ON THE SAME PAGE Sye presentation 2014

  1. ON THE SAME PAGE Liz LeBlanc, Simon Søgnen Tveit, Line T. Bogen, Rickard Jensen 8 December 2014 Sykehjemsetaten Oslo Kommune Systems Oriented Design Fall 2014 A project in partnership with:
  2. ON THE SAME PAGE // Final Presentation 8.12.14 INTRODUCTION SHORT & LONG TERM MITT HJEM HELSE HUS
  3. ON THE SAME PAGE // Final Presentation 8.12.14 MOVING VIDEO
  4. ON THE SAME PAGE // Final Presentation 8.12.14 PROJECT LANDSCAPE NORD BYDEL HELSEHUS MITT HJEM HJEMMETJENESTE SENTRUM VEST SØR BESTILLERKONTORET
  5. ON THE SAME PAGE // Final Presentation 8.12.14 FINAL COMMUNICATION TOOL
  6. ON THE SAME PAGE // Final Presentation 8.12.14 FIRST CHAT WITH SYE
  7. ON THE SAME PAGE // Final Presentation 8.12.14 RUNNING INTO THE WOODS Bjørn AHUS Marit Alna Bestillerkontoret Teresa Solvang Honey Fee Lilleborg Bente Grorud Hjemmetjeneste
  8. ON THE SAME PAGE // Final Presentation 8.12.14 MAIN TAKE AWAYS Effects of Reform Lack of Communication Nothing is standard
  9. ON THE SAME PAGE // Final Presentation 8.12.14 MAIN TAKE AWAYS Effects of Reform Lack of Communication Nothing is standard
  10. ON THE SAME PAGE // Final Presentation 8.12.14 MAIN TAKE AWAYS Effects of Reform Lack of Communication Nothing is standard
  11. ON THE SAME PAGE // Final Presentation 8.12.14 FIRST BIG MAP
  12. ON THE SAME PAGE // Final Presentation 8.12.14 FOUR DESIGN DIRECTIONS Keeping people at home Dynamics within the Helsehus Evaluation Process Organizational Structure impact radius ripple effect
  13. ON THE SAME PAGE // Final Presentation 8.12.14 FOUR DESIGN DIRECTIONS Keeping people at home Dynamics within the Helsehus Evaluation Process Organizational Structure medium medium
  14. ON THE SAME PAGE // Final Presentation 8.12.14 FOUR DESIGN DIRECTIONS Keeping people at home Dynamics within the Helsehus Evaluation Process Organizational Structure small high
  15. ON THE SAME PAGE // Final Presentation 8.12.14 FOUR DESIGN DIRECTIONS Keeping people at home Dynamics within the Helsehus Evaluation Process Organizational Structure high high
  16. ON THE SAME PAGE // Final Presentation 8.12.14 FOUR DESIGN DIRECTIONS Keeping people at home Dynamics within the Helsehus Evaluation Process Organizational Structure high high
  17. ON THE SAME PAGE // Final Presentation 8.12.14 THE INSIGHTS BOOK
  18. ON THE SAME PAGE // Final Presentation 8.12.14 WHAT ABOUT NOW? SEPTEMBER OCTOBER NOVEMBER DECEMBER SATURDAY SUNDAY MONDAY TUESDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY SUNDAYMONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY | |Systems Oriented Design (SOD) |Autumn 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Milestone presentations AHO WORKS EXHIBITION 09:00 - 16:00 Big & Small Auditorium Final Presentations. Invite your project partners. Exhibition is part of the evaluation. (price for best exhibition) 09:00 - 16:00 Big & Small Auditorium Exhibition space presentation. Exhibition is part of the evaluation. (price for best exhibition) Exhibition Setup Exhibition Setup WEDNESDAY THURSDAY FRIDAY MONDAY TUESDAYMONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY SUNDAYMONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY 09:00 - 16:00 Group Room 4&5 Elevator Pitch. Implementation. 3 posters. (Pecha Kucha Format - 20 slides and 20 seconds each slide) 09:00 - 16:00 Tegnesal 9 Rich Design Space and 3 elevator pitch posters. 09:00 - 16:00 Reverse Archaeology Presentation. The future systems landscape. 09:00 - 16:00 Tegnesal 9 giga map presentations of future systems. Proposed Day Stakeholder Workshop Making DeliverablesConcept DevelopmentInsight Work Testing & Iterations WEDNESDAY THURSDAY Decision Day: Narrow Down Scope Decision Day: Individual Problems Defined Decision Day: Final Deliverables Determined 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  19. ON THE SAME PAGE // Final Presentation 8.12.14 BLENDING THEIR HOMEMADE SYSTEM AND OUR EXPERTISE
  20. ON THE SAME PAGE // Final Presentation 8.12.14 MAKING SENSE OF IT ALL
