Implement “V” model of System Engineering for Intelligent Transportation Systems (ITS) endorsed by the U.S. DOT Federal Highway Administration Industry best practice for implementing ITS Systems and when integrating multiple disparate systems such as tolling, fiber optics, back office, transportation, ITS, etc.
.

Published in: Technology, Business
  • Be the first to comment

  • Be the first to like this

The system engineering process used in Tolling greenfield project

  1. 1. Use of system engineering in large scale transportation technology integration project Brad Ring Keywords: blade servers, A/C data center solution, ITS, back office, best practices, program management, strategic planning, IT infrastructure and fiber optic conduit integrity Technology leadership, System engineering, Transportation, tolling, ITS, intelligent transportation system, fiber optic cable, system integration, design review, requirements review, cap ex, op ex, testing, review, schedule, scalability, maintainability.Article extract:Implement “V” model of System Engineering for Intelligent TransportationSystems (ITS) endorsed by the U.S. DOT Federal Highway AdministrationIndustry best practice for implementing ITS Systems and when integratingmultiple disparate systems such as tolling, fiber optics, backoffice, transportation, ITS, etc.. 1
  2. 2. Methodology Train necessary staff at beginning of project to implement the system engineering process from day 1. 2
  3. 3. Recommended process U.S. DOT Federal Highway Administration Industry best practice for implementing ITS Systems 3
  4. 4. Benefits of independent technical reviewer 1. Integrated Master Schedule integrates 4 different schedules 2. tracks critical path to ensure we meet planned service commencement date. 3. Implemented Mandrel Test to improve fiber installation. 4. Reviews and approves all system engineering deliverables. 4
  5. 5. Participating stakeholders Brad Ring Multiple system integrators For more information contact: bradr998@yahoo.com 5

×