Best practices for independent verification and       validation (IV&V) and risk management                       Brad Rin...
Methodology Independent review of System Engineering Deliverables. Integrated Master Schedule incorporating schedules. ...
Recommended process                      3
Benefits of independent technical reviewer 1. Integrated Master Schedule integrates 4 different  schedules 2. tracks cri...
Participating stakeholders Brad Ring Multiple system integrators For more information contact: bradr998@yahoo.com      ...
Upcoming SlideShare
Loading in …5
×

Best practices for independent verification and validation iv&v

1,516 views

Published on

Establish IV&V vendor at the initial point of project inception when managing large scale technology integration projects.

Published in: Technology, Business
  • Be the first to comment

  • Be the first to like this

Best practices for independent verification and validation iv&v

  1. 1. Best practices for independent verification and validation (IV&V) and risk management Brad Ring Keywords: blade servers, A/C data center solution, best practices, program management, strategic planning, IT infrastructure and fiber optic conduit integrity Technology leadership, System engineering, Transportation, tolling, ITS, intelligent transportation system, fiber optic cable, system integration, design review, requirements review, cap ex, op ex, testing, review, schedule, scalability, maintainability.Article extract: Establish IV&V vendor at the initial point of project inception. 1
  2. 2. Methodology Independent review of System Engineering Deliverables. Integrated Master Schedule incorporating schedules. Ongoing schedule risk analysis and reporting. Perform On-site inspections. 2
  3. 3. Recommended process 3
  4. 4. Benefits of independent technical reviewer 1. Integrated Master Schedule integrates 4 different schedules 2. tracks critical path to ensure we meet planned SCD. 3. Implemented Mandrel Test to improve fiber installation. 4. Reviews and approves all system engineering deliverables. 4
  5. 5. Participating stakeholders Brad Ring Multiple system integrators For more information contact: bradr998@yahoo.com 5

×