“Port facilities, supporting every stage of floating wind development”

Published in: Environment
  • Be the first to comment

  • Be the first to like this

FWP 2017 l Mathieu MONNIER, FEE

  1. 1. PORT FACILITIES, SUPPORTING EVERY STAGE OF FLOATING WIND DEVELOPMENT – CHAIRED BY
  2. 2. #FWPAtlan*c FOW: STATE OF THE ART AND PERSPECTIVES IN FRANCE France as the hotspot of FOW
  3. 3. 3 FEE – THE FRENCH WIND ENERGY ASSOCIATION Created in 1996, France Energie Eolienne (FEE) supports and represents the wind energy sector (both onshore & offshore) in France. Missions ü  FEE represents the wind industry at public, na9onal, European and regional authori9es and regula9ng bodies, ü  The associa9on ac9vely par*cipates in the crea*on of legisla*ve and regulatory texts, ü  It supports its members and facilitates their development in France. The associa9on promotes the interests of the associa*on members and organises networking events as the annual na*onal summit: “colloque na9onal éolien” (around 1000 par9cipants in September 2016). •  326 members (October 2017): they built more than 90% of the installed wind turbines in France and operate 85% of them. •  www.fee.asso.fr @feeasso
  4. 4. 4 THE HUGE POTENTIAL OF FOW
  5. 5. 5 THE STRUCTURING OF AN INNOVATIVE INDUSTRY § 96 MW of FOW pilot farms in France : 4 x 24 MW, the worldwide biggest investment for the sector; § The basis of the boSom fixed projects: manufacturing sites, supply chain, R&D, educa9on; EMR test sites; etc.; § The REX of the 1st demonstrators in Europe; § The installa9on and future commissioning of Floatgen; § The ports and infrastructures investments…
  6. 6. 6 THE NECESSITY OF AN AMBITIOUS PLANNING § The actual energy plan « PPE »: 0,2 to 2 GW of addi9onal capacity for MRE (FOW, 9dal wave) awarded by 2023; § Our ambi*on: 6 GW of FOW commissioned by 2030 with several tenders; § The PPE needs to be precise (no shared volumes with other MRE any more) and ambi*ous à a requirement for every infrastructure / industry investment (especially the ports); § The industry is ready to deliver; § Our objec*ve: a 1st commercial tender launched in 2018 & awarded in 2019 (BriSany and the Mediterranean Sea can welcome such projects).

×