Webinar5 slides-2-26-13

373 views

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
373
On SlideShare
0
From Embeds
0
Number of Embeds
34
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Webinar5 slides-2-26-13

  1. 1. EV Employer Initiative – Web Meeting #5 February 26, 2013 Jasna Tomic & Whitney Pitkanen, CALSTART
  2. 2. Webinar Logistics » Please remember: enter your Audio PIN  (shown on your screen) so you can participate  when we get to discussion We cannot “open” your line to talk  unless you enter PIN » All attendees in “mute” mode until discussion;  unmuted for questions » Use the Webinar controls to ask questions  (raise hand) or type a question in dialog box.
  3. 3. Snapshot of Today’s  Participants  » ABB » AeroVironment Inc. » Aviat Networks » Bay Area AQMD » Boeing Company » Booz Allen Hamilton » CA Dept. of General Services » CA PEV Collaborative » Capital Group » California Center for Sustainable Energy » City of Moreno Valley Electric Utility » Coca‐Cola Refreshments » County of Los Angeles » Delta Products Corp. » DMA » Fehr & Peers » Ford Motor Company » General Motors » Greenlots » Honda R&D Americas, Inc. » Intuit » NREL » NRG Energy » Oakley » Quantum » Rutgers University » Sacramento Area Council of Governments » Sacramento Clean Cities » Sacramento EV » SMUD » Southern California Edison » U.S. EPA, Region 9 » UCLA » University of California Riverside » US DOE
  4. 4. » Goal:  Increase the number of American employers offering  workplace charging by tenfold in 5 years. » Pledge Partners are 1) assessing their workforce’s potential PEV  charging demands, and 2) developing a plan to install PEV chargers  for at least one major worksite location. » Pledge Partners: » 3M, Chrysler Group, Duke Energy, Eli Lilly and Company, Ford, GE,  GM, Google, Nissan, San Diego Gas & Electric, Siemens, Tesla and  Verizon. T » Ambassador Partners: » California PEV Collaborative, CALSTART, Electric Drive  Transportation Association, Electrification Coalition, International  Parking Institute, NextEnergy, Plug In America and Rocky  Mountain Institute. DOE Workplace Charging  Challenge Pledge
  5. 5. CALSTARTs Workplace Charging  Outreach Projects and Workshops CALIFORNIA • Workplace Charging  workshop #1 (Google  July 2012) • EV Employer Forum MICHIGAN partnership  with Next Energy • Workplace charging  workshop #2 May  2013 OHIO partnership with  Clean Fuels Ohio • Outreach and survey  with Ohio Employers  • Workshop #3 in Fall  2013 CALSTART workplace charging projects & partnerships
  6. 6. 1 Workplace Charger for Every 3 PEV  Sold = Need 300,000 workplace EVSE by 2017 210,000 350,000
  7. 7. SCAQMD Workplace  Charging Workshop Topics discussed: Workplace Charging – An Important Component of  PEV Infrastructure Workplace Charging Implementation Articulating the Benefits and Overcoming the  Challenges  Workplace Charging Challenges/Issues Panel
  8. 8. Filling Critical Gaps  1. Payment policy • Whether to require payment from their employees for use of company charging equipment or offer it  as an employment benefit,  2. Pricing policy • What pricing structure is appropriate if choosing to require payment ‐ pay $/h or for actual electricity  charged ($/kWh)? 3. Purpose • Whether company charging stations are required to be open for public use 4. System Optimization  • How to optimize parking to ensure that a car doesn’t occupy a charging space long after it is fully  charged.  • How to prioritize charging of fleet vehicles vs. employee vehicles 5. Infrastructure  • Installation process o What types of chargers to use, UL listing, certification, upgrades, permitting, etc.   • Options o Whether to choose 24O vs. 120 Volt chargers or even fast chargers in some cases – and how  many chargers per vehicle. o Connecting chargers with clean DG o V2X – integrating with the building load and managing the peak load of building or site (financial  incentives) o V2X or V2G – play in demand response program of utility or ancillary services with CA ISO • Costs and Benefits o How to assess and avoid demand charges from the utility during peak load periods 6. Incentives  • Whether to use free charging as an incentive vs. company‐paid lease 7,      Internal Procedures • How to secure employee buy‐in • How to secure senior management buy‐in What significant issues are missing?  
  9. 9. CALSTART  Clean Transportation  Technologies  and Solutions

×