional Trans sportation Plan  State  Reven nue  Tier r  2040  RTP  ID  TN  2020  TN  Project  Sponsor  Source  S Pro oject Name:  38  City of East  Ridge  Ca all for  Pr rojects  Camp Jordan Parkway  Bike Lane  2020  39  City of East  Ridge  Ca all for  Pr rojects  TN  2020  28  Ha amilton  Co ounty  TN  2020  27  TN  2020  TN  TN  150  To o:  Project Cost ( (YOE)  Federal Funding  Cate egory  Fed ederal Funds  Percent  Federal  Funding  S State Funds  Percent  State  Funding  Lo ocal Funds  Percent  Local  Funding  F Shor rt Description  From m:  Complete  Streets‐ Bike/Ped  This project will continue the already  ke lanes on Camp  established bik y to Ringgold Road Jordan Parkway d (US‐ 41), which will connect to a diffe erent  040 Plan (Bike Lan ne on  phase of the 20 Ringgold Road from Mack Smith Road  n Parkway).  to Camp Jordan p  On Camp Jordan  Parkway from  East Ridg ge Fire  Station # #2 to  Ringgold d Road  (US‐41). This  will conn nect  the Camp  multi‐ Jordan m use path h,  connecting to  South  Chickamauga  Greenwa ay in  Chattano ooga  on the North  end of th he  park to the  path along  d Road  Ringgold and its     0.25  $186,2 211.04  Transportation  Alternatives  $148,968.83  80.00%  $0.00  0.00%  $37,242.21  20.00%  US‐41/US‐76/SR‐ 8/Ringg gold Rd. Bike  Lane/Si idewalks  Complete  Streets‐ Bike/Ped  This project will continue the already  ke lanes on US‐ established bik 41/Ringgold Rd d. It will provide th he  addition of side ewalks, where  required, and c coincide with the  current project t of ADA accessible e  sidewalk inters sections along this s  section.  Tombras s  Avenue Greensla ake  Road  0.856  $984,6 683.71  Transportation  Alternatives  $787,746.97  80.00%  $98,468.37  10.00%  $98,468.37  10.00%  Ca all for  Pr rojects  Ooltew wah‐ George etown Road  Safety  Improvements  Addition of sho oulder width and left  turn lanes from m US‐11/64 Lee  Highway to Mo ountain View Road d.  There will be no additional trave el  dditional capacity.  lanes and no ad 4 Lee  US‐11/64 Highway y  Mountain  View Road  2.5  $6,035,0 040.50  Highway y Safety  Improve ement  Program m  $5,431,536.45  90.00%  $0.00  0.00%  $603,504.05  10.00%  Ha amilton  Co ounty  Ca all for  Pr rojects  SR‐58 M Miscellaneous  Intersection  improvements:  turn  lanes at t eight  intersec ction  Intersection  Improvements  Installation of t turn lanes at eight t  intersections o on SR‐58 between  Monger Lane a and Grasshopper R Rd.  Monger Lane  Grasshopper  Rd.    $2,478,8 835.40  National l  Highway y  Performance  m  Program $1,983,068.32  80.00%  $247,883.54  10.00%  $247,883.54  10.00%  26  Ha amilton  Co ounty  Ca all for  Pr rojects  SR‐58 a at Greenwood  Road/B Bramlett Road  Intersection  Improvements  Installation of t traffic signal on SR R‐58  N/A       $942,4 438.93  National l  Highway y  Performance  m  Program $753,951.14  80.00%  $94,243.89  10.00%  $94,243.89  10.00%  2020  25  Ha amilton  Co ounty  Ca all for  Pr rojects  SR‐58 a at Career Lane  Intersection  Improvements  Installation of t traffic signal on SR R‐58  at Career Lane intersection  N/A       $942,4 438.93  National l  Highway y  Performance  m  Program $753,951.14  80.00%  $94,243.89  10.00%  $94,243.89  10.00%  2020  24  Ha amilton  Co ounty  all for  Ca Pr rojects  at SR‐312  SR‐58 a (Mahan n Gap Road)  Intersection  Improvements  Traffic signal in nstallation on SR‐5 58 at  SR‐312  N/A       $942,4 438.93  National l  Highway y  Performance  m  Program $753,951.14  80.00%  $94,243.89  10.00%  $94,243.89  10.00%  Section 8 – In nvestment Pri iorities  Category  Length  (miles)
  10. 10. Chattanoog ga‐Hamilton Cou unty/North Geo orgia 2040 Regio onal Transportation Plan  State  Reven nue  Tier r  2040  RTP  ID  TN  2020  185  St taff  Identified /  Pe ending  TP  RT Te eam  Sidewalk Network Set  Aside ‐ TN 2018‐2020  Complete  Streets‐ Bike/Ped  Funding set asi ide to implement  sidewalks on al ll federally classified  arterial roadwa ays within urban a areas  (recommendat tion from 2010  Bike/Ped Plan).          $20,000,0 000.00  Transportation  Alternatives  TN  2020  83  TD DOT  Ca all for  Pr rojects  I‐24 at Market &  Broad S Streets  Interchange  cation  Modific Interchange  Modification  Modify Market t Street and Broad d  Street I‐24 inte erchanges to impro ove  safety and operation characteris stics          $10,089,4 440.04  National l  Highway y  Performance  m  Program TN  2020  3  TD DOT  Ca all for  Pr rojects  US‐127/SR‐ 8/Signal  Mounta ain Blvd  Preventative  Maintenance  Preventative m maintenance to select  areas including g culvert repair, cu ulvert  modification, rock fall mitigation n,  undercut roadw way repairs, and  roadway stability repairs.  