1. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
1 of 22
VERTEX RAIL TECHNOLOGIES LLC
603 West Street Mansfield, MA 02048
QUALITY ASSURANCE MANUAL
IN ACCORDANCE WITH
ASSOCIATION OF AMERICAN RAILROADS
SPECIFICATION FOR QUALITY ASSURANCE M-1003
Quality Assurance Manual: QAM 01
Revision Level: B
Date of Issue: 4 August 2014
2. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
2 of 22
REVISION HISTORY
Revision Change Date
A Original Issue 10 Feb 14
B Changed address and logo 04 Aug 14
3. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
3 of 22
TABLE OF CONTENTS
1.0 Scope
2.0 Normative Reference
3.0 Terms and Definitions
4.0 Quality Management System
4.1 General Requirements – AAR M-1003 Sections 2.1, 2.2, 2.3
4.2 Documentation Requirements – AAR M-1003 Sections 2.7, 2.17
5.0 Management Responsibility – AAR M-1003 Section 2.4
5.1 Management Commitment
5.2 Customer Focus
5.3 Policy
5.4 Statement of Commitments
5.5 Quality Objectives
5.6 Quality Policy
5.7 Policy: Responsibility, Authority and Communication
5.8 Management Review
6.0 Resource Management
6.1 Provision of Resources
6.2 Human Resources – AAR M-1003 Section 2.22
6.3 Infrastructure – AAR M-1003 Section 2.15
6.4 Work Environment
7.0 Product Realization
7.1 Planning of Product Realization – AAR M-1003 Sections 2.23, 2.5
7.2 Customer-related Processes – AAR M-1003 Section 2.23, 2.5
7.3 Design and Development – AAR M-1003 Section 2.24
7.4 Purchasing – AAR M-1003 Section 2.9
7.5 Production and Service Provision – AAR M-1003 Sections 2.13, 2.14,
2.15, 2.16
7.6 Control of Monitoring and Measuring Devices – AAR M-1003 Section 2.8
8.0 Measurement, Analysis and Improvement
8.1 General
8.2 Monitoring and Measurement – AAR M-1003 Sections 2.10, 2.11, 2.12, 2.21,
8.3 Control of Nonconforming Product – AAR M-1003 Section 2.18
8.4 Analysis of Data – AAR M-1003 Section 2.20
8.5 Improvement – AAR M-1003 Section 2.6
4. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
4 of 22
1.0 Scope:
1.1 General: This manual is issued and implemented to consistently provide quality product
meeting customer contractual, standards, or regulatory requirements. Its aim is continual
improvement and customer satisfaction. Changes and additions mandated by the addition of
AAR Specification M-1003 will be italicized. All additions dealing with ASME requirements
are identified as such. All revisions made to update the system to reflect actual current
practices will be listed in the revisions section.
1.2 Application: This manual applies all the processes defined by The ASSOCIATION OF
AMERICAN RAILROADS.
2.0 Normative Reference:
ASSOCIATION OF AMERICAN RAILROADS SPECIFICATIONS: M-1003, M-1002, M-
1001, S-2034
3.0 Terms and Conditions:
Terms and definitions per specifications cited above.
The Supply Chain is: supplier >>> organization >>> customer
Definitions: The organization is the entity producing product to the customer. The supplier is
a subcontractor or vendor supplying product or services to the organization.
4.0 Quality Management System:
4.1 General Requirements:
4.1.1 Purpose: Vertex Rail Technologies, LLC has developed this quality manual to establish,
document, implement, maintain, and continually improve its quality management system per
the requirements of the Association of American Railroads, M-1003.
4.1.2 Scope: This manual defines the program established regarding all activities at Vertex Rail
Technologies, LLC that directly affect the quality of our processes and products.
5. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
5 of 22
4.1.3 Policy: The quality management system established puts the organization’s activities under
control by to produce quality products by: (a) identifying and applying the processes required,
(b) determining their interrelationships, (c) establishing criteria and methods to ensure process
effectiveness, (d) sufficiently documenting and communicating necessary data, (e)
monitoring, measure and analyze processes, and (f) taking action to achieve planned results
and continual improvement of processes. Outsourced processes that effect product
conformity, such as sub-contracted finishing operations or machining, are controlled under the
purchasing requirements of an approved supplier and are subject to qualification and
evaluation required of all suppliers.
4.1.4 Responsibility: All employees and suppliers in their area of control.
4.1.5 Reference: AAR M-1003, Vertex Rail Technologies, LLC SOP 3 specifically, and third level
forms and records in general.
Documentation Requirements:
4.2.1 Purpose: This policy is to ensure that that all documentation and data used by the quality
management system is controlled, reviewed /approved, and released for use.
4.2.2 Scope: This documentation and data includes all quality management system documentation
including documented statements of quality policy and objectives, the quality manual,
standard operating procedures, any other internal and external documents to ensure planning,
operation and control, and required records.
