3. RESIDENCE HALLS
Park Manor North
Forest Hall
Putney Hall
Mandell Family Hall
Coleman Hall
Van Winkle Hall
Pietz Hall
McCollough Hall
Canfield Hall
Keith Hall
Bryant Hall
4. PARK MANOR NORTH
Current Fountain:
• Traffic: Medium
• Number of Units: 1
• Fountain Style:
Hydration Station
• Cost: N/A
• Location Notes: In the
basement…next to the
Foc’sle, bathrooms,
common room and
laundry room
Proposed Retrofit
• None (renovated in 2014)
5. FOREST HALL
Current Fountain:
• Traffic: Medium
• Number of Units: 1
• Fountain Style: Wall
Mounted Drinking
Fountain
• Cost:
-Parts…$100
-Labor…$150
-Filter…$100/Year
• Location Notes: 2nd
floor; by the main
stairwell, entrance by
the basketball courts
Proposed Retrofit:
or
6. PUTNEY HALL
Current Fountain:
• Traffic: High
• Number of Units: 1
• Fountain Style: Wall
Mounted Drinking
Fountain
• Cost: TBD
• Location Notes: Near
the main entrance
Proposed Retrofit:
• Uncertain
7. MANDELL FAMILY HALL
Current Fountain:
• Traffic: High
• Number of Units: 1
• Fountain Style: Wall
Mounted Drinking
Fountain
• Cost:
-Parts…$100
-Labor…$150
-Filter…$100/Year
• Location Notes: Near
the main entrance
Proposed Retrofit:
or
8. COLEMAN HALL
Current Fountain:
• Traffic: Low-High
-Basement: low
-First Floor: High
-Second Floor: Medium
-Third Floor: Low
• Number of Units: 4
• Fountain Style: In-Wall
Bubbler Water Fountain
• Cost: TBD
• Location Notes:
adjacent to bathrooms
Proposed Retrofit:
Multiple options
or
In-wall unit
could replace
existing station
or be installed
adjacent to
existing station.
9. VAN WINKLE HALL
Current Fountain:
• Traffic: Medium
• Number of Units: 8
• Fountain Style: In-Wall
Bubbler Water Fountain
• Cost: TBD
• Location Notes: one
water fountain in each
tower (A-1, A-2, A-3,
B-2, B-3, C-1, C-2, C-3)
Proposed Retrofit:
or
10. OTHER RESIDENCE HALLS
Current Fountain:
• No existing fountains in building, often suite
style units.
• Traffic: Low (Bryant/McCollough/Pietz) –
Medium (Canfield, Keith
• Cost:
-$26.99 - $46.99 / Filter (Parts)
- ~$150 Labor
-$29.99 - $36.99 / Filter Replacement
• Location Notes: Canfield, Keith, McCollough
and Pietz Suites; Bryant Kitchens
Proposed Retrofit:
or other under
sink filter
11. NON- RESIDENCE
HALLS BUILDINGS
Trim Dining Hall
Hollister Hall
Reynolds Campus Center
Sorenson Center for the Arts
Gerber Hall
Horn Library
Babson Hall
Tomasso Hall
Luksic Hall/Blank Center
Olin Hall
Malloy Hall/Knight Auditorium
Webster Center
12. TRIM DINING HALL
Current Fountain:
• Traffic: High
• Number of Units: 1
• Fountain Style:
Hydration Station
• Cost: TBD
• Location Notes: 3rd
Floor, near faculty
offices
Proposed Retrofit:
• None
13. HOLLISTER HALL
Current Fountain:
• Traffic: Medium
• Number of Units: 3
(2 each)
• Fountain Style: Bowl
Bubbler
• Cost: TBD
• Location Notes:
-1st Floor, near Health
Center and bathrooms
-2nd Floor, near bathrooms
-3rd Floor, near bathrooms
Proposed Retrofit:
14. REYNOLDS CAMPUS CENTER
Current Fountain:
• Traffic: High
• Number of Units: 2
• Fountain Style:
Hydration Station
• Cost: N/A
• Location Notes: 1st
Floor, near the
bathrooms
Proposed Retrofit:
• None
15. REYNOLDS CAMPUS CENTER
Current Fountain:
• Traffic: Medium
• Number of Units: 2
• Fountain Style:
Hydration Station
• Cost:
-Parts…$100
-Labor…$150
-Filter…$100/Year
• Location Notes: 2nd
Floor, near the
bathrooms and Student
Life Suite
Proposed Retrofit:
or
16. SORENSON CENTER FOR THE ARTS
Current Fountain:
• Traffic: High
• Number of Units: 2
• Fountain Style:
Bowl Bubbler
• Cost:
-Parts…$100
-Labor…$150
-Filter…$100/Year
• Location Notes:
Between the
bathrooms on the first
floor
Proposed Retrofit:
or
17. GERBER HALL
Current Fountain:
• Traffic: Medium
• Number of Units: 2
• Fountain Style: In-Wall
Bubbler Water Fountain
• Cost:
-Parts…$100
-Labor…$150
-Filter…$100/Year
• Location Notes:
-1st Floor, near the men’s
bathroom and classrooms
-3rd Floor, near the
women’s bathroom and
classrooms
Proposed Retrofit:
