BIM SHOW LIVE 14 - Reference models inside a BIM-authoring program

1,262 views

Published on

BIM SHOW LIVE 2014 - Reference models inside a BIM-authoring program - Stig Bengtsson, BIM Manager at BAU Architects Stockholm

Published in: Engineering, Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,262
On SlideShare
0
From Embeds
0
Number of Embeds
18
Actions
Shares
0
Downloads
65
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

BIM SHOW LIVE 14 - Reference models inside a BIM-authoring program

  1. 1. Stig Bengtsson SAR/MSA AIA RIBA LEED AP - BIM Manager at BAU Architects Stockholm Reference models inside a BIM-authoring program BIM-show live 2014
  2. 2. A CASE STUDY ! ! ! ! ! project: Mall of Scandinavia ! Bim program: ArchiCAD ! reference format: IFC
  3. 3. www.bau.se ! 70 people ! The office was founded in 1991 by ! Hans Birkholz Per-Eric Sundby Peter Walker ! BIM authoring program: ArchiCAD (55 licenses)
  4. 4. THE PROJECT: - redevelopment started in 2005 ! - client: Råsta Projektutveckling ! - contractor: PEAB ! - focused around Friends Arena ! - the largest shopping centre i Scandinavia ! - also includes hotel, offices and housing ARENASTADEN (the arena city) SOLNA
  5. 5. Friends Arena FIFA Goal of the Year 2013
  6. 6. THE INITIAL CONCEPT IN 2005
  7. 7. GOOGLE EARTH COORDINATES...
  8. 8. ...TRANSFERED TO AERIAL PHOTOS...
  9. 9. ...HAND DRAWINGS...
  10. 10. ... AND PRESENTATIONS
  11. 11. 2007 : THE FIRST SCHEME WITH A SHOPPING CENTER
  12. 12. 2008 : MALL OF SCANDINAVIA! UNIBAIL-RODAMCO CAME ON BOARD
  13. 13. +9 +6 LOKVÄGEN ARENAPLATSEN PYRAMIDVÄGEN DALVÄGEN MAGASINSVÄGEN VINTERVÄGEN SWEDBANK ARENA BOSTÄDER BOSTÄDER KOLONNVÄGEN IDROTTSPLATS BILBRO GÅNGBRO BACKVÄGEN GUSTAV III:s BOULEVARD +12.5 +2.6 +13.5 +3 +13.5 +18 ZONförfripassage+12 MALL OF SCANDINAVIA HOTELL KONTOR KONTOR BOSTÄDER SOLNA STATION RÅSTASJÖN +9 +6 LOKVÄGEN ARENAPLATSEN PYRAMIDVÄGEN DALVÄGEN MAGASINSVÄGEN VINTERVÄGEN SWEDBANK ARENA BOSTÄDER BOSTÄDER KOLONNVÄGEN IDROTTSPLATS BILBRO GÅNGBRO BACKVÄGEN GUSTAV III:s BOULEVARD +12.5 +2.6 +13.5 +3 +13.5 +18 ÄDEDE ZONförfripassage+12 MALL OF SCANDINAVIA HOTELL KONTOR KONTOR BOSTÄDER SOLNA STATION
  14. 14. THE ARENA CITYOLD TOWN STOCKHOLM
  15. 15. Friends Arena Apartments Hotel Mall of Scandinavia Residences Offices Office Buildings
  16. 16. client: ! total area: ! ! architects: unibail-rodamco ! 300 000 m² (100 000 m² retail) ! BAU, Stockholm Benoy, London Wingårdhs, Göteborg BAU ArchiCAD SketchUp Cinema4D Benoy and Wingårdhs AutoCAD 3D Studio the project started in january 2008 currently under construction planned opening autumn 2015 MALL OF SCANDINAVIA
  17. 17. CONCEPTUAL DESIGN ! 2008-2010 Commercial master plan: Benoy ! 2009-2010 Exterior: BAU ! 2010-2011 Interior: Wingårdhs ! BIM AND DOCUMENTATION ! 2011-2015 BAU MALL OF SCANDINAVIA
  18. 18. Mall  of  Scandinavia  •  General  Sections  Option  A  •  Section  A2-­A2  Mall  A  •  Skala  1:100,  1:4000  (A1)  •  JB B9 B10 B11 B12 B13 B14B8 8 100 8 100 8 100 8 100 8 100 8 100 +12,50 +9,70 +15,20 +6,60 +3,50 +20,70 Origo ±0 +3 Parkering +3 500 +6,6 Parkering +6 600 +9,7 Handel +9 700 +15,2 Handel +15 200 +20,7 Handel/parkering +20 700 +23,8 Parkering +23 800 +26,9 Parkering +26 900 +30,45 Kontor +30 450 +34,25 Kontor +34 250 +38,05 Kontor +38 050 A4-A 6 A6-A 6 A6-A7 873 m 2 Utrymn. A2 A2 Text parking parking shopping shopping shopping INITIALLY 3 LEVELS OF RETAIL OVER 2 LEVELS OF PARKING