4.2.3 Policy - General:
4.2.3.1 Vertex Rail Technologies, LLC: has established a quality manufacturing system and the
organizational structure and resources to support it. The system consists of this quality
manual, secondary standard operating procedures and third level product centered procedures,
instructions and forms. Implementation is achieved by adherence of all employees to this
manual, documented procedures, and work instructions and forms. To ensure the
effectiveness of the established quality management system, quality audits of the quality
system are performed and documented. Vertex Rail Technologies, LLC has established a
system and procedures for quality planning to ensure that all products are manufactured in
accordance with all customer drawing, specifications and requirements. Quality planning
shall include a documentation of manufacturing/servicing and quality controls, processes,
testing, possible problem areas, verification hold points, acceptance standards, and record
requirements.
4.2.3.2 Vertex Rail Technologies, LLC: has documented and implemented a company slogan, quality
policy and quality objectives, which form the core of the quality management program at
Vertex Rail Technologies, LLC. These are detailed in section five of this manual and in
separate signed statements.
6. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
6 of 22
4.2.4 Policy – Quality Manual: This quality manual has been established to outline the scope of the
quality management program at Vertex Rail Technologies, LLC documenting any exclusion,
referencing any secondary operating procedures and additional documentation, and describing
the various responsibilities involved.
4.2.5 Policy – Control of Documents: Documents utilized by the quality management system as
delineated above in paragraph 4.2.2 are controlled by approval, review, revision status,
availability for use, legibility and identification, and distribution Vertex Rail Technologies,
LLC has established and maintains procedures for the control of all documents and data.
These documents are reviewed and approved for adequacy by authorized personnel prior to
issue. The documents are made available to operations as required to ensure the proper
functioning of the quality system. Obsolete documents are properly identified and controlled.
Changes and revisions to documents are reviewed and approved by the same functional
groups or personnel that performed the original review and approval, unless designated
otherwise. The changes are identified on the original document or on appropriate change
authorizing approval documents. Documents shall be re-issued after a practical number of
changes have been made.
All documents and data are maintained in English both in hard copy form and by means of
electronic media. Master data lists and/or files are maintained to identify the current revision
of documents. At a minimum of once yearly, all documentation in the QMS shall be reviewed
and updated as needed by the management team to ensure relevancy in all areas of the
program and to foster continual improvement. All changes shall be examined closely to
ensure that only positive results are achieved.
4.2.6 Policy - Control of Records: Records are established and maintained to facilitate ease of
retrieval, minimize deterioration or damage, and to prevent loss. Records are legible,
identifiable and easily retrievable. Records are made available to customers as specified by
contract or regulation. Records shall be further controlled by procedure to control
identification, storage, maintenance, and retrieval. Records shall be maintained and stored as
hard copy and by electronic media. The records retention list shall denote record location and
guardian.
4.2.7 Responsibility: The Management Team consisting of the Chief Executive Member, Quality
Assurance Manager, and Operations Manager shall be responsible for the implementation of
this manual in its entirety. The Chief Executive Member of Vertex Rail Technologies, LLC,
shall retain ultimate responsibility for its successful execution.
Reference: Vertex Rail Technologies, LLC QM 2.1.3
7. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
7 of 22
5.0 Management Responsibility
5.1 Purpose: This policy is to ensure that the management team at Vertex Rail Technologies, LLC
is completely committed to the development and implementation of the quality management
program at Vertex Rail Technologies, LLC, focusing on a determination of customer
requirements leading to complete customer satisfaction.
5.2 Scope: This policy includes all facets of the quality management system at Vertex Rail
Technologies, LLC.
5.3 Policy: Management Commitment and Customer Focus - The Chief Executive Member of
Vertex Rail Technologies, LLC has directed and given complete authority to the Quality
Assurance Manager to assume responsibility for the quality system implementation.
5.4 Statement of Commitments: We believe that…
Customer satisfaction can only be attained through continual improvement.
Our employees are experts in their particular line of work and as such are empowered to make
product quality decisions.
Vertex Rail Technologies, LLC is committed to nurturing professional development through
training and education.
World class quality is attainable by aligning the interest of customers, Employees and other
stakeholders through teamwork, open lines of communication and the constant measuring and
monitoring of business parameters.
Quality Objectives:
Customer satisfaction rating: + 90%
On time Delivery rating: + 90%.
Cost of Quality < 2%
8. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
8 of 22
COMMITMENT AND AUTHORITY
The Chief Executive Member of Vertex Rail Technologies, LLC is committed to the continual
implementation of this Quality Assurance System and has delegated complete authority to the Quality
Assurance Manager to insure full compliance with, and proper implementation of, all systems
prescribed by this manual. The Quality Assurance Manager is committed to fulfilling all
responsibilities and duties delegated by this authority.
