The	port	infrastructures,		
partners	in	all	the	phases	of	
development	of	floa6ng	wind	power.		
What	is	the	Port	strategy?
2
PRESENT	THROUGHOUT	THE	MRE	VALUE	CHAIN	
2017	FWP	ATLANTIC	FORUM,	SAINT	NAZAIRE	&	LORIENT	
80 M€ OF INVESTMENTS AT 3 COMP...
3
SAINT	NAZAIRE:	A	LOGISTICS	HUB	PROJECT
	
2017	FWP	ATLANTIC	FORUM,	SAINT	NAZAIRE	&	LORIENT	
  12 ha devoted to offshore w...
4
SAINT	NAZAIRE:	CONCRETE	RESULTS
	
2017	FWP	ATLANTIC	FORUM,	SAINT	NAZAIRE	&	LORIENT	
 Loading of MRE cargo
consignments a...
5
THE		PLATFORM	OF	MONTOIR	DE	BRETAGNE	
2017	FWP	ATLANTIC	FORUM,	SAINT	NAZAIRE	&	LORIENT	
LAUNCH OF THE INDUSTRIAL
HUB
  G...
6
LE	CARNET,	INDUSTRIAL	AND	PORT	FACILITY	
2017	FWP	ATLANTIC	FORUM,	SAINT	NAZAIRE	&	LORIENT	
 110 ha available for develop...
7
	
2017	FWP	ATLANTIC	FORUM,	SAINT	NAZAIRE	&	LORIENT
Upcoming SlideShare
Loading in …5
×

FWP 2017 l Jean-Baptiste GOÜIN, Port of Saint-Nazaire

50 views

Published on

FWP 2017 l Jean-Baptiste GOÜIN, Port of Saint-Nazaire
“Port facilities, supporting every stage of floating wind development”

Published in: Environment
  • Be the first to comment

  • Be the first to like this

FWP 2017 l Jean-Baptiste GOÜIN, Port of Saint-Nazaire

  1. 1. The port infrastructures, partners in all the phases of development of floa6ng wind power. What is the Port strategy?
  2. 2. 2 PRESENT THROUGHOUT THE MRE VALUE CHAIN 2017 FWP ATLANTIC FORUM, SAINT NAZAIRE & LORIENT 80 M€ OF INVESTMENTS AT 3 COMPLEMENTARY PORT FACILITIES
  3. 3. 3 SAINT NAZAIRE: A LOGISTICS HUB PROJECT 2017 FWP ATLANTIC FORUM, SAINT NAZAIRE & LORIENT   12 ha devoted to offshore wind power, for the storage and assembly of nacelles, masts and blades   3 reinforced quays   1 dry dock catering for jack-up vessels
  4. 4. 4 SAINT NAZAIRE: CONCRETE RESULTS 2017 FWP ATLANTIC FORUM, SAINT NAZAIRE & LORIENT  Loading of MRE cargo consignments at Quai des Charbonniers  5 turbines for the Block Island wind farm in the USA loaded using the Joubert dry dock in 2016  Loading and assembly of the first Floatgen floating wind turbine in the Penhoet basin
  5. 5. 5 THE PLATFORM OF MONTOIR DE BRETAGNE 2017 FWP ATLANTIC FORUM, SAINT NAZAIRE & LORIENT LAUNCH OF THE INDUSTRIAL HUB   General Electric plants on a 14-ha site   Delivery of 350 m of reinforced quay by the end of 2017   30 ha being developed   Complementarity with the container terminal RO-RO TERMINAL
  6. 6. 6 LE CARNET, INDUSTRIAL AND PORT FACILITY 2017 FWP ATLANTIC FORUM, SAINT NAZAIRE & LORIENT  110 ha available for development on a 390-ha site  Activity zone to be launched from 2018 Haliade 150 prototype (2012)
  7. 7. 7 2017 FWP ATLANTIC FORUM, SAINT NAZAIRE & LORIENT

×