or
18. HORN LIBRARY
Current Fountain:
• Traffic: High
• Number of Units: 1
• Fountain Style:
Hydration Station
• Cost: N/A
• Location Notes: 1st
Floor, near the
bathrooms
Proposed Retrofit:
• None
19. HORN LIBRARY
Current Fountain:
• Traffic: Low
• Number of Units: 1
• Fountain Style: Bowl
Bubbler
• Cost:
-Parts…$100
-Labor…$150
-Filter…$100/Year
• Location Notes: 2nd
Floor, near the IT
Department
Proposed Retrofit:
or
20. HORN LIBRARY
Current Fountain:
• Traffic: Medium
• Number of Units: 1
• Fountain Style: Wall
Mounted Drinking
Fountain
• Cost:
-Parts…$100
-Labor…$150
-Filter…$100/Year
• Location Notes: 2nd
Floor, near the
bathrooms
Proposed Retrofit:
or
21. HORN LIBRARY
Current Fountain:
• Traffic: Medium
• Number of Units: 1
• Fountain Style:
Wall Mounted Drinking
Fountain
• Cost:
-Parts…$100
-Labor…$150
-Filter…$100/Year
• Location Notes: 3rd
Floor, near faculty
offices
Proposed Retrofit:
or
22. BABSON HALL
Current Fountain:
• Traffic: Low-Medium
• Number of Units: 2
• Fountain Style: In-Wall
Bubbler Water Fountain
• Cost:
-Parts…$100
-Labor…$150
-Filter…$100/Year
• Location Notes:
-1st Floor, near the Writing
Center
-2nd Floor, near the
entrance
Proposed Retrofit:
or
23. TOMASSO HALL
Current Fountain:
• Traffic: Medium
• Number of Units: 1
• Fountain Style: Wall
Mounted Drinking
Fountain
• Cost:
-Parts…$100
-Labor…$150
-Filter…$100/Year
• Location Notes: Bottom
Floor, near the staircase
and vending machine
Proposed Retrofit:
or
24. TOMASSO HALL
Current Fountain:
• Traffic: High
• Number of Units: 1
• Fountain Style:
Hydration Station
• Cost: N/A
• Location Notes: Main
Floor, nearest Park
Manor West Entrance
Proposed Retrofit:
• None
25. LUKSIC HALL / ARTHUR M. BLANK CENTER
Current Fountain:
• Traffic: Low-Medium
• Number of Units: 4
(2 each)
• Fountain Style: Bowl
Bubbler
• Cost: TBD
• Location Notes:
-Luksic: 1st Floor, near the restrooms and staircase
-2nd Floor, near the exit of the staircase
-3rd Floor, near the exit of the staircase
-Blank Center: 1st Floor, hidden in the back of
several faculty offices
Proposed Retrofit:
or
26. OLIN HALL
Current Fountain:
• Traffic: High
• Number of Units: 2
• Fountain Style:
Hydration Station
• Cost: TBD
• Location Notes: Bottom
Floor, near Olin Café
and restrooms
Proposed Retrofit:
• None
27. OLIN HALL
Current Fountain:
• Traffic: High
• Number of Units: 2
• Fountain Style: Bowl
Bubbler
• Cost: TBD
• Location Notes: 1st
Floor, near the main
entrance and
bathrooms
Proposed Retrofit:
or
28. OLIN HALL
Current Fountain:
• Traffic: Medium
• Number of Units: 2
• Fountain Style:
Hydration Station
• Cost: TBD
• Location Notes: 2nd
Floor, near several
classrooms
Proposed Retrofit:
• None
29. OLIN HALL
Current Fountain:
• Traffic: Low
• Number of Units: 2
• Fountain Style: Bowl
Bubbler
• Cost: TBD
• Location Notes: 3rd
Floor, near several
classrooms
Proposed Retrofit:
or
30. MALLOY HALL / KNIGHT AUDITORIUM
Current Fountain:
• Traffic: Medium
• Number of Units: 1
• Fountain Style: Wall
Mounted Drinking
Fountain
• Cost:
-Parts…$100
-Labor…$150
-Filter…$100/Year
• Location Notes: near
side entrance and
vending machine in
Malloy Hall
Proposed Retrofit:
or
31. WEBSTER CENTER
Current Fountain:
• Traffic: Very High
• Number of Units: 1
• Fountain Style:
Hydration Station
• Cost: TBD
• Location Notes: 1st
Floor, near the main
entrance and
squash/racquetball
courts
Proposed Retrofit:
• None
32. WEBSTER CENTER
Current Fountain:
• Traffic: High
• Number of Units: 1
• Fountain Style: Wall
Mounted Drinking
Fountain
• Cost: TBD
• Location Notes:
-1st Floor, outside the
Lunder Fitness Center
-2nd Floor, next to the track
and cardio machines
Proposed Retrofit:
33. BUILDINGS CURRENTLY WITHOUT
WATER BOTTLE FILLING STATIONS
Trim Dining Hall
Hollister Hall
Reynolds Campus Center
Sorenson Center for the Arts
Gerber Hall
Horn Library
Babson Hall
Tomasso Hall
Luksic Hall/Blank Center
Olin Hall
Malloy Hall/Knight Auditorium
Webster Center