  19. 19. Text
  20. 20. . Ny situation för tak över Mall B. 8,1 8,1 16,2 RBYGGNAD D4 D5 D6 D7 D8 Mall B GARAGE GARAGE GARAGE Fläktrum "Mall D" A12 A12 A12 A12 A13 A13 A13 A13 A14 A14 A14 A14 A15 A15 A15 A15 A16 A16 A16 A16 A17 A17 A17 A17 A18 A18 A18 A18 A19 A19 A19 A19 A19 A19 A20 A20 A20 A20 8 100 8 100 8 100 8 100 8 100 8 100 8 100 8 100 Mall C parking shopping parking parking shopping shopping parking parking shopping shopping parking parking PARKING BELOW AND ABOVE RETAIL
  21. 21. A27 A26 A25 A25 A24 A24 A23 A23 A22 A22 A21 A21 A20 A19 A18 A17 A16 A15 A14 A13 A12 A11 A10 A9 A8 A7 A6 A5 A4 A3 A2 A1 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25 B26 B27 B28 B29 B30 B31 B32 B33 B34 B35 B36 B37 B38 B39 B40 B41 B42 B43 B44 B45 B46 D8 D7 D6 D5 D4 D3 D2 D1 E0 E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E36 E37 E38 E39 E40 E41 E42 E43 E44 E45 E46 E47 E48 E49 E50 C1 GH1 GH2 GH3 GH6 GH7 GH8 GH9 GH10 GH11 GH12 PH4 PH1 PH2 PH3 PH5 PH6 GH13 GH14 PH9 PH10 GH16 GH15 GH17 GH18 PH12 PH11 PH13 PH14 VS3VS3 TRADE UP 5 072 m² TRADE UP 987 m² TRADE UP 130 m² TRADE UP 1 735 m² TRADE UP 1 350 m² FOOD STORE 6 001 m² TRADE UP 2 232 m² TRADE UP 2 363 m² TRADE UP 1 842 m² TRADE UP 4 266 m² VS2 VS2 VS4 VS4
  22. 22. 3 23 EXTERIOR
  23. 23. Joined or Separate?NERAL
  24. 24. Joined or Separate?GENERAL concept study
  25. 25. Byrån f ALL OF SCANDINAVIA • ARENASTADEN • 2009 06 23 Reliefed concrete panels together with strips of light create a large pattern that ties the building into one volume H&M, Herzog &
  26. 26. 1 2 3 concept development
  27. 27. Option:A “Ice-flows” concept development
  28. 28. CANDINAVIA | SOLNA STADSBYGGNADSNÄMND | 2011 05 18 Byrån för Arkitektur & Ur
  29. 29. INTERIOR
  30. 30. +9.3 +9.3 RAMPTILL+6,65 Trapphus/Kontor Schakt/Kontor TAKH ÖJD UND ER RAM P H=2 300 EVAKUERINGSGÅNG LÖPER PARALLELLT MED BILRAMP H=23 80 BOSTÄ DER BOSTÄ DER BOST. KO NT OR T1 6 GH1:1 GH1:2 GH1:3 GH2:1 GH1:9 GH 1:1 4 GH 2:3 GH1:12 GH1:13 GH1:10 GH1:11 PH3:1 PH3:2 GH2:4 GH2:5 GH 1:1 5 GH2:2 EARTH WIND WATER FIRE T2 2 T10 T10 T10 T10 T3 T3 T2 T2 T15 T15 T14 T2 0 T2 0 T12 T12 T2 1 T1 T1 T2 0 T2 2 UKSCHAKTBOTTEN+13,1 SE RV ICEK ORR ID OR Godshissar SE RV ICEK ORR ID OR 0604 0604 06 04 06 05 We lco me Ha ll Vent H TL/FL Servicekorridor Servicekorridor 0604 06 04 11 02 06 04 10 09 PO ST 03 07 Vent G FL RÖR Elschaktgarage 0604 Elschakt Elschaktgarage 0201 Miljorum 08 10 Frd /nä tbu rar 0604 El typ1 07 02 ,07 03 ,07 04 07 06 07 05 07 08 Servicekorridor 0604 El typ1 0307Städ 0702,0704,0710 0703 0708 0703 0705 0705 0706 0702,0704 0706 Uthyrbaraförråd/omklädningsrum Loge Eventförråd (låg takhöjd) Servicekorridor Uth yrb ara för råd Uthyrbaraförråd/omklädningsrum GH1:4 GH1:5 HH7:1 T9 T9T9 T1 7 T1 7 T1 8 T1 8 RT 39 RT 40 RT26 RT25 T1 8 T4 T11 T11 +9,9 0806 Kid cars 0805 Automatytor 0807 Aktivitetsplats 0811 Bankomat ZON MED REDUCERAD FRI HÖJD PASSERANDE VENTILATIONSSTRÅK UK +14,3 UK+13,7 ZO N MED RE DU CE RA D FR I HÖ JD PA SS ER AN DE VE NT ILA TIO NS ST RÅ K UK +1 4,3 08 11 Ba nk om at ZONBAKOMFACKVERK