  21. ON THE SAME PAGE // Final Presentation 8.12.14 September October November December January 2015 2016 February March April May June July August September October November December January October 2015 27 1714 9 22 Hoveseter Smestad Sofienberg 7 5 Romsås Grunerløkka 3221 6 917 17 5 16 17 Majorstua Kingosgate 28 Rødtvet Ammerud 2023 FurusetMadserudLambertseter Lillohjemmet Akerselva 17 Akerselva Vålerenga 29 927 26 10 19 20178 8 13961513 Moving Patients & Staff Between Nursing Homes HOW TO READ THIS MAP The top portion also shows staff that will need to move in order to fill the needs of the new patient population. The bottom portion shows the different type of patients that will be relocated. This lower portion is based on a time line over the next 14 months. For example: Akerselva, a newly long term facility is moving 17 regular short term patients spaces to Lilleborg, a new short term home, or Helse Hus. They are also receiving 8, regular long term places in return. Akerselva will send 14.26 FTEs to Lilleborg to assist with this new patient population. Akerselva will receive 8 FTEs from Lillohjemmet because they cannot send patients to Tåsen, because it is privately held. MAP LEGEND POINTS OF INTEREST Lambertseter MovingStaffMovingPatients Langerud Abildsø Furuset Ammerud Rødtvet Romsås Madserud Smestad Majorstua Lillohjemmet Vålerenga Sofienberg Kingosgate Grunerløkka Akerselva 41 28 33 51.6 1.75 13 14 3.9 14.26 7 24.26 7 44.66 24 6.4 9 8 Lillohjemmet 8 RYEN SOLVANG TÅSEN LILLEBORG LILLEBORG Akerselva 14.26 Short Term Patients Long Term Patients Facilities Staff Ordinary RehabRus Ordinary Intensive Care Unspecified Specialty UDI Direction of the move: Origin Destination Number of Patients or FTEs 17 Public Long Term Home Private Long Term Home PRIVATE SHORT TERM PUBLIC SHORT TERM A A B BB A Romsås is becoming private and the Oslo Kommune wants to keep substance abuse treatment competences within the public sector. This means that the employees with this special training must also move into Ryen before the privatization is finalized. B Tåsen is private so employees will have to find a new place to work after the short term patients leave. They will have to move into a different quadrant of the city to find work at a short term facility, as there is only one health house for each. D C C C C C C These matches may seem equal, but remember that short term and long term patients require very different needs. Between Grunerløkka and Lilleborg they switch the correct amount of FTEs to match the patient move. The other four are between public and private homes, which makes it difficult to move staff. D While the moves have individual deadlines over the next 14 months, the patients and employees could be moved at any time before their date. The markers here are spread out in the month prior to their deadline. For instance, a move that should happen before June 1 2015 looks like it will take place in May 2015. E E FTEs may look easy to trade back and forth, but this does not yet take into account the different competence such as rehabilitation, physical or ergo therapies, nurses, or non-medical staff. Note: There are some exceptions to this moving system. Some patients are moving between long term facilities due to special medical needs. These are not listed on this version but will be added later on in the project. This map reflects the knowledge we have as of October 14, 2014 and is subject to change. FIRST VERSION OF THE MAP September October November December January 2015 2016 February March April May June July August September October November December January October 2015 27 1714 9 22 Hoveseter Smestad Sofienberg 7 5 Romsås Grunerløkka 3221 6 917 17 5 16 17 Majorstua Kingosgate 28 Rødtvet Ammerud 2023 FurusetMadserudLambertseter Lillohjemmet Akerselva 17 Akerselva Vålerenga 29 927 26 10 19 20178 8 13961513 Moving Patients & Staff Between Nursing Homes HOW TO READ THIS MAP The top portion also shows staff that will need to move in order to fill the needs of the new patient population. The bottom portion shows the different type of patients that will be relocated. This lower portion is based on a time line over the next 14 months. For example: Akerselva, a newly long term facility is moving 17 regular short term patients spaces to Lilleborg, a new short term home, or Helse Hus. They are also receiving 8, regular long term places in return. Akerselva will send 14.26 FTEs to Lilleborg to assist with this new patient population. Akerselva will receive 8 FTEs from Lillohjemmet because they cannot send patients to Tåsen, because it is privately held. MAP LEGEND POINTS OF