Donald G. Croteau Brian McAuliffe
Chief Executive Member Quality Assurance Manager
Vertex Rail Technologies, LLC Vertex Rail Technologies, LLC
The Quality Assurance Manager working in conjunction with the Chief Executive Member and
Managers of Vertex Rail Technologies, LLC have the authority and responsibility for ensuring that
the quality management system mandated herein is developed, implemented and maintained and shall
report status to the Managing Director for review and improvement; informally as needed and
formally during Management Review meetings. The QMS documentation shall be reviewed yearly at
a minimum by the Management Team.
The system is maintained by the quality management organization. The managers are responsible for
implementing and communicating the quality system in their departments to their employees.
Responsibility may be delegated to subordinates as required, but the delegator retains ultimate
responsibility. It is the responsibility of the Management Team of Vertex Rail Technologies, LLC to
create a system and an environment that supports the ongoing development and improvement of our
quality policy and quality objectives, and records are kept of the results and verification of the work
being performed. A special focus is made to ensure customer requirements are determined and
fulfilled to ensure customer satisfaction.
The Managing Director is ultimately responsible for ensuring that all employees are aware of the
importance of the development and implementation of the quality management system and
continuous improvement; the conducting of quarterly management reviews; adherence to quality
policy, quality objectives and management reviews; the maintenance of adequate resources; and the
communication to all the importance of fulfilling all statutory and regulatory requirements.
9. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
9 of 22
5.6 Quality Policy: Vertex Rail Technologies, LLC has adopted a Quality Policy that is
appropriate to purpose of Vertex Rail Technologies, LLC and acts as the driver for the quality
management system. The Quality Policy initiates general goals to fulfill the requirements of
the quality management system, to achieve customer satisfaction and continuous
improvement, and a framework for establishing specific quality objectives. The quality policy
is subject to regular review to determine continued appropriateness. Vertex Rail Technologies,
LLC quality policy statement is as stated in Vertex Rail Technologies, LLC “Statement of
Commitments”.
5.6.1 Quality Objectives: To fulfill the goals set forth in our quality policy, Vertex Rail
Technologies, LLC has established measurable quality objectives, derived from the tenets set
forth in the quality policy. The quality objectives are developed from the various facets and
levels of the quality management system and are stated in Vertex Rail Technologies, LLC
“Statement of Commitments”. Additionally a slogan has been adopted to symbolize Vertex
Rail Technologies, LLC major drive. The slogan is as follows:
“RAILCARS SOLUTIONS”
5.6.2 Quality Management System Planning: Personnel so stated in the various quality documents
implement and maintain the quality management system. Personnel responsible for the
successful achievement of quality objectives are designated by procedure. This planning and
the results are reviewed as part of the management review input process. Any changes in the
Quality Management system are reviewed prior to implementation by the Management Team
to ensure that the integrity of the system is maintained.
5.7 Policy: Responsibility, Authority and Communication –
5.7.1 The Management Team: ensures that all personnel responsibilities are defined and
communicated by the quality manual, secondary standard operating procedures, and with a
personnel responsibilities matrix.
5.7.2 Management Representative: The Quality Assurance Manager of Vertex Rail Technologies,
LLC has appointed an official management representative for the quality management system
who ensures quality management system is established, implemented, maintained on a
continual basis, and reviewed for effectiveness at defined internals. The Management
Representative reports status and need for improvement to top management, and ensures
awareness of customer requirements to all personnel including suppliers.
10. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
10 of 22
The Management Representative manages the corrective/preventive action programs that
work to prevent non-conformances and when they occur, ensues that nonconforming material
is segregated and initiates actions to ensure they are prevented from reoccurrence.
Additionally, the effectiveness and sustainability of all corrective/ preventive actions are
monitored to ensure continued compliance.
The Quality Assurance Manager is the Management Representative.
5.7.3 Internal Communication: Effective communication of the requirements of the quality
management system is done by strict implementation of provisions in the quality manual,
secondary procedures, and instructions and forms. All personnel are thoroughly trained in
their individual areas of responsibility and these responsibilities are documented on each
individual’s responsibilities sheet. Effective communication is achieved with daily verbal and
written communication between individuals and groups, weekly production meetings, and
quarterly review meetings. During this process all employees are instructed to remember that
at no time should quality assurance requirements be subordinated to manufacturing processes.
The Management Team periodically reviews the status of human resource requirements
against existing needs in all areas – management, production, inspection and test and training
– to determine adjustments that need to be make to ensure the work force is adequate.
5.7.4 Responsibility: The Management Team
5.7.5 Reference: Vertex Rail Technologies, LLC SOP 2.4, second level procedures in general.
5.8 Policy: Management Review
5.8.1 Purpose: This policy is to ensure that Vertex Rail Technologies, LLC conducts quarterly
management reviews of the quality management system to ensure its suitability, adequacy,
and effectiveness; to assess opportunities for continual improvement; to examine the
appropriateness of the system including the quality policy and quality objectives.
5.8.2 Scope: The entire quality management system is subject to review and change to effect
customer satisfaction through continuous improvement.