ZONMEDREDUCERADFRI HÖJD UK+13,1 ZONMEDREDUCERADFRI HÖJD UK+13,1 ZONMEDREDUCERADFRI HÖJD UK+13,1 GH1:8GH1:7 PH 3: 4 PH 3: 3 PH3:7PH3:8 PH3:5 PH3:6 GH1:6 PH 6:1 PH 6:2 BOSTÄ DER BOSTÄ DER ÖPPETNED ÖP PETNE D KONTOR KO NT OR 0307 Städ 0201 Miljörum 1104 Servicestation 0201 Miljorum 0604 El typ1 Godshissar Godshissar 06 04 0605 Servicekorridor Servicekorridor 0307 Städ SE RV ICEK ORR ID OR 10 06 PA US RU M 04 04 RW C 10 08 VIL RU M 10 07 KP R 10 02 FÖ RR ÅD /KO P. Frd (uthyrbart) 02 01 10 01 10 01 10 01 10 01 10 01 0306 Städ Hiss 0605 El typ2 0605 El typ2 08 08 RM U 10 05 GÄ STA RB .PL . SERVICEKORRIDOR Utrym ning Servicekorridor HISSH ALL Rör Hisshall Servicekorridor Servicekorridor Hisshall Servicekorridor Servicekorridor Hisshall Servicekorridor PA SS AGE El typ1 garage Fläktrum Fläktrum Garage Ve nt Fläktrum0412 Vilrum Vent HFrd (uthyrbart) 0201 Miljörum 03 07 SE RV ICEK ORR ID OR 11 02 11 08 Tag s 06 05 SE RV ICEK ORR ID OR 05 02 Ark iv 05 01 DR IFT LED . Vent G FL Sluss 04 03 04 09 11 09 PE NT RY 10 04 KO NF .RU M 11 06 VA KT RU M 04 03 10 03 KO NF .RU M 11 04 SER VIC EST AT ION 11 07 El typ1 garage Sluss 11 09 10 02 08 10 FR D/ NÄ TB UR AR SER VIC EK OR RID OR Frd (ut hy rba rt) 07 02 ,07 03 ,07 04 ,07 10 04 13 AN DA KT 02 01 MI LJÖ RU M Servicekorridor SLU SS FÖ RR ÅD (UT HY RB AR T) Sluss Sluss Sluss FÖ RR UM Rör LEVEL 30
  31. 31. SCOPE 4
  32. 32. VY FRÅN MÅLBR
  33. 33. VY FRÅN SIGNALBRON
  34. 34. DESIGN TOOLS ! ArchiCAD FormZ Cinema4D SketchUp Photoshop ! 3D-MODELS ! ArchiCAD FormZ Cinema4D SketchUp ! DOCUMENTATION ! ArchiCAD MODELING AND DOCUMENTATION
  35. 35. 8 linked files: ! site model exterior structure stairs and core interior walls ceilings interiors shop layouts ! 10-12 users ArchiCad 13 & 14 (TW2) ! 4 linked files: ! site model ! exterior ! interior ! ! shop layouts ! 6-8 users ArchiCad 12 (TW1) exclusively linked .mod-files - no linked .pln-files and no ”nested” modules leads to quicker updates and better control over file content Jan. 2008 - Aug. 2009: Sep. 2009 - Dec. 2011: ArchiCAD versions och file structure ArchiCad 15, 16 & 17 (TW2) ! 11 linked files: ! site model ! ! 8 block models ! a combined model ! shop layouts ! 15-18 users Jan. 2012 and on:
  36. 36. ArchiCAD-model + ”Ice flows” from Cinema4D
  37. 37. ! Cinema4D + Photoshop
  38. 38. construction studies in SketchUp
  39. 39. ... with the roof tool and saved as multi-story ”facade objects”... ArchiCAD 14 ArchiCAD 16 ... morph
  40. 40. REFERENCE MODELS INSIDE OF ARCHICAD
  41. 41. SOURCES ! Tekla ! PILINGS, FOUNDATIONS AND GROUND FLOOR SLAB ! PRECAST CONCRETE ! PRIMARY STEEL STRUCTURE ! SECONDARY STRUCTURE
  42. 42. MAGICAD ! MECHANICAL
  43. 43. FILTER UNNECESSARY DETAILS
  44. 44. TRANSLATORS FOR IMPORT AND EXPORT
  45. 45. FILTERING THE PREFAB CONCRETE AFTER IMPORT
  46. 46. FILTERING THE STEEL FRAME AFTER IMPORT
  47. 47. CHANGING PROPERTIES AFTER IMPORT
  48. 48. COORDINATION SECTIONS
  49. 49. COORDINATION VIEW SETTINGS
  50. 50. A BEAM IS A BEAM AND NOT JUST ANOTHER OBJECT
  51. 51. BOOLEAN OPERATOR LAYER
  52. 52. BOOLEAN OPERATOR LAYER TURNED OFF
  53. 53. LIGHT FIXTURES
  54. 54. CABLE TRAYS
  55. 55. SPRINKLERS
  56. 56. SECONDARY STRUCTURE
  57. 57. IFC IS NOT PERFECT
  58. 58. VY FRÅN SIGNALBRON

×