INTEREST Lambertseter MovingStaffMovingPatients Langerud Abildsø Furuset Ammerud Rødtvet Romsås Madserud Smestad Majorstua Lillohjemmet Vålerenga Sofienberg Kingosgate Grunerløkka Akerselva 41 28 33 51.6 1.75 13 14 3.9 14.26 7 24.26 7 44.66 24 6.4 9 8 Lillohjemmet 8 RYEN SOLVANG TÅSEN LILLEBORG LILLEBORG Akerselva 14.26 Short Term Patients Long Term Patients Facilities Staff Ordinary RehabRus Ordinary Intensive Care Unspecified Specialty UDI Direction of the move: Origin Destination Number of Patients or FTEs 17 Public Long Term Home Private Long Term Home PRIVATE SHORT TERM PUBLIC SHORT TERM A A B BB A Romsås is becoming private and the Oslo Kommune wants to keep substance abuse treatment competences within the public sector. This means that the employees with this special training must also move into Ryen before the privatization is finalized. B Tåsen is private so employees will have to find a new place to work after the short term patients leave. They will have to move into a different quadrant of the city to find work at a short term facility, as there is only one health house for each. D C C C C C C These matches may seem equal, but remember that short term and long term patients require very different needs. Between Grunerløkka and Lilleborg they switch the correct amount of FTEs to match the patient move. The other four are between public and private homes, which makes it difficult to move staff. D While the moves have individual deadlines over the next 14 months, the patients and employees could be moved at any time before their date. The markers here are spread out in the month prior to their deadline. For instance, a move that should happen before June 1 2015 looks like it will take place in May 2015. E E FTEs may look easy to trade back and forth, but this does not yet take into account the different competence such as rehabilitation, physical or ergo therapies, nurses, or non-medical staff. Note: There are some exceptions to this moving system. Some patients are moving between long term facilities due to special medical needs. These are not listed on this version but will be added later on in the project. This map reflects the knowledge we have as of October 14, 2014 and is subject to change.
  22. ON THE SAME PAGE // Final Presentation 8.12.14 PUT YOUR FINGER ON IT
  23. ON THE SAME PAGE // Final Presentation 8.12.14 WE REALIZED WE WERE LOOKING TOO FAR AHEAD.
  24. ON THE SAME PAGE // Final Presentation 8.12.14 PUT YOUR FINGER ON IT
  25. ON THE SAME PAGE // Final Presentation 8.12.14 THE TOOL 1.0
  26. ON THE SAME PAGE // Final Presentation 8.12.14 ITERATE & IMPROVE
  27. ON THE SAME PAGE // Final Presentation 8.12.14 ADDING STRUCTURE Post2 Korttid1 RUS Post4 Post5 Bydel Østensjø Post4 Bydel Østensjo Post3 Bydel Nordstrand og RUS Post2 avd 4 Bydel Østensjø og Søndre Nordstrand Post1 Bydel Nordstrand September October November November December January 2015 2016 February March April May June July August September October November December January Establishing RYEN helsehus HOW TO READ THIS MAP The middle portion is illustrating how Ryen helsehus will arragne their patiens during the move. On the left and right side you will find the actors involved in the relocation. The timeline on the bottom shows the tentative schedule. HOW TO READ THE TIMELINE The timeline keeps track on important dates regarding the different movingprocesses. MAP LEGEND POINTS OF INTEREST Short Term Patients Long Term Patients Facilities Staff Ordinary RehabRus Ordinary Intensive Care Unspecified Specialty UDI Direction of the move: Origin Destination Number of Patients or FTEs 17 Public Long Term Home Private Long Term Home PRIVATE SHORT TERM PUBLIC SHORT TERM A A C One department moving from Abildsø to Ryen. Dpt. 5 at Ryen can only house 26 patients. 