5.8.3 Policy: The Management Team examines the quality management system utilizing proscribed
review inputs as evaluation tools and issues review outputs to initiate actions for system
upgrades. Inputs and outputs include but are not limited to the following:
(a) Review inputs: results from internal and supplier audits; customer feedback ( from
customer satisfaction surveys, report cards, returns, verbal and written complaints, etc.); the
record of process performance and product conformity; results of quality objectives; status
preventive and corrective actions; action items results from previous reviews; appropriateness
of the quality management system; changes in the QMS and its quality policy and quality
objectives; and general recommendations for improvement from any source.
11. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
11 of 22
(b) Review outputs: results from the analyzing of review inputs result in action items to improve the
quality management system and processes; improve product conformity; and fulfill resource needs.
5.8.4 Responsibility: The Management Team shall be responsible the management review process.
5.8.5 Reference Documents: Vertex Rail Technologies, LLC SOP 2.4
6.0 Resource Management
6.1 Provision of Resources
6.1.1 Purpose: This policy is to ensure that Vertex Rail Technologies, LLC has and maintains the
resources required to maintain the quality management system, effect continuous
improvement, and provide complete customer satisfaction.
6.1.2 Scope: This policy applies to all activities affecting customer product or services.
6.1.3 Policy: Vertex Rail Technologies, LLC shall encourage excellence in all members of our
organization. We will continually improve the methods we employ in marketing,
manufacture and service of our products to ensure industry leadership. This policy shall be
integrated and implemented through an active involvement by the entire organization. Our
ultimate goal is the absolute and complete satisfaction of our customers.
6.1.4 Responsibility: The Management Team
6.1.5 Reference: Vertex Rail Technologies, LLC SOP 2.4
Human Resources
6.2.1 Purpose: This policy is to establish and maintain procedures for the training and qualification
of Vertex Rail Technologies, LLC employees to ensure that work is competently executed.
6.2.2 Scope: This policy applies to all activities affecting customer product or services. It applies to
general training of quality requirements and specific training for special or key processes (e.g.
welding) and periodic evaluation of training effectiveness.
6.2.3 Policy: Management shall give our employees the resources, training, and support to provide
our customers with quality products and services that meet or exceed their expectations. This
quality manual supported by second level procedures and third level instructions and forms
will provide the framework and tools to implement a sound quality system. On a regular
basis, employees shall be made aware of the importance of their contributions to the
overall success of Vertex Rail Technologies, LLC achievements. Notification shall be made
via personal contract, memos and bulletin board postings.
12. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
12 of 22
The Pre-Hire Evaluation Report determining if the applicant meets competency requirements
of Vertex Rail Technologies, LLC shall be used to evaluate prospective employees prior to
employment.
Personnel employed in special or key processes shall be qualified by function-specific training
and by work experience to achieve qualification status.
Training records are maintained of all training and evaluations.
6.2.4 Responsibility: Manufacturing Manager, Shop Foreman
6.2.5 Reference: Vertex Rail Technologies, LLC SOP 2.22
Infrastructure and Work Environment
6.3.1 Purpose: This policy shall ensure machinery and equipment used to manufacture product and
effect servicing at Vertex Rail Technologies, LLC is properly maintained and serviced to
prevent failure during the manufacturing or servicing process, resulting in possible non-
conformances, delays and other detrimental effects. Additionally it shall ensure that all
work areas are maintained to create a safe and productive work environment.
6.3.2 Scope: This policy includes all machinery, equipment and work areas used to manufacture
products or effect servicing at Vertex Rail Technologies, LLC.
6.3.3 Policy: Elements of Maintenance Function: Maintenance personnel shall at a minimum be
responsible for the following: a) determining all machinery and equipment maintenance and
servicing requirements based on the manufacturer's recommendations and good maintenance
practices; b) develop complete maintenance and servicing schedules based on the
requirements delineated above; and c) ensure that all maintenance and servicing is performed
and properly documented.
Documentation: To provide adequate records of maintenance and servicing requirements all
machinery and equipment shall have individual written maintenance and servicing
requirement sheets with maintenance and servicing documented with appropriate sign-off
and dating.
6.3.4 Policy: Work Environment: All work areas shall be kept neat and clean to create a safe and
productive work environment. Individual employees shall be responsible for maintaining
their individual work areas.
6.3.4 Responsibility: Manufacturing Manager, Shop Foreman
6.3.5 Reference: Vertex Rail Technologies, LLC WIP 2.15-04, F 2.15-09, & F 2.15-11
13. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
13 of 22
7.0 Product Realization
7.1 Planning of Product Realization
7.1.1 Purpose: This policy is to establish a procedure within the quality/manufacturing system
to provide for the planning of processes to achieve product realization.
.
7.1.2 Scope: This policy applies to all contracts that affect the manufacturing/servicing of products
produced by Vertex Rail Technologies, LLC.
