Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Standard installation drawing stp bio seven (bfhc series)

1,037 views

Published on

PT.BioSeven Fiberglass Indonesia
JATIM & JATENG: (031) 593 4239 / 596 6125 / 0888 0370 8872
DKI JAKARTA & JABAR: (021) 5028 8232 / 0817 0351 5162
BALI, LOMBOK & PAPUA: (0361) 876 0074 / 0813 1577 0040
SUMATERA & KALIMANTAN: (061) 821 3733 / 0852 6285 1868
Email: biosevens@gmail.com
Web: www.bioseven.info / www.ipal.biz

Published in: Software
  • Be the first to comment

  • Be the first to like this

Standard installation drawing stp bio seven (bfhc series)

  1. 1. Manhole 50x50 Pipa inffluent 2100 1900 2000 4000 2300 TAMPAK ATAS 4000 4140 1500 1900 1500 2100 1700 400 2000 2300 Back Wash Pump Screen bar/ Strainer Effluent ke got pembuangan Air Blower Dosing Pump EFFLUENT KE 4140 BAK RESAPAN 1500 1800 Vent 1.5" SUM PIT SUM PIT 500 BFHC-10 MPD Manhole 50x50 Air Diffuser TAMPAK SAMPING Manhole air hujan tidak masuk manhole 3200 1500 1900 200 Beton atau pasangan bata Permukaan lebih tinggi dari level tanah, agar 2100 1500 400 950 650 80 Tanah, Diatasnya ditanami rumput Pasir cor Tali Tambang plastik 15 mm pengikat STP %DXW$QFKRU‘PP Pondasi Beton Wire mesh 8 mm Baut Kupu2 Permukaan tanah TAMPAK DEPAN (SECTION B-B') Sebelum di urug, segera isi vesel dengan air sampai penuh

×