Bowen, with the Muncie Sanitary District, presented this overview of a CSO Separation project, delivered through an alternative procurement methodology in 2015.
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
Bowen Presentation to 2015 ACEC Conference
1.
2. • ABOUT MUNCIE AND THE MUNCIE SANITARY DISTRICT (MSD)
• PROJECT OVERVIEW: Muncie Storm Water Conveyance Project
• AREAS OF RISK FOR THE Owner, Engineer & Contractor
• RISKS Avoided & SAVINGS UTILIZATION
• Guaranteed Savings Contract (GSC) Code
• CONSTRUCTION PHOTOS & POSITIVE PROJECT OUTCOMES
• Future of Underground GSCs in Indiana
6. Installation of piping and structures to convey stormwater from the ARC Hotel & Parking Structure, at Victor Street and
continue along High Street / Franklin Street to Gilbert Street where it discharges into the White River.
Project also furthers compliance with IDEM-mandated CSO Separation.
7. Lorem ipsum
dolor sit amet,
consecte tuer
adipiscing elit.
Aenean commodo
ligula eget dolor.
Aenean massa.
Lorem ipsum
dolor sit amet,
consecte tuer
adipiscing elit.
Aenean commodo
ligula eget dolor.
Aenean massa.
Lorem ipsum
dolor sit amet,
consecte tuer
adipiscing elit.
Aenean commodo
ligula eget dolor.
Aenean massa.
Lorem ipsum
dolor sit amet,
consecte tuer
adipiscing elit.
Aenean commodo
ligula eget dolor.
Aenean massa.
Lorem ipsum
dolor sit amet,
consecte tuer
adipiscing elit.
Aenean commodo
ligula eget dolor.
Aenean massa.
8.
9.
10.
11.
12.
13.
14.
15.
16. SS on Franklin, Sw Ps FM Outfall on Adams, Additional BMP
Canal Features, Levee Piping Upgrades, CSO 001/004 Additional
Neighborhood Features,CSO 028 Separation on SR-32