7.1.3 Policy: The planning of product realization consists of the development of a Quality Plan to
determine product quality objectives and requirements, establish processes, resources,
documentation, and verification and validation techniques necessary to effect successful
completion of the work, and provide records as evidence that all product realization
requirements are realized. The Engineering and Production Packages provide for the
development of the contract review and Quality Plan report, development of shop drawings,
documents establishing manufacturing sequence and quality control hold points (Job
Travelers); and reports verifying inspection and testing activities.
The Inspection & Test Plan is encapsulated in the Shop Traveler and any related inspection /
test reports mandated by the traveler. Hold points are indicated to ensure inspection and test
requirements are satisfied before additional work is performed.
7.1.4 Responsibility: Project Manager and Quality Assurance Manager
7.1.5 Reference: Vertex Rail Technologies, LLC SOP 2.5
7.1.6 Attachment: All forms associated with review, engineering, production, and inspection
activities.
7.2 Customer-Related Processes:
7.2.1 Purpose: This policy is to establish criteria to determine and review product requirements.
7.2.2 Scope: This policy extends to all product produced by Vertex Rail Technologies, LLC.
7.2.3 Policy:
7.2.3.1 Determination of Requirements: During contract review and Quality Plan development
process, Vertex Rail Technologies, LLC determines customer contractual requirements
including delivery requirements, mandated statutory and regulatory requirements, scope of
any ambiguous customer intended needs, and clarifies any additional requirements prior to
commencement of work.
14. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
14 of 22
7.2.3.2 Review of Requirements and customer communication: Once the requirements are
determined, the contract review and Quality Plan development continues by defining
requirement scope, resolving any conflict between quote and contract, and reviewing ability
to effect successful completion of the contract. During contract requirements definition and
review an effective communication system is established with the customer to address
product information, changes, and complaints. Any changes or proposed made during the life
of the contract are subject to the same planning of product realization and determination /
review of requirements.
7.2.4 Engineering Processes: After the contract has been reviewed, Vertex Rail Technologies, LLC
thoroughly studies contract specifications and drawings to produce detailed shop drawings
used by production to manufacture the product. In many cases customer drawing approval is
required. The Engineering function closely monitors the progress of the contract with all of
Vertex Rail Technologies, LLC associated departments to ensure successful completion of the
contract.
7.2.5 Responsibility: Project Manager & Engineering Manager
7.2.6 Reference: Vertex Rail Technologies, LLC SOP 2.5
7.3 Design and Development:
7.3.1 Design Inputs: Design personnel define design inputs from customer, potential customer or
authority defining product. Designer(s) conduct preliminary design reviews with customer
or authority as needed to ensure inputs are properly defined.
7.3.2 Design Outputs: Designer(s) formulate design concepts and design details including
drawings, calculations, material and processing requirements and any other essential
components to satisfy design inputs. During this design process, technical reviews are held
as necessary to ensure outputs will satisfy inputs and design release reviews to ensure the
design is suitable for manufacture. Once the design components are complete and prior to
release, all aspects are subject to through checking to remove any potential issues.
7.3.3 Design Verification & Validation: Prior to manufacture when required and/or mandated,
critical design reviews are held by the customer or authority and VRT management to verify
that the design outputs meet the requirements of design inputs and validate as much as
possible intended use. During this stage, the Factory Acceptance Test (FAT), and when
feasible, the Site Acceptance Test (SAT) are developed and issued for review and approval.
15. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
15 of 22
7.3.4 Design Verification and Validation Tests: After completion of manufacture, product is
subjected to the factory acceptance test (FAT) to verify that the finished product does meet
acceptance criteria mandated by the design outputs and when feasible that intended use has
been validated. The FAT consists of two sections – an instrumentation qualification (IQ) and
an operational qualification (OQ) – to verify and validate design success.
7.3.5 Design Changes: During both the design and manufacturing processes, all changes shall be
identified and documented. Changes shall be subject to the same reviews, verification,
validation and approval processes as the original design. When applicable, the changes shall
be evaluated against existing and previously delivered product.
7.3.6 Responsibility: Engineering Manager
7.3.7 Reference: Vertex Rail Technologies, LLC SOP 2.24
7.4 Purchasing
7.4.1 Purpose: Vertex Rail Technologies, LLC shall ensure that purchased products and services
conform to specified requirements and shall monitor and control suppliers as required to
achieve acceptable results.
7.4.2 Scope: This policy applies to purchased products intended for use that affects the
manufacture and servicing of products produced or serviced by Vertex Rail Technologies,
LLC.
7.4.3 Policy: Vertex Rail Technologies, LLC shall establish and maintain a purchasing system to
ensure that purchased products conform to specified requirements. Purchasing documents
will contain data that clearly describe the product ordered, any approval processes, personnel
qualifications, and quality management system requirements as appropriate.
Suppliers shall be selected and evaluated on their ability to meet contractual requirements as
specified in documents. Criteria shall be established for the evaluation of vendors, both new
and existing. Records shall be maintained of acceptable suppliers. The selection of
suppliers, and the type and extent of control executed by shall be based on the type of
product, and when appropriate, on records of their previous performance and/or
demonstrated capabilities.