Suck Creek  Road  Palisades  Drive  L.M.  o L.M.  13.96 to 17.01   Hamilton  3.05  $13,283,0 053.27  TN  2020  4  TD DOT  Ca all for  Pr rojects  I‐75 at Hamilton Place  Mall Int terchange  Interchange  Modification  Add ramps to m make this intercha ange  fully directiona al          TN  2020  84  TD DOT  Ca all for  Pr rojects  I‐75  Interchange  Modification  Modification of the interchange of I‐ 75 and I‐24  Interstat te 75  at Interstate  24 in  ooga  Chattano    0  TN  2020  187  TD DOT/RPA  RT TP  Te eam  SR 153 Rapid Transit  Line Feasibility Study  Study  A study to dete ermine the feasibility of  premium trans sit ‐ including bus r rapid  transit (BRT) ‐ i in the SR‐153/US‐2 27  corridor from S Soddy‐Daisy to  Northgate Mall to Airport to Ham milton  Place.          $500,0 000.00  TN  2020  223  Va arious  RT TP  Te eam  Arterial ITS Signal  Upgrad des and  Synchro onization‐ Set  Aside 2 2018‐2020  ITS  Funding set asi ide for ITS signal  upgrades and s synchronization          TN  2020  218  Va arious  RT TP  Te eam  TN Pave ement  Maintenance Set  2018‐2020  Aside 2 Preventative  Maintenance  Funding set asi ide for pavement  preventative m maintenance activities.        TN  2020  217  Va arious  RT TP  Te eam  TN Pave ement  Maintenance Set  2018‐2020  Aside 2 Preventative  Maintenance  Funding set asi ide for pavement  preventative m maintenance activities.     TN  2020  212  Va arious  RT TP  Te eam  TN Brid dge  Maintenance Set  Aside 2 2018‐2020  Preventative  Maintenance  Funding set asi ide for bridge  preventative m maintenance activities.  TN  2020  211  Va arious  RT TP  Te eam  TN Brid dge  Maintenance Set  Aside 2 2018‐2020  Preventative  Maintenance  Funding set asi ide for bridge  preventative m maintenance activities.  Project  Sponsor  Source  S Pro oject Name:  Category  Shor rt Description  From m:  To o:  Length  (miles) Project Cost ( (YOE)  Federal Funding  Cate egory  Fed ederal Funds  Percent  Federal  Funding  S State Funds  Percent  State  Funding  Lo ocal Funds  Percent  Local  Funding  F $200,000.00  1.00%  $0.00  0.00%  $1 19,800,000.00  99.00%  $9,080,496.03  90.00%  $1,008,944.00  10.00%  $0.00  0.00%  Surface  Transportation  m ‐ State  Program $ $10,626,442.62  80.00%  $2,656,610.65  20.00%  $0.00  0.00%  $48,093,3 364.49  National l  Highway y  Performance  m  Program $ $43,284,028.05  90.00%  $4,809,336.45  10.00%  $0.00  0.00%  $26,743,1 162.76  National l  Highway y  Performance  m  Program $ $24,068,846.48  90.00%  $2,674,316.28  10.00%  $0.00  0.00%  Surface  Transportation  m ‐ TPO  Program $400,000.00  80.00%  $50,000.00  10.00%  $50,000.00  10.00%  $5,000,0 000.00  Surface  Transportation  m ‐ State  Program $4,000,000.00  80.00%  $1,000,000.00  20.00%  $0.00  0.00%    $58,853,4 497.00  Surface  Transportation  m ‐ State  Program $ $29,426,748.50  50.00%  $5,885,349.70  10.00%  $2 23,541,398.80  40.00%       $58,853,4 497.00  National l  Highway y  Performance  Program m  $ $47,082,797.60  80.00%  $5,885,349.70  10.00%  $5,885,349.70  $ 10.00%          $12,518,9 975.00  Surface  Transportation  Program m ‐ State  $ $10,015,180.00  80.00%  $1,251,897.50  10.00%  $1,251,897.50  $ 10.00%          $12,518,9 975.00  National l  Highway y  Performance  m  Program $ $10,015,180.00  80.00%  $1,251,897.50  10.00%  $1,251,897.50  $ 10.00%  S Section 8 – Inv vestment Priorities  151 
  11. 11. Chattanooga‐Hamilto on County/Nort th Georgia 2040 Regional Trans sportation Plan  State  Reven nue  Tier r  2040  RTP  ID  TN  2020  224  Va arious  RT TP  Te eam  TN Safe ety Set Aside  2018‐20 020  Safety  Improvements  Funding set asi ide for targeted sa afety  improvements as they are identi ified  in the future to o address safety  emphasis areas s of roadway  departure, aggressive driving, an nd  intersections.          $1,800,0 000.00  Surface  Transportation  Program m ‐ TPO  $1,440,000.00  80.00%  $0.00  0.00%  $360,000.00  20.00%  TN  2020  226  Va arious  RT TP  Te eam  TN Safe ety Set Aside  2018‐20 020  Safety  Improvements  Funding set asi ide for targeted sa afety  improvements as they are identi ified  o address safety  in the future to emphasis areas s of roadway  departure, aggressive driving, an nd  intersections.          $3,500,0 000.00  National l  Highway y  Performance  Program m  $2,800,000.00  80.00%  $350,000.00  10.00%  $350,000.00  10.00%  TN  2020  228  Va arious  RT TP  Te eam  TN Tran nsit Set Aside  2018‐20 020  Transit‐Local  Bus  Funding set asi ide for set aside fo or  additional transit  cts as they are  capacity projec identified in the future.          $5,000,0 000.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $250,000.00  5.00%  $1,500,000.00  30.00%  $3,250,000.00  $ 65.00%  TN  2020  225  Va arious  RT TP  Te eam  TN Safe ety Set Aside  2018‐20 020  Safety  Improvements  Funding set asi ide for targeted sa afety  improvements as they are identi ified  o address safety  in the future to emphasis areas s of roadway  departure, aggressive driving, an nd  intersections.          $4,900,0 000.00  Surface  Transportation  m ‐ State  Program $3,920,000.00  80.00%  $490,000.00  10.00%  $490,000.00  10.00%  Project  Sponsor  Source  S Pro oject Name:  Category  Shor rt Description  From m:  To o:  Length  (miles) Tennessee 2018 8‐2020 Total:  Project Cost ( (YOE)  $465,822,9 980.23  Federal Funding  Cate egory     Fed ederal Funds  $2 296,218,113.93  Percent  Federal  Funding  S State Funds  Percent  State  Funding    $49,953,167.68    Lo ocal Funds  $11 19,651,698.62  Percent  Local  Funding  F   TN  2030  15  CA ARTA  Ca all for  Pr rojects  CARTA Incline Railway  Improvements 2021‐ 2030  Transit‐General  Maintenance/e enhancements for r  existing system m          $6,521,7 739.00  Federal T Transit  Funding (5307,  5310, 53 337,  5339)  $4,565,217.30  70.00%  $1,304,347.80  20.00%  $652,173.90  10.00%  TN  2030  143  CA ARTA  RT TP  Te eam  CARTA Route  Frequency  Improvements 2021‐ 2030  Transit‐ Frequency  Improvements  Increase freque ency of CARTA rou utes 4  and 10  to cut h headways in half         $83,915,9 940.84  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $6,713,275.27  8.00%  $ $10,069,912.90  12.00%  $6 67,132,752.67  80.00%  TN  2030  132  CA ARTA  RT TP  Te eam  Route 2 28 Extension  Transit‐Local  Bus  Extend CARTA route 28 to provid de  en Chattanooga  service betwee Community Co ollege and Northga ate  Mall  Chatt  nity  Commun College Northgate  Mall BRT T  Station 3.7  $11,172,5 570.33  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $1,117,257.03  10.00%  $0.00  0.00%  $1 10,055,313.30  90.00%  TN  2030  141  CA ARTA  RT TP  Te eam  Downto own Shuttle  East/W West Route  Transit‐ Circulator  Shuttle  New shuttle ro oute downtown  between Aquarium area and Erla anger  Hospital; exten nd further east if LRT  line built at Hotzclaw  3rd and  Hotzclaw w  Shuttle P Park  North (3 3rd  and Broa ad)  5.2  $15,700,8 833.22  Federal T Transit  Funding (5307,  5310, 53 337,  5339)  $1,570,083.32  10.00%  $0.00  0.00%  $1 14,130,749.90  90.00%  TN  2030  14  CA ARTA  Ca all for  Pr rojects  CARTA bus and  incline car  ements and  replace additions 2021‐2030  Transit‐General  Vehicle replace ement, existing service          $56,521,7 739.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $ $39,565,217.30  70.00%  $ $11,304,347.80  20.00%  $5,652,173.90  $ 10.00%  TN  2030  130  CA ARTA  RT TP  Te eam  Route 2 2 extension  Transit‐Local  Bus  Extend CARTA route 2 to provide e bus  h Red Bank connecting  service through to Northgate M Mall  Market/Sawye r  Northgate  T  Mall BRT Station 6.4  $19,325,1 109.91  Surface  Transportation  m ‐ TPO  Program $ $15,460,087.93  80.00%  $0.00  0.00%  $3,865,021.98  $ 20.00%  Section 8 – In nvestment Pri iorities  152 
  12. 12. Chattanoog ga‐Hamilton Cou unty/North Geo orgia 2040 Regio onal Transportation Plan  State  Reven nue  Tier r  2040  RTP  ID  TN  2030  16  TN  2030  TN  Project  Sponsor  Category  Shor rt Description  From m:  To o:  Length  (miles) Project Cost ( (YOE)  Federal Funding  Cate egory  Fed ederal Funds  Percent  Federal  Funding  S State Funds  Percent  State  Funding  Lo ocal Funds  Percent  Local  Funding  F Source  S Pro oject Name:  CA ARTA  Ca all for  Pr rojects  CARTA bus shelter  needs 2 2021‐2030  Transit‐General  Maintenance/e enhancements for r bus  shelters          $1,843,3 350.19  Federal T Transit  Funding (5307,  5310, 53 337,  5339)  $1,290,345.14  70.00%  $0.00  0.00%  $553,005.06  30.00%  20  CA ARTA  Ca all for  Pr rojects  CARTA Preventive  Maintenance 2021‐ 2030  Transit‐General  General mainte enance          $43,478,2 261.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $ $30,434,782.70  70.00%  $8,695,652.20  20.00%  $4,347,826.10  $ 10.00%  2030  13  CA ARTA  Ca all for  Pr rojects  CARTA Intelligent  Transpo ortation  System  improvements 2021‐ 2030  Transit‐General  General techno ology maintenance e and  upgrade          $6,521,7 739.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $4,565,217.30  70.00%  $1,304,347.80  20.00%  $652,173.90  10.00%  TN  2030  21  CA ARTA  Ca all for  Pr rojects  Regiona al transit call  center / / mobility  manage ement  Transit‐General  The Regional tr ransit call center w will  serve as a one call location for  transportation for the region.  Mobility manag gement services w will  support the cal ll center and  coordination of services with transit  partners in the e region.          $6,000,0 000.00  Federal T Transit  Funding (5307,  5310, 53 337,  5339)  $2,400,000.00  40.00%  $1,200,000.00  20.00%  $2,400,000.00  $ 40.00%  TN  2030  19  CA ARTA  Ca all for  Pr rojects  CARTA Care a Van  Route increases  2021‐20 030  Transit‐General  No specific rou utes defined          $1,843,3 350.19  Federal T Transit  Funding (5307,  5310, 53 337,  5339)  $1,290,345.14  70.00%  $0.00  0.00%  $553,005.06  30.00%  TN  2030  142  CA ARTA  RT TP  Te eam  on Place  Hamilto Circulat tor  Transit‐ Circulator  Shuttle  New shuttle ro oute in the Hamilto on  Place Mall area a; follows circular route  from mall going g down Gunbarrel l, E.  Brainerd, etc.  