Partner Forum 2017 Product Management update and monitoring

916 views

Published on

Olivier Bomboir, New Business & Product Management, and
Julien Bonsangue, Product Manager, explain CE+T Power new products and technologies.

Published in: Technology
  • Be the first to comment

  • Be the first to like this

Partner Forum 2017 Product Management update and monitoring

  1. 1. Product Managment J.Bonsangue O. Bomboir
  2. 2. •  T4S + Catena •  T2S ETH + Catena •  EQ Z4 cabinet •  TUS ALS •  Inverter •  Agil •  ECI 48VDC •  Bidirectionality Our promises PF2015 to 2017
  3. 3. AGIL Modular UPS •  AGIL module •  With BOOST •  Without BOOST to operate with SBP •  AGIL 3/1 without boost
  4. 4. AGIL IP 41 60 kVA +MBP+SBP
  5. 5. AGIL IP 41 80 kVA +MBP+SBP
  6. 6. AGIL IP 41 200 kVA +MBP+SBP
  7. 7. EQ Z4 Cabinet •  Available for TSI Inverter •  Tested by NTS « Munich » •  Challenge : •  meet GR63 sismic zone 4 •  Solution : •  Depth : 700 mm •  Height : 2100 mm •  75 kVA per cabinet •  Optional: door •  Optional TUS to build up to 225 KVA •  Release end Q4-2015 •  Available with Catena
  8. 8. TUS « ALS » •  Problem with previous sync system •  No information exchanged only sync signal •  No possibilty to exceed 90 modules (3x30) •  Solution : •  Implement active communication between TUS modules
  9. 9. TUS « ALS » How ?
  10. 10. TUS « ALS » •  Maximum 30 x 30 modules •  Only available with new BRAVO ECI module •  TUS PLS still available for TSI BRAVO range 48V, 110V, 220VDC •  ECI large system layout : 900 kW below
  11. 11. TUS ALS for AGIL •  Not enough enquiries •  Product on hold not release
  12. 12. Enhanced Conversion Innova0on
  13. 13. Leveraging the past 2007 triple converter in 1 module > 200,000+ Power Converter on the market
  14. 14. Product Range : ECI TECHNOLOGY BRAVO ECI 48/230 – Q4 2016 BRAVO ECI 380/230 – Q2 2017
  15. 15. The future of power conversion
  16. 16. Topology
  17. 17. Bravo ECI 48/230 Output power 3000VA / 2400 W AC In/out voltage 230Vac DC Input voltage 48Vdc Efficiency AC/AC >96% Efficiency DC/AC >93,5% Phases Single & Tri
  18. 18. Efficiency •  System 9 modules 3 phase N+1 total 12 modules installed
  19. 19. Efficiency ECI 48VDC AC R load
  20. 20. Efficiency ECI 48VDC DC to AC R load Compe??on
  21. 21. System integration AC ó AC : 96% DC ó AC : 94% 90kVA per bay
  22. 22. System integration •  Shelf for STD cab integration •  2 RU height for 12kVA / 9,6 kW •  Optional AC distribution, MBP •  36 KVA 1100 x 600x600 •  90 kVA 2100x600x600 mm •  MBP, AC distr. Options •  IP20 (STD) or IP22 (ORQ)
  23. 23. System integration •  Cabinet EQ-Z4 •  90 kVA •  48VDC or 380VDC •  AC output bulk breaker 160A 3p •  TOP cable access only
  24. 24. WHAT’S NEW ? 2017
  25. 25. Bravo ECI 380VDC Output power 3000VA / 2500 W AC In/out voltage 120Vac* to 295Vac DC Input voltage 380Vdc (200* – 405V) Efficiency AC/AC >96% Efficiency DC/AC >94,5% Phases Single & Tri •  Derated <220Vac •  Derated < 270Vdc
  26. 26. Bravo ECI 48/120 Output power 2500VA / 2000 W AC In/out voltage 120Vac DC Input voltage 48Vdc Efficiency AC/AC >96% Efficiency DC/AC >93% Phases Single & Tri
  27. 27. DC/AC inverter
  28. 28. •  48VDC/230VAC •  1000VA / 800W •  Rack of desk mounting •  AC input (optional) e-one features
  29. 29. Cell / Access sites 40 to 200 sites Regional node Central node 1000 to 20000 sites 2 to 3 sites 500 - 3000 VA +300 KVA 15 – 75 KVA Telco structure Required AC load e - o n e 1000VA 230VAC 800W e-one : applica,on typical •  e - o n e i s a D C / A C I n v e r t e r •  e a s y t o i n s t a l l •  e c o n o m i c p r i c e / W •  e f f i c i e n t D C / A C i n v e r t e r
  30. 30. Product Range : ECI TECHNOLOGY BRAVO ECI 48/230 – Q4 2016 BRAVO ECI 380/230 – Q2 2017 « ENERA MODULE »
  31. 31. Bidirectionnality ? 1 2 3 4
  32. 32. Monitoring
  33. 33. T4S & Catena for Agil/Alto PF 2015 Roadmap CapaciNve touchscreen [DONE] PF 2015 Roadmap Modbus RS485 (read-only) [DONE] New feature Sound alarm noNficaNon New feature SNMP v1, v2c & v3 New feature FIFO logfile up to 4000 events
  34. 34. T2S ETH for TSI/Bravo ECI PF 2015 Roadmap Catena (capaciNve) compaNbility [DONE] PF 2015 Roadmap Modbus RS485 (read-only) [APRIL 2017] New feature SNMP CE+T MIB implemented New feature SNMP v1, v2c & v3 [with Catena] New feature FIFO logfile up to 2000 events Modbus TCP [with Catena] New feature PF 2015 Roadmap Bravo ST compaNbility [Q4 2017]
  35. 35. Product roadmap CanDis not supported by T2S ETH Catena is quite big New era of IoT and Industry 4.0
  36. 36. Inview S
  37. 37. Inview S Dedicated workshop on Thursday 2.8’’ display No need of T2S DIN Rail Door mount Wifi CapaciNve touch ECI Agil Li-ion BMS communicaNon
  38. 38. New Measure Box serie The AC Box For AC Voltage monitoring The Ba=ery Box For BaWery Management CAN or Modbus with Inview S Daisy chaining 48V applicaNons

×