Vertex Rail Technologies, LLC shall establish inspection or other verification measures as
necessary to ensure that purchased product or services meet purchase order requirements.
Where specified by contract, Vertex Rail Technologies, LLC, its representative, or Vertex
Rail Technologies, LLC customer may require the right to verify at source or upon receipt
that purchased product conforms to specified requirements. Verification by Vertex Rail
Technologies, LLC will not absolve the supplier of the responsibility to provide acceptable
product nor will it preclude subsequent rejection.
16. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
16 of 22
When verification is required, such as source inspection at a vendor’s facility by Vertex Rail
Technologies, LLC or it’s designated representative, the product verification will not be used
by Vertex Rail Technologies, LLC as evidence of effective control of quality by the vendor.
Material and product verification from vendors if not otherwise inspected shall be subject to
incoming quality inspection on receipt and prior to any processing.
7.4.4 Responsibility: Purchasing Manager
7.4.5 Reference: Vertex Rail Technologies, LLC SOP 2.9
7.5 Production Provision Vertex Rail Technologies, LLC: does not provide service activities.
7.5.1 Purpose: This policy shall ensure that production/servicing processes that affect product
quality and customer satisfaction are identified, planned and carried out under controlled
conditions. These processes shall be subject to validation processes to ensure that incoming
products, in process and finished products are inspected or otherwise verified as conforming
to specified requirements.
Product identification including unique identification where applicable and product status
shall be established and maintained through all stages of production and delivery including
proper care of customer property.
Product shall be preserved and maintained during internal processing and delivery by system
for handling, storage, packaging, preservation, and delivery to ensure product conformity.
Vertex Rail Technologies, LLC shall determine monitoring and measurement required to
produce evidence of conformity of product to customer and regulatory requirements and
monitoring and measuring devices required to achieve required evidence.
7.5.2 Scope: This policy shall apply to all processes used to produce products manufactured by
Vertex Rail Technologies, LLC. Procedures shall ensure that all measures that affect quality
are identified, planned and carried out under controlled conditions. All inspection and test of
products shall be identified as requiring inspection by purchase order, work in process and
finished product as mandated by instructions and quality plan. Vertex Rail Technologies,
LLC does not provide servicing of product.
7.5.3.1.2 Control of Production and Process Validation Provisions
7.5.3.1.2.1 Policy: Vertex Rail Technologies, LLC identifies and plans production processes to ensure
that they are performed under controlled conditions. Process planning includes
comprehensive receiving procedures, documented work instructions, use of suitable
production equipment, a suitable working environment and requirements for compliance to
applicable standards, codes and quality plans. Production processes are monitored and
17. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
17 of 22
controlled after they are approved for use. Production equipment is monitored and
maintained to sustain product quality in accordance with a written preventive maintenance
procedure.
Criteria for workmanship are stipulated where possible in written standards or by
representative samples.
Special processes, where results cannot be fully verified by subsequent inspection and testing,
are qualified and continuously monitored. Compliance with documented procedures is
verified to ensure that specified requirements are met.
Records of qualified processes, equipment and personnel are maintained as appropriate to
meet the requirements of pertinent codes, standards, and specifications. If special processes
are not covered by existing codes, standards or specifications, adequate qualifications will be
established to ensure acceptable product is produced.
Records of system or technical approvals are maintained. Internal audits or checklists are
completed per system requirements and made available for review.
Inspection: Verification activities are to ensure that all requirements of the Quality Plan are
met without exception. Inspection and test activities are performed during all phases of the
production process prior to receipt by suppliers & sub-contractors, receipt inspection, in-
process inspection and test during the production process and final inspection before
shipment. All of these inspections and tests are performed to verify that all required work has
been performed and to validate that the finished product satisfies contractual obligations.
Inspection Status: In addition to inspection status being documented on the job traveler,
additional marking or tagging will be employed to further identify the inspection status of in
process product.
Statistical / Sampling Methods: Where and when applicable, statistical methods and
sampling plans are developed to evaluate and control process variability.
7.5.3.3-4 Product Identification and Traceability Including Customer Property
7.5.3.3-4.1 Policy: Materials affecting product quality are identified from applicable drawings,
specifications or other documents upon receipt. Products are tracked throughout the
production process. Products for delivery are clearly identified. Where required by contract
or regulation, materials or products are labeled to ensure traceability to the original supplier.
Records of identification and traceability are maintained per pre-established retention
periods, or as otherwise required by contract or regulation. Customer supplied property is
identified, verified, stored and maintained for use similar in manner to Vertex Rail
Technologies, LLC purchased property except additionally identified as Customer supplied.
18. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
18 of 22
Lost, damaged or otherwise unsuitable product shall be reported to the customer and
corrective action requested.
7.5. 3.5 Preservation of Product
7.5.3.5.1Policy: Vertex Rail Technologies, LLC has established documents and maintains a
procedure for handling, storage, packaging preservation and delivery of products.