Future  Hamilton n  Place Ma all  BRT Station  Circular Route  (see notes)  1  $3,020,0 032.44  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $302,003.24  10.00%  $0.00  0.00%  $2,718,029.20  $ 90.00%  TN  2030  12  CA ARTA  Ca all for  Pr rojects  CARTA transfer  center  Transit‐General  A centrally loca ated CARTA transf fer  center in down ntown Chattanoog ga  that would serv ve that would serv ve as  a centralized tr ransfer point          $11,793,2 277.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $1,179,327.70  10.00%  $2,358,655.40  20.00%  $8,255,293.90  $ 70.00%  TN  2030  183  City of  hattanooga  Ch RT TP  Te eam  Barton Ave/Hixson  Pike  Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2040 RTP G Gap  Analysis.  Veterans s  Bridge  Fernway y Rd.    $2,981,7 714.41  Congestion  on and  Mitigatio Air Quality  $2,385,371.53  80.00%  $0.00  0.00%  $596,342.88  20.00%  TN  2030  181  City of  hattanooga  Ch RT TP  Te eam  4th Ave e./S Kelly St.  Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2040 RTP G Gap  Analysis.  Cilio Ave e.  US  1/SR  76/US41 17/SR 8/ / E.  Main St.    $2,839,8 827.42  Congestion  on and  Mitigatio Air Quality  $2,271,861.94  80.00%  $0.00  0.00%  $567,965.48  20.00%  TN  2030  180  City of  Ch hattanooga  TP  RT Te eam  d St./E 28th St.  W. 33rd Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2040 RTP G Gap  Analysis.  Broad St.  US  41/Ringg gold  Rd.    $4,329,8 836.69  Congestion  Mitigatio on and  Air Quality  $3,463,869.35  80.00%  $0.00  0.00%  $865,967.34  20.00%  TN  2030  172  City of  Ch hattanooga  TP  RT Te eam  SR‐1/Rossville  US‐27/S Blvd./La afayette  Rd./20t th/23rd  Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2010 Bike/ /Ped  Plan Primary Network  Broad St.  Battlefie eld  Pkwy.    $9,937,3 352.16  Congestion  Mitigatio on and  Air Quality  $7,949,881.72  80.00%  $0.00  0.00%  $1,987,470.43  $ 20.00%  TN  2030  159  City of  Ch hattanooga  TP  RT Te eam  /Hixson  SR‐319/ Pike/Market St.  Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2010 Bike/ /Ped  Plan Primary Network  2nd Street  Middle V Valley  Road    $13,202,8 840.54  Surface  Transportation  Program m ‐ State  $ $10,562,272.44  80.00%  $1,320,284.05  10.00%  $1,320,284.05  $ 10.00%  S Section 8 – Inv vestment Priorities  153 
  13. 13. Chattanooga‐Hamilto on County/Nort th Georgia 2040 Regional Trans sportation Plan  State  Reven nue  Tier r  2040  RTP  ID  TN  2030  TN  Percent  Local  Funding  F Pro oject Name:  70  City of  hattanooga  Ch Ca all for  Pr rojects  SR317/ /Bonny Oaks  Drive ‐ PE, ROW  Widening  Widen from 2 t to 4 lanes (already y four  lanes either dir rection of listed te ermini  specifically from m Silverdale Road east  to I‐75 and from m Preservation Dr rive  west to SR‐17)  Preserva ation  Drive  Silverdale  Road  5.1  $10,824,5 599.20  Surface  Transportation  Program m ‐ State  $8,659,679.36  80.00%  $2,164,919.84  20.00%  $0.00  0.00%  2030  90  City of  Ch hattanooga  035  20 RT TP  wford Road  Shallow Widening  Widen from 2 t to 4 lanes from Air rport  Road to west o of SR‐153 at Palme er  Road or TDOT Bridge Replaceme ent  wford Road over SR‐ Project Shallow 153‐4 lanes  Road  Airport R North M Moore  Road  0.6  $12,839,2 228.60  Surface  Transportation  Program m ‐ TPO  $ $10,271,382.88  80.00%  $0.00  0.00%  $2,567,845.72  $ 20.00%  TN  2030  56  City of  hattanooga  Ch Ca all for  Pr rojects  SR‐153 from SR‐ 319/Hix xson Pike to  SR‐17/S SR‐58  Widening  Widening from m 4‐lanes to 6‐lanes  from SR‐317 to o SR‐17/SR‐58  SR‐317 H Hixson  Pike to  SR‐17/ S SR‐58,  5.9  $83,459,2 290.49  National l  Highway y  Performance  Program m  $ $66,767,432.39  80.00%  $ $16,691,858.10  20.00%  $0.00  0.00%  TN  2030  55  City of  hattanooga  Ch Ca all for  Pr rojects  Dupont t Parkway (SR‐ 319) Ex xtension  New Roadway  New two lane f facility from SR‐15 53 to  Hixson Pike  SR‐153  SR‐319/Hixson  Pike  1.2  $7,605,3 384.33  National l  Highway y  Performance  m  Program $6,084,307.47  80.00%  $760,538.43  10.00%  $760,538.43  10.00%  TN  2030  64  City of  Ch hattanooga  all for  Ca Pr rojects  Wilcox Boulevard  Tunnel Improvements  Widening  To provide add ditional lanes of tra affic  on Wilcox Blvd from N. Chamber rlain  enwood Road, bas sed  Avenue to Gree on an additiona al tube thru Missio onary  Ridge.  North  Chamberlain  Avenue ood  Greenwo Road  0.85  $59,164,5 551.90  Surface  Transportation  Program m ‐ TPO  $ $47,331,641.52  80.00%  $0.00  0.00%  $1 11,832,910.38  20.00%  TN  2030  66  City of  hattanooga  Ch Ca all for  Pr rojects  Jenkins s Road  Widening  Widening from m 2 lanes to 4 lanes s,  from Standifer Gap Road. To  Shallowford Ro oad  Standifer Gap  Road  Shallowf ford  Road  0.8  $13,526,6 608.25  Surface  Transportation  Program m ‐ TPO  $ $10,821,286.60  80.00%  $0.00  0.00%  $2,705,321.65  $ 20.00%  TN  2030  174  City of  hattanooga  Ch RT TP  Te eam  SR‐17/B Broad St./St.  Elmo Av ve.  Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2010 Bike/ /Ped  Plan Primary Network  2nd St.  