3 groups will fit in at dpt. 5. One group of 8 patients from abildsø will move in to dpt. 2. Staff will follow patients. B Abildsø is getting 6 intensive care patients from Tåsen. Tåsen iss is run by private - employees will not follow. Abildsø might need some physical adjustments to their interiour plans before they can take in the patients from tåsen. The possebility of encreasing the number from 6 to 8 int. care patients is being explored. This may cause less rebuilding at Abildsø as they may arrange their parients differently. BUT this means economic impact! C Internal relocation at Ryen. Patients from borough Nordstrand are moved from post 3 to post 1, to make room for the dpt. for RUS. Post 3 is the most suitble location for the RUS dpt. due to interiour solutions, being separated from other patientgroups, facilities as smokingroom and so on. D D Lambertseter - Ryen move should happen before the the daily operations of Lamberseter nursing home is taken over by private business Lambertseter Abildsø Langerud Romsås A 26 16 16 7 7 23 16 26 6 8 13 12.1111.1110.11 A3 move to A1 CLEAN and make ready for RUS to move in to A3 Clear out A1 - CLEAN RUS moving IN to A3 Ryen B RYEN 30LT BESKRIVE ANSATTE I PROTOKOLL ansatte med turnus overflyttes Abilds post 2 gr 4 5.46 årsverk renregna - ikke reel etter prinsipp om gruppeflytt HR systemet GAT: Hvem + f.nr. stilling stillingsprosent vedlegg er oversikt over ansatte. 3 gr ansatte flytter med turnus hjelpeturnus?? midlertidig“overlapp” Birgit: kan ikke bare flytteog endra arb tid. beholde turus - varsling - dag/kveld Varsel for endring. si opp turnus etter regler+lage ny. 2uker varsel. finregnet: 20.28 årsverk til post 2 gr 1,2,3 20.70 årsverk med turnus ink leder flytte avdeling ikke finregne på årsverk telle eksisterende årsverk - justere etterhvert! minus leger fysio ergo renhold Hjelpeturnus for 3 + 1 gruppe. Wenche og Birgit setter opp for Ryen Bygg endring Abildsø: penger hvem hva - SKJERMA: armerte glassvegger hindre hopp. doku stasjoner. ulåst hus - trenger gjerde HelgeMorten, Sølvi, Bente prioritet!! Steinar fransen på befaring FORSTERKET: en gruppe i uka - skjermet gr. 1,2,3,4. ALT fra post 2 Abildsø. prosjektgrupper som håndterer flytt. sammen med Nina - Formidl. 17. nov ferdig til 14 .desember varsle bydel østensjo søndre nordstrand KONTAKTPERSONER OPPRETTE/AVSLUTTE senger i gerica; Nina TRANSPORT: Ansvar?? - institusjonene. Prosjektleder kan hjelpe til - ABILDSØ sjekker og informerer. Tar ansvar for dette. noen trenger ambulanse kjørekontor: foresp bidrag logistikkplan pasienttransport Flyttelass - ting og tang priv - sykehjem sjekker pårørende hjelp LT har til og med stooore sofaer!! Korttid 1 Abilds 16 spydspiss ansatte: 0,78x16 - 12,48 årsverk (xxx realitet) Hele pakka flytter. uten legel. ikke hjelpeturnus Avd 4 post 2 Ryen 8 ord. somatisk langtid ansatte: uten leder. Abildsø må lage hjelpeturnus. Abildsø ønsker en 100% vakant hjelpestilling på skjerma. Om ryen kan legge til rette for dette:) Flytt i samme periode - tentativt
  28. ON THE SAME PAGE // Final Presentation 8.12.14 FINAL COMMUNICATION TOOL
  29. ON THE SAME PAGE // Final Presentation 8.12.14 MAP TEMPLATE
  30. ON THE SAME PAGE // Final Presentation 8.12.14 HOW IT IS USED email meeting update email repeat
  31. ON THE SAME PAGE // Final Presentation 8.12.14 IMMEDIATE IMPACT Everyone working on their own papers Coming late to the meeting Talking past each other Communicating to other employees BEFORE AFTER
  32. ON THE SAME PAGE // Final Presentation 8.12.14 TOTAL DELIVERABLES The communication tool The maps for them to reference The workshops Insight book and poster
  33. ON THE SAME PAGE // Final Presentation 8.12.14 Insight book and poster TOTAL DELIVERABLES The communication tool The maps for them to reference The workshops September October November December January 2015 February March April May June July August September 14 9 Hoveseter SmestadAbildsø Kingosgate Langerud 197 5 Romsås Grunerløkka 21 6 7 4117 17 1613 Majorstua 31 Rødtvet Ammerud 23 323 MadserudLambertseter LillohjemmAkerselva 2912 927 31 10 1661513 3232 Lambertseter FlyttingavansatteFlyttingavplasser/pasienter Langerud Abildsø Furuset Ammerud Rødtvet RomsåsRomsås Madserud Smestad Majorstua Lillohjemmet40 28 30 51 1 13 14 3.9 7 44 22 8 RYEN SOLVANG TÅSEN A A B BB D C C E
  34. ON THE SAME PAGE // Final Presentation 8.12.14 TOTAL DELIVERABLES The communication tool The maps for them to reference The workshops Insight book and poster
  35. ON THE SAME PAGE // Final Presentation 8.12.14 Insight book and poster TOTAL DELIVERABLES The communication tool The maps for them to reference The workshops
  36. ON THE SAME PAGE Liz LeBlanc, Simon Søgnen Tveit, Line T. Bogen, Rickard Jensen 8 December 2014 Sykehjemsetaten Oslo Kommune Systems Oriented Design Fall 2014 A project in partnership with: ON THE SAME PAGE