Vertex Rail Technologies, LLC provides material storage areas to prevent damage or
deterioration of product pending use or delivery. Vertex Rail Technologies, LLC has
established and maintains methods for authorizing receipt and the dispatch of product to and
from material storage areas. The conditions of product in inventory shall be assessed at
appropriate intervals in order to detect deterioration when applicable.
Vertex Rail Technologies, LLC controls packing, preservation and marking processes of
materials used that affect quality of product for delivery in order to ensure conformance to
specified customer requirements. Vertex Rail Technologies, LLC identifies preserves and
segregates product from time of receipt until its responsibility ceases. Preservation applies to
constituent parts of a product.
Vertex Rail Technologies, LLC has established and maintains procedures to ensure the
protection of the quality of product after formal inspection and test. Where required by
contract this protection is extended to include delivery to destination.
7.5.4 Responsibility: Manufacturing Manager & Quality Assurance Manager
7.5.5 Reference: Vertex Rail Technologies, LLC SOP 2.16.
7.5.6 Control of Monitoring and Measuring Devices
7.5.6.1 General: Vertex Rail Technologies, LLC shall determine monitoring and measurement
required to produce evidence of conformity of product to customer and regulatory
requirements and monitoring and measuring devices required to achieve required evidence.
This policy applies to the monitoring and inspection devices used to verify the manufacture
or servicing of product produced by Vertex Rail Technologies, LLC. Vertex Rail
Technologies, LLC shall exercise sufficient control over all measurement systems used in the
development, manufacture and servicing of product to provide confidence in decisions or
actions based on measurement data. This control shall be extended over monitoring and
measurement devices.
7.5.3.6.2 Policy: New equipment shall be initially calibrated prior to first use; placed under
automatic periodic recall for adjustment, repair and/or re-calibration; identified as to
calibration status; and protected from unauthorized adjustments and damage. Records of this
19. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
19 of 22
activity will be maintained including methods utilized and traceability to standards of
known accuracy such as the National Institute of standards and Technology (NIST). When
monitoring and measuring devices are found out of calibration, the impact on product and
services performed shall be determined and action may be taken to correct any potential
nonconformance. When used as a monitoring or measurement tool, the effectiveness of
computer software shall be validated prior to use.
7.5.6.3 Responsibility: Quality Assurance Manager
7.5.6.4 Reference: Vertex Rail Technologies, LLC. SOP 2.8
8.0 Measurement, Analysis and Improvement
8.1 General
8.1.1 Purpose: This policy shall ensure that monitoring, measuring, analysis and improvement
processes are planned and implemented throughout the manufacturing cycle at Vertex Rail
Technologies, LLC to effect product acceptability, system conformity, customer satisfaction
and continual improvement.
8.1.2 Scope: This policy applies to all manufactured products produced or serviced by Vertex Rail
Technologies, LLC and all quality systems utilized by Vertex Rail Technologies, LLC during
the manufacturing cycle.
8.1.3 Policy: Vertex Rail Technologies, LLC shall define and implement monitoring, measurement,
analysis and improvement activities as part of the manufacturing quality plan. These
activities shall include the monitoring and measurement of customer satisfaction (compliant
logs, surveys), internal audits (quality system effectiveness), monitoring and measurement of
processes (special testing techniques such as non-destructive testing – visual inspection,
radiography, bore-scope inspection), monitoring and measurement of product (incoming, in
process, and final inspection), and control of nonconforming product. The data collected
using statistical techniques where applicable shall be analyzed to determine the effectiveness
of the quality management system and action to be taken to improve product conformity and
foster continual improvement. Continual improvement shall be implemented in part by
corrective and preventive action.
8.1.4 Responsibility: Quality Assurance Manager, Management Team
8.1.5 Reference: Vertex Rail Technologies, LLC. SOP 2.20
Monitoring and Measurement
8.2.1 Purpose: This policy is to verify extent of customer perception as to Vertex Rail
Technologies, LLC performance acceptability, conducts scheduled internal audits, and
20. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
20 of 22
monitor and measure quality system processes and product realization to verify criteria
against planned results.
8.2.2 Scope: This policy applies to all activities at Vertex Rail Technologies, LLC affecting product
quality and quality system compliance.
8.2.3 Policy: Customer Satisfaction: Vertex Rail Technologies, LLC monitors its customer’s
perception to determine if their requirements have been met by:
(a) Reviewing each customer’s sales orders at a minimum of quarterly to determine quality,
delivery and cost results. This review is documented on the “Customer Satisfaction
Sheet”.
(b) Contacts each customer active minimally semi-annually.
(c) Either verbally or in writing to determine customer’s degree of satisfaction. This semi-
annual review is documented on a “Customer Satisfaction Sheet”.
The results of this review are forwarded to the Management Team for evaluation during the
quarterly management reviews.
8.2.4 Policy: Internal Audits
Vertex Rail Technologies, LLC has established and maintains procedures for conducting
internal quality audits and any follow-up action required. Audits shall be scheduled on the
basis of the status and importance of the activity. Personnel independent of the area being
audited shall conduct audits. Auditors shall received basic training in auditing procedures
and techniques and shall work from an audit plan.