TN/GA S State  Line    $7,381,9 994.59  Congestion  on and  Mitigatio Air Quality  $5,905,595.67  80.00%  $0.00  0.00%  $1,476,398.92  $ 20.00%  TN  2030  190  City of  ollegedale  Co Ca all for  Pr rojects  Prospec ct Church Road  improvements  Safety  Improvements  Improve Prospect Church Road f from  University Drive to city limits by  adding lane wid dth, sidewalks, curb  and gutter, dra ainage and lighting g.    Hamilton Coun nty to extend  Improvements from city limits to o East  Brainerd Road. .  ty  Universit Drive  East Brainerd  Road  1.5  $3,500,0 000.00  Surface  Transportation  Program m ‐ TPO  $2,800,000.00  80.00%  $0.00  0.00%  $700,000.00  20.00%  TN  2030  35  City of East  Ridge  Ca all for  Pr rojects  US‐41/US‐76/SR‐ 8/Ringg gold Road Bike  Lane  Complete  Streets‐ Bike/Ped  This project will connect to #39 t to  e lane and sidewal lks to  allow for a bike connect all of R Ringgold Road (US S‐41)  in East Ridge as s well as to bus tra ansit  in Chattanooga a.  Greensla ake  Road  South  Seminole  Drive.  0.905  $874,3 316.77  Transportation  Alternatives  $699,453.42  80.00%  $87,431.68  10.00%  $87,431.68  10.00%  TN  2030  32  City of East  Ridge  Ca all for  Pr rojects  US‐41/US‐76/SR‐ 8/Ringg gold Road Bike  Lane  Complete  Streets‐ Bike/Ped  This project will connect bike lan nes on  vious  Ringgold Road (US‐41) from prev 2040 plan to conne ect all  phases in the 2 of Ringgold Roa ad with bike lanes s  and/or multi‐use paths  Mack Sm mith  Rd.  Georgia State  Line  0.723  $761,9 938.95  Transportation  Alternatives  $609,551.16  80.00%  $76,193.89  10.00%  $76,193.89  10.00%  Section 8 – In nvestment Pri iorities  154  Shor rt Description  From m:  To o:  Project Cost ( (YOE)  Federal Funding  Cate egory  Percent  State  Funding  Source  S Category  Length  (miles) Percent  Federal  Funding  Project  Sponsor  Fed ederal Funds  S State Funds  Lo ocal Funds 
  14. 14. Chattanoog ga‐Hamilton Cou unty/North Geo orgia 2040 Regio onal Transportation Plan  State  Reven nue  Tier r  2040  RTP  ID  TN  2030  TN  Percent  Local  Funding  F Pro oject Name:  36  City of East  Ridge  Ca all for  Pr rojects  Spring C Creek Road  Multi‐U Use Path  Complete  Streets‐ Bike/Ped  This project will add a multi‐use path  hat has very limited  along a road th sidewalk access. It will connect a an  hool and a hospita al to  elementary sch Ringgold Road and the Chattanooga  s transit stops are  area where bus   located.  US‐41  d  (Ringgold Road)  Chattano ooga  at South h  Terrace 1.05  $1,010,8 841.36  Transportation  Alternatives  $808,673.09  80.00%  $0.00  0.00%  $202,168.27  20.00%  2030  37  City of East  Ridge  Ca all for  Pr rojects  McBrien Road Multi‐ Use Pat th  Complete  Streets‐ Bike/Ped  This project will create a multi‐use  as no  path on a stretch of road that ha sidewalk or bik ke lane. This will al llow  pedestrians and bike users to acc cess  ons as well as conn nect  local destinatio to Chattanooga a where bus transit  stops are located.  US‐41  d  (Ringgold Road)  South Te errace  (Chattan nooga  City Limits)  0.78  $873,5 562.75  Transportation  Alternatives  $698,850.20  80.00%  $0.00  0.00%  $174,712.55  20.00%  TN  2030  34  City of East  Ridge  Ca all for  Pr rojects  US‐41/US‐76/SR‐8 to  Statelin ne Multi‐Use  Path  Complete  Streets‐ Bike/Ped  This project will add a multi‐use path  hat does not have  along a road th either or has ve ery limited sidewa alk  access. It has b been noted that AD DA  access is neede ed in this area as  residents who live on this stretch h of  road have limit ted access to Ringg gold  Road.  US‐41  n  (McBrien Road Sou uth  from Rin nggold  Road)  Georgia State  Line at  Stateline e Road  0.792  $974,0 076.50  Transportation  Alternatives  $779,261.20  80.00%  $0.00  0.00%  $194,815.30  20.00%  TN  2030  170  City of East  Ridge  RT TP  Te eam  Ringgold  US 41/R Rd./Dodds Ave.  Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2010 Bike/ /Ped  Plan Primary Network  Brainerd  Rd./McC Callie  Ave.  South  Seminole  Drive.  2  $2,839,3 339.01  Congestion  Mitigatio on and  Air Quality  $2,271,471.21  80.00%  $0.00  0.00%  $567,867.80  20.00%  TN  2030  7  Ha amilton  Co ounty  all for  Ca Pr rojects  Standifer Gap Road  "S" Curve  Improvement  7800‐ lock  7900 Bl Preventative  Maintenance  Realignment of f roadway to remo ove  horizontal curv ves  N/A     0.25  $678,3 352.57  Highway y Safety  Improve ement  Program m  $610,517.32  90.00%  $0.00  0.00%  $67,835.26  10.00%  TN  2030  1  Ha amilton  Co ounty  Ca all for  Pr rojects  Roberts s Mill Road  improvements  Preventative  Maintenance  Preventative M Maintenance on Ro oberts  Mill Rd. from D Dayton Blvd. to Hix xson  Camp Rd./Sawy yer Rd.  Dayton B Blvd.  Hixson C Camp  Road / S Sawyer  Road  3.2  $1,068,4 405.30  Surface  Transportation  m ‐ TPO  Program $854,724.24  80.00%  $0.00  0.00%  $213,681.06  20.00%  TN  2030  30  Ha amilton  Co ounty  Ca all for  Pr rojects  Hunter Road  Safety  Improvements  Addition of sho oulder width and left  turn lanes from m US‐11 to SR‐58. T There  will be no addit tional travel lanes s and  no additional c capacity.  