Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

How To Install Floor Muffler Ultra Seal Underlayment

122,496 views

Published on

This illustrated guide will show you with detailed step-by-step pictures how to install Floor Muffler Ultraseal 2mm Flooring Underlayment. (Available here: http://bit.ly/VOCeta)

  • Our film did not unfold, it is glued to the pad and had to be pulled off and replaced under the pad to stick out the suggested 3 inches.
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

How To Install Floor Muffler Ultra Seal Underlayment

  1. 1. How to Install Floor Muffler Underlayment A Flooring Guide by Bestlaminate
  2. 2. Save Money! • Save 25-50% on your floor installation cost by doing it yourself!
  3. 3. Supply List: • Enough Floor Muffler Underlayment • Flooring • Broom • Tape • Utility Knife
  4. 4. Step 1: Clean Subfloor is Necessary Make sure subfloor is spic and span - free of loose debris and dirt.
  5. 5. • Subfloor must be in good repair, free of obstacles, and dry. Step 2: Subfloor Inspection
  6. 6. Signs of a bad subfloor: • Your subfloor might need repair if it has these signs: – Cracks – Holes – Protruding objects – Unevenness
  7. 7. Step 3: Getting Started • Roll out Floor Muffler Underlayment directly next to wall.
  8. 8. Step 4: Install Against the Wall – Install with tape strip side next to wall – Install with overlapping -film toward the open room.
  9. 9. Step 5: Parallel Installation • Install parallel to the wall in the same direction as you plan to install the flooring planks.
  10. 10. Step 6: Cut Underlayment • Cut Underlayment to fit when section is completed
  11. 11. Step 7: Unfold Film • Before installing next roll, be sure to unfold film to join with new roll.
  12. 12. Step 8: Keep on Rolling • Roll out the next roll of FloorMuffler UltraSeal in same orientation of previous row.
  13. 13. Step 9: Keeping it Together • Make sure that the foam seams are butted together.
  14. 14. Step 10: Overlap Warning • Overlap only the excess film and not the edges of the underlayment
  15. 15. Step 11: Remove and Stick • Remove the adhesive liner and stick the foam to the film overlap.
  16. 16. Acclimate Your Flooring • 48 hours before installation
  17. 17. Step 12: Keep Going • Install the flooring per manufacturer’s instructions plank by plank completing your room a section at a time.
  18. 18. www.bestlaminate.com Facebook.com/Bestlaminate Twitter.com/Bestlaminate

×