The results of audits shall be documented and brought to the attention of the responsible
personnel in each area audited, and to the executive management of Vertex Rail
Technologies, LLC. Management personnel for each area are responsible for effecting timely
corrective action of audit deficiencies.
Internal quality audits shall be conducted on the entire quality management system at a
minimum of once yearly with critical and any problem areas examined more frequently. To
meet AAR Requirements, the QASE checklist is used to verify complete compliance.
8.2.5 Policy: Monitoring and Measurement of processes and product – During the product
realization process, Vertex Rail Technologies, LLC maintains process control by monitoring
the various processes used: material identification, assembly, welding, polishing, and
finishing by visual and measuring device inspection. Vertex Rail Technologies, LLC
maintains product control with receiving, in process and final inspection. Records of all these
controls are maintained.
21. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
21 of 22
8.2.5.1 AAR Policy: Inspection status is maintained by the use of travelers accompanying the
product and by the use of tags or marking to further identify inspection status.
8.2.5.2 Responsibility: Quality Assurance Manager, Internal Audit Team
8.2.4.4 Reference Documents: Vertex Rail Technologies, LLC. SOP 2.21
Control of Nonconforming Product
8.3.1 Purpose: This policy is to establish a system for the control and disposition of nonconforming
material.
8.3.2 Scope: This policy applies to all products or materials for use in products manufactured /
serviced by Vertex Rail Technologies, LLC.
8.3.3 Procedure: Vertex Rail Technologies, LLC has established and maintains procedures to
ensure that products that do not conform to specified requirements are prevented from e or
delivery. Controls exist that provide for identification, documentation, evaluation,
segregation and when practical, disposition of nonconforming products, and for notification
to the appropriate functional groups. Discovery after delivery is investigated to determine
extent of possible nonconformance.
Personnel review any nonconforming product with authority for disposition and in
accordance with documented procedures. It may be reworked or repaired, used as is, or
scrapped. Where required be contract, the proposed use or repair of a product, which does
not conform to the specified requirements, is reported for evaluation to the customer. The
description of any nonconformity that has been accepted, and of any repairs, is recorded to
denote the actual condition. Repaired and reworked product is re-inspected in accordance
with documented procedures.
8.3.4 AAR Nonconforming Requirements: Non-conformances occurring on product
manufactured IAW AAR requirements shall be processed complying with Chapter 7 of M-
1003 using the forms and procedure outlined.
8.3.5 Responsibility: Quality Assurance Manager,
8.3.6 Reference: Vertex Rail Technologies, LLC SOP 2.18
8.4 Analysis of Data
8.4.1 Purpose: This policy is to provide for the collection of data to determine effectiveness of
quality system and identification of areas for effecting continuous improvement.
22. Vertex Rail Technologies LLC Quality Assurance Manual
QAM 1 Revision B Date of Issue: 04 Aug 2014
22 of 22
8.4.2 Scope: This policy applies to all relevant documentation and data collected during the
performance of the quality management system.
8.4.3 Policy: Vertex Rail Technologies, LLC has a procedure to collect and analyze data produced
by the quality management system established and implemented on a continual basis. The
data is collected and analyzed to provide information concerning customer satisfaction,
product conformity, and opportunities for preventive action, supplier status.
8.4.4 Responsibility: Management Team, Quality Assurance Manager
8.4.5 Reference Documents: Vertex Rail Technologies, LLC SOP 2.20
Improvement
8.5.1 Purpose: This policy is to ensure that a system exists for corrective and preventive action.
8.5.2 Scope: This policy applies to (a) nonconforming products or materials incoming, in process,
or finished that affect quality and (b) unfinished products or materials where potential
problem areas could affect quality.
8.5.3 Policy: Vertex Rail Technologies, LLC has established documents and maintains procedures
for:
(a) Continual improvement: using the data collected by quality policy, quality objectives,
supplier evaluations, internal audits, analysis of data, corrective and preventive action, and
management reviews, the Management Team is committed to proactively pursuing continual
improvement and documenting the results.
(b) Corrective action: investigating the cause of nonconforming product and the corrective action
needed to prevent re-occurrence; applying controls to ensure that corrective actions are taken
in a timely manner and that they are effective; implementing and recording changes in
procedures resulting from corrective actions to internal audit findings; and submittal of
corrective action for management review.
(c) Preventive action: initiating preventive actions to deal with problems to a level corresponding
to the risks encountered; analyzing processes, work operations, concessions, quality records,
corrective actions, and customer complaints to detect potential causes of nonconforming
product; initialing any actions to prevent potential non-conformances from occurring; and
reviewing such actions for effectiveness; and submittal of preventive action for management
review.
8.5.4 Responsibility: Management Team, Quality Assurance Manager
8.5.5 Reference: Vertex Rail Technologies, LLC SOP 2.6