US‐11  SR‐58  5.72  $20,395,3 307.97  Highway y Safety  Improve ement  Program m  $ $18,355,777.17  90.00%  $0.00  0.00%  $2,039,530.80  $ 10.00%  TN  2030  2  Ha amilton  Co ounty  Ca all for  Pr rojects  "W" Ro oad  improvements  Preventative  Maintenance  Preventative M Maintenance on W W Rd.          $5,087,6 644.30  Surface  Transportation  m ‐ TPO  Program $4,070,115.44  80.00%  $0.00  0.00%  $1,017,528.86  $ 20.00%  TN  2030  185  St taff  Identified /  Pe ending  TP  RT Te eam  Sidewalk Network Set  Aside ‐ TN 2021‐2030  Complete  Streets‐ Bike/Ped  Funding set asi ide to implement  sidewalks on al ll federally classified  arterial roadwa ays within urban a areas  (recommendat tion from 2010  Bike/Ped Plan).          $20,000,0 000.00  Transportation  Alternatives  $200,000.00  1.00%  $0.00  0.00%  $1 19,800,000.00  99.00%  TN  2030  78  TD DOT  Ca all for  Pr rojects  SR‐60  Widening  Widen SR‐60 fr rom two lanes to f four  lanes  Bradley  Line  County L SR‐58 within  Hamilton  County 1.1  $15,806,6 649.18  Surface  Transportation  m ‐ State  Program $ $12,645,319.35  80.00%  $3,161,329.84  20.00%  $0.00  0.00%  Shor rt Description  From m:  To o:  Project Cost ( (YOE)  Federal Funding  Cate egory  Percent  State  Funding  Source  S Category  Length  (miles) Percent  Federal  Funding  Project  Sponsor  Fed ederal Funds  S State Funds  Lo ocal Funds  S Section 8 – Inv vestment Priorities  155 
  15. 15. Chattanooga‐Hamilto on County/Nort th Georgia 2040 Regional Trans sportation Plan  State  Reven nue  Tier r  2040  RTP  ID  TN  2030  112  TD DOT  RT TP  Te eam  I‐24  Widening  Widen from 4 t to 6 lanes; fix  structurally def ficient bridge at I‐24  and I‐124  TN/GA State  Line  US‐27  7.6  $293,240,5 532.04  TN  2030  114  TD DOT  RT TP  Te eam  I‐75  Widening  Widen 6 to 8 la anes; fix structural lly  deficient bridge e at southern port tion  of I‐24 intercha ange  I‐24  TN/GA S State  Line  1.2  $27,090,2 244.58  TN  2030  122  TD DOT  RT TP  Te eam  US‐11/US‐64/US‐ 72/SR‐2 2/Cummings  Highwa ay ‐ PE and  ROW  Widening  ensure 4 lanes throughout includ ding  R underpasses; ad dd  through two RR median, turn la anes and shoulder rs  Browns Ferry  Tennessee  Avenue 2.7  $9,959,2 235.00  TN  2030  214  Va arious  RT TP  Te eam  TN Brid dge  Maintenance Set  2021‐2030  Aside 2 Preventative  Maintenance  Funding set asi ide for bridge  preventative m maintenance activities.          TN  2030  224  Va arious  RT TP  Te eam  TN Safe ety Set Aside  2021‐20 030  Safety  Improvements  Funding set asi ide for targeted sa afety  improvements as they are identi ified  o address safety  in the future to emphasis areas s of roadway  departure, aggressive driving, an nd  intersections.        TN  2030  220  Va arious  RT TP  Te eam  TN Pave ement  Maintenance Set  2021‐2030  Aside 2 Preventative  Maintenance  Funding set asi ide for pavement  preventative m maintenance activities.     TN  2030  228  Va arious  RT TP  Te eam  TN Tran nsit Set Aside  2021‐20 030  Transit‐Local  Bus  Funding set asi ide for set aside fo or  additional transit  cts as they are  capacity projec identified in the future.  TN  2030  227  Va arious  RT TP  Te eam  TN Safe ety Set Aside  2021‐20 030  Safety  Improvements  TN  2030  225  Va arious  RT TP  Te eam  TN Safe ety Set Aside  2021‐20 030  TN  2030  213  Va arious  RT TP  Te eam  TN  2030  223  Va arious  RT TP  Te eam  Project  Sponsor  Section 8 – In nvestment Pri iorities  156  Source  S Fed ederal Funds  Percent  Federal  Funding  S State Funds  Percent  State  Funding  National l  Highway y  Performance  m  Program $2 263,916,478.84  90.00%  $ $29,324,053.20  10.00%  $0.00  0.00%  National l  Highway y  Performance  m  Program $ $24,381,220.12  90.00%  $2,709,024.46  10.00%  $0.00  0.00%  Surface  Transportation  m ‐ State  Program $7,967,388.00  80.00%  $1,991,847.00  20.00%  $0.00  0.00%  $41,729,9 917.00  Surface  Transportation  m ‐ State  Program $ $33,383,933.60  80.00%  $4,172,991.70  10.00%  $4,172,991.70  $ 10.00%    $11,500,0 000.00  Surface  Transportation  m ‐ TPO  Program $9,200,000.00  80.00%  $0.00  0.00%  $2,300,000.00  $ 20.00%       $242,033,5 517.00  Surface  Transportation  m ‐ State  Program 121,016,758.50  $1 50.00%  $ $24,203,351.70  10.00%  $9 96,813,406.80  40.00%          $33,000,0 000.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $5,280,000.00  16.00%  $4,950,000.00  15.00%  $2 22,770,000.00  69.00%  Funding set asi ide for targeted sa afety  improvements as they are identi ified  in the future to o address safety  emphasis areas s of roadway  departure, aggressive driving, an nd  intersections.          $23,000,0 000.00  Highway y Safety  Improve ement  Program m  $ $18,400,000.00  80.00%  $0.00  0.00%  $4,600,000.00  $ 20.00%  Safety  Improvements  Funding set asi ide for targeted sa afety  improvements as they are identi ified  o address safety  in the future to emphasis areas s of roadway  departure, aggressive driving, an nd  intersections.          $27,000,0 000.00  Surface  Transportation  m ‐ State  Program $ $21,600,000.00  80.00%  $2,700,000.00  10.00%  $2,700,000.00  $ 10.00%  TN Brid dge  Maintenance Set  2021‐2030  Aside 2 Preventative  Maintenance  Funding set asi ide for bridge  preventative m maintenance activities.          $41,729,9 917.00  National l  Highway y  Performance  m  Program $ $33,383,933.60  80.00%  $4,172,991.70  10.00%  $4,172,991.70  $ 10.00%  Arterial ITS Signal  Upgrad des and  Synchro onization‐ Set  Aside 2 2021‐2030  ITS  Funding set asi ide for ITS signal  upgrades and s synchronization          $15,000,0 000.00  Surface  Transportation  m ‐ State  Program $ $12,000,000.00  80.00%  $3,000,000.00  20.00%  $0.00  0.00%  Pro oject Name:  Category  Shor rt Description  From m:  To o:  Length  (miles) Project Cost ( (YOE)  Federal Funding  Cate egory  Lo ocal Funds  Percent  Local  Funding  F
  16. 16. Chattanoog ga‐Hamilton Cou unty/North Geo orgia 2040 Regio onal Transportation Plan  State  Reven nue  Tier r  2040  RTP  ID  TN  2030  219  Va arious  RT TP  Te eam  TN Pave ement  Maintenance Set  Aside 2 2021‐2030  Preventative  Maintenance  Funding set asi ide for pavement  preventative m maintenance activities.          $242,033,5 517.00  TN  2030  226  Va arious  RT TP  Te eam  ety Set Aside  TN Safe 2021‐20 030  Safety  Improvements  Funding set asi ide for targeted sa afety  improvements as they are identi ified  o address safety  in the future to emphasis areas s of roadway  departure, aggressive driving, an nd  intersections.          $80,000,0 000.00  Project  Sponsor  Source  S Pro oject Name:  Category  Shor rt Description  From m:  To o:  Length  (miles) Tennessee 2021 1‐2030 Total:  Project Cost ( (YOE)  Fed ederal Funds  Percent  Federal  Funding  National l  Highway y  Performance  m  Program $1 193,626,813.60  National l  Highway y  Performance  m  Program $ $64,000,000.00  Federal Funding  Cate egory  $1,656,938,4 485.00     S State Funds  Percent  State  Funding  Lo ocal Funds  Percent  Local  Funding  F 80.00%  $ $24,203,351.70  10.00%  $2 24,203,351.70  10.00%  80.00%  $8,000,000.00  10.00%  $8,000,000.00  $ 10.00%  $1,1 146,487,982.28   $169,927,431.20   $34 40,523,071.52   TN  2040  143  CA ARTA  RT TP  Te eam  CARTA Route  Frequency  Improvements 2031‐ 2040  Transit‐ Frequency  Improvements  Increase freque ency of CARTA rou utes  9, 16, and 21  t to cut headways in n half          $83,915,9 940.84  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $6,713,275.27  8.00%  $ $10,069,912.90  12.00%  $6 67,132,752.67  80.00%  TN  2040  13  CA ARTA  Ca all for  Pr rojects  CARTA Intelligent  Transpo ortation  System  improvements 2031‐ 2040  Transit‐General  General techno ology maintenance e and  upgrade          $6,521,7 739.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $4,565,217.30  70.00%  $1,304,347.80  20.00%  $652,173.90  10.00%  TN  2040  16  CA ARTA  Ca all for  Pr rojects  CARTA bus shelter  needs 2 2031‐2040  Transit‐General  Maintenance/e enhancements for r bus  shelters          $1,843,3 350.19  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $1,290,345.14  70.00%  $0.00  0.00%  $553,005.06  30.00%  TN  2040  14  CA ARTA  Ca all for  Pr rojects  CARTA bus and  incline car  ements and  replace additions 2031‐2040  Transit‐General  Vehicle replace ement, existing service          $56,521,7 739.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $ $39,565,217.30  70.00%  $ $11,304,347.80  20.00%  $5,652,173.90  $ 10.00%  TN  2040  19  CA ARTA  Ca all for  Pr rojects  CARTA Care a Van  Route increases  2031‐20 040  Transit‐General  No specific rou utes defined          $1,843,3 350.19  Federal T Transit  Funding (5307,  5310, 53 337,  5339)  $1,290,345.14  70.00%  $0.00  0.00%  $553,005.06  30.00%  TN  2040  20  CA ARTA  Ca all for  Pr rojects  CARTA Preventive  Maintenance 2031‐ 2040  Transit‐General  General mainte enance          $43,478,2 261.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $ $30,434,782.70  70.00%  $8,695,652.20  20.00%  $4,347,826.10  $ 10.00%  TN  2040  15  CA ARTA  Ca all for  Pr rojects  CARTA Incline Railway  Improvements 2031‐ 2040  Transit‐General  Maintenance/e enhancements for r  existing system m          $6,521,7 739.00  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $4,565,217.30  70.00%  $1,304,347.80  20.00%  $652,173.90  10.00%  TN  2040  135  CA ARTA  RT TP  Te eam  N. GA/E East  Ridge/A Airport  Transit‐Local  Bus  TN portion of n new local bus service  through N. GA to Eastgate Town  port  Center and Airp Chattano ooga  Airport T Transit  Center  TN/GA S State  Line and d Mack  Smith Rd d.  3.3  $15,473,8 890.69  Federal T Transit  Funding (5307,  337,  5310, 53 5339)  $ $12,379,112.55  80.00%  $270,793.09  1.75%  $2,823,985.05  $ 18.25%  TN  2040  184  City of  Ch hattanooga  TP  RT Te eam  /Dupont  SR 319/ Parkwa ay  Complete  Streets‐ Bike/Ped  Multi‐use path/bridge. From 204 40  RTP Gap Analys sis.  SR  58/Amnicola  Highway y  Pike  Hixson P   $25,461,9 928.49  Congestion  Mitigatio on and  Air Quality  $ $17,823,349.94  70.00%  $0.00  0.00%  $7,638,578.55  $ 30.00%  S Section 8 – Inv vestment Priorities  157 
