Bowen, with the Muncie Sanitary District, presented this overview of a CSO Separation project, delivered through an alternative procurement methodology in 2015.

Published in: Engineering
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
895
On SlideShare
0
From Embeds
0
Number of Embeds
544
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Bowen Presentation to 2015 ACEC Conference

  1. 1. • ABOUT MUNCIE AND THE MUNCIE SANITARY DISTRICT (MSD) • PROJECT OVERVIEW: Muncie Storm Water Conveyance Project • AREAS OF RISK FOR THE Owner, Engineer & Contractor • RISKS Avoided & SAVINGS UTILIZATION • Guaranteed Savings Contract (GSC) Code • CONSTRUCTION PHOTOS & POSITIVE PROJECT OUTCOMES • Future of Underground GSCs in Indiana
  2. 2. www.munciesanitary.org
  3. 3. Installation of piping and structures to convey stormwater from the ARC Hotel & Parking Structure, at Victor Street and continue along High Street / Franklin Street to Gilbert Street where it discharges into the White River. Project also furthers compliance with IDEM-mandated CSO Separation.
  4. 4. Lorem ipsum dolor sit amet, consecte tuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Lorem ipsum dolor sit amet, consecte tuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Lorem ipsum dolor sit amet, consecte tuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Lorem ipsum dolor sit amet, consecte tuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Lorem ipsum dolor sit amet, consecte tuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa.
  5. 5. SS on Franklin, Sw Ps FM Outfall on Adams, Additional BMP Canal Features, Levee Piping Upgrades, CSO 001/004 Additional Neighborhood Features,CSO 028 Separation on SR-32
  6. 6. s
  7. 7. LUMP SUM PRICE CHANGE ORDERS LOW BID CONTRACTOR LOW BID SUBCONTRACTORS LIQUIDATED DAMAGES 60-DAY BID FIXED SCOPE NO CONSTRUCTION SAVINGS SRF ENGINEER WORKS FOR OWNER GMP (OPEN BOOK PRICING) NO CHANGE ORDERS GUARANTEED BOWEN QUALITY PREFERRED SUBCONTRACTORS (LOCAL) LIQUIDATED DAMAGES SELECTION COMPLETED FIXED SCOPE + WISH LIST ITEMS CONSTRUCTION SAVINGS COMPLIMENTS SRF (8 + GPR) ENGINEER CAN WORK FOR OWNER
  8. 8. ‣Scope ‣Standards ‣Financing ‣Completion Date ‣Function ‣Project Schedule ‣Production ‣Value Engineering ‣Quality Control ‣Safety ‣Permitting ‣Design Concept ‣Eng. Cost Control ‣Project Function ‣Eng. Schedule
  9. 9. West Lafayette-$2,115,000 Lafayette-$4,600,000 Lafayette-$950,000 Lafayette-$898,000 Lafayette-$2,515,000 Lafayette-$9,380,000 Lafayette-$7,040,000 Lafayette-$2,190,000 Lafayette-$12,653,000 Lafayette-$4,637,000 Lebanon-$1,770,000 Lebanon-$1,240,000 Plainfield-$7,290,000 Plainfield-$4,260,000 Plainfield-$3,700,000 Plainfield-$472,000 Plainfield-$390,000 Plainfield-$3,980,000 Plainfield-$1,351,500 Plainfield-$4,376,000 Plainfield-$4,123,350 Brazil-$790,000 Hobart-$266,000 Valparaiso-$606,950 Valparaiso-$2,135,007 Valparaiso-$14,532,000 Bremen-$2,086,000 Goshen-$3,300,000 Butler-$687,000 Butler-$950,635 Butler-$1,098,646 Butler-$1,403,000 Garrett-$3,390,000 Huntington-$10,370,000 Winchester-$490,000 Battle Ground-$2,790,000 Russiaville-$826,000 Tipton-$5,539,000 Yorktown-$1,277,000 Muncie-$10,587,000 Muncie-$1,700,000 Westfield-$3,900,000 Fishers-$1,960,000 Fishers-$1,244,000 Greenfield-$700,000 Columbus-$2,600,000 Bloomington-$1,512,000

×