  17. 17. Chattanooga‐Hamilto on County/Nort th Georgia 2040 Regional Trans sportation Plan  State  Reven nue  Tier r  2040  RTP  ID  TN  2040  TN  Project  Sponsor  Source  S 57  City of  hattanooga  Ch Ca all for  Pr rojects  SR‐58/S SR‐ 319/Am mnicola  Highwa ay  Widening  Widening from m 4‐lanes to 6‐lanes  from Riverport t Road to SR‐153  Riverpor rt  Road  SR‐153 3.3  $106,960,3 320.20  2040  163  City of  Ch hattanooga  TP  RT Te eam  Lee  Highwa ay/Brainerd  Rd./Mc cCallie  Ave./Ba ailey Ave./ML  King Blv vd.  Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2010 Bike/ /Ped  Plan Primary Network  McCutch heon  Road  Riverfront  Parkway y  11  TN  2040  61  City of  hattanooga  Ch Ca all for  Pr rojects  Hickory y Valley Road  Widening  Widening exist ting roadway from m a  2lane section to a 4 lane section from  Road to Enterprise e  Standifer Gap R Parkway  Standifer Gap  Road  Enterprise  y  Parkway TN  2040  70  City of  hattanooga  Ch Ca all for  Pr rojects  SR317/ /Bonny Oaks  Drive ‐ Construction  Widening  Widen from 2 t to 4 lanes (already y four  lanes either dir rection of listed te ermini  specifically from m Silverdale Road east  to I‐75 and from m Preservation Dr rive  west to SR‐17)  Preserva ation  Drive  TN  2040  62  City of  Ch hattanooga  all for  Ca Pr rojects  Wauhatchie Pike  Widening  Widening from m 2 lanes to 4 lanes s  from US‐11 to US‐41/US64  TN  2040  69  City of  hattanooga  Ch Ca all for  Pr rojects  US‐11/US‐64/SR‐ 2/Lee H Hwy  Widening  TN  2040  99  City of  ollegedale  Co Ca all for  Pr rojects  SAU Loop Road  TN  2040  33  City of East  Ridge  Ca all for  Pr rojects  TN  2040  156  City of Red  ank  Ba TN  2040  73  TN  2040  77  Category  Shor rt Description  From m:  To o:  Project Cost ( (YOE)  Federal Funding  Cate egory  Fed ederal Funds  Percent  Federal  Funding  S State Funds  Percent  State  Funding  Lo ocal Funds  Percent  Local  Funding  F National l  Highway y  Performance  m  Program $ $85,568,256.16  80.00%  $ $10,696,032.02  10.00%  $1 10,696,032.02  10.00%  $22,161,1 108.68  Congestion  Mitigatio on and  Air Quality  $ $15,512,776.08  70.00%  $0.00  0.00%  $6,648,332.60  $ 30.00%  1.4  $23,049,1 171.54  Surface  Transportation  m ‐ TPO  Program $ $18,439,337.23  80.00%  $0.00  0.00%  $4,609,834.31  $ 20.00%  Silverdale  Road  5.1  $50,625,8 817.31  Surface  Transportation  Program m ‐ State  $ $40,500,653.85  80.00%  $5,062,581.73  10.00%  $5,062,581.73  $ 10.00%  US‐11  US‐41/U US‐64  2.8  $23,432,4 440.65  Surface  Transportation  Program m ‐ TPO  $ $18,745,952.52  80.00%  $0.00  0.00%  $4,686,488.13  $ 20.00%  Widening from m 2 lanes to 4 lanes s  McCutch heon  Road  SR‐317/Bonny  ive  Oaks Dri 1.6  $35,260,7 759.87  National l  Highway y  Performance  m  Program $ $28,208,607.90  80.00%  $3,526,075.99  10.00%  $3,526,075.99  $ 10.00%  New Roadway  New road for a a bypass around a  college campus s.  Replacement fo or a  part of Univers sity Drive.  Move  functional class sification from  University Drive to new loop road.  ty  Universit Drive at  Drive  College D East  Pike  Apison P (SR‐317) )  1  Camp Jordan Park to  Audubo on Acres Multi‐ Use Pat th  Complete  Streets‐ Bike/Ped  This project will add a multi‐use path  dubon Acres, a nat tural  to connect Aud historic area an nd part of the Trail of  Tears (Chattanooga) to Camp Jor rdan  Park.  No specific  path at t this  time.     0.928  RT TP  Te eam  Dayton  Blvd./C Cherokee Blvd.  Complete  Streets‐ Bike/Ped  Add bike lanes.  From 2010 Bike/ /Ped  Plan Primary Network  Market S St.  SR 153    City of Signal  Mountain  M Ca all for  Pr rojects  Signal M Mountain  Transpo ortation  Study/T Traffic Impact  Analysis  Study  This extension of Timesville Road d  t with Shackleford Ridge  would connect Road in the vicinity of Nolan  d the Signal Moun ntain  Elementary and Middle/High Sc chool.  Timesville  Road Dead  End  Shacklef ford  Ridge Ro oad  1.34  City of Soddy‐ aisy  Da Ca all for  Pr rojects  Daisy D Dallas Road  railroad d overpass @  Harriso on  Lane/Co onnector Road  New Roadway  Daisy Dallas Ro oad railroad overpass @  Harrison Lane/ /Connector Road  provides conne ectivity between U US‐ HWY 27 (SR29) ) and SR319 (Hixso on  Pike)  US‐HWY 27  (SR29) and  SR319 (H Hixson  Pike)     3.4  Section 8 – In nvestment Pri iorities  158  Pro oject Name:  Length  (miles) $7,162,4 430.69  Surface  Transportation  m ‐ TPO  Program $5,729,944.55  80.00%  $0.00  0.00%  $1,432,486.14  $ 20.00%  $679,0 045.84  Transportation  Alternatives  $543,236.67  80.00%  $0.00  0.00%  $135,809.17  20.00%  $18,936,4 413.77  Surface  Transportation  m ‐ TPO  Program $ $15,149,131.02  80.00%  $0.00  0.00%  $3,787,282.75  $ 20.00%  $300,0 000.00  Surface  Transportation  m ‐ TPO  Program $240,000.00  80.00%  $0.00  0.00%  $60,000.00  20.00%  $47,111,0 059.76  Surface  Transportation  Program m ‐ TPO  $ $37,688,847.81  80.00%  $0.00  0.00%  $9,422,211.95  $ 20.00% 

×