The Future of BIM is Open
Robert Klaschka
About Studio Klaschka
We have been using BIM since the practice start in 2001•	
Nearly every project from £100K-£15M in th...
About Studio Klaschka
We have advised other practices on their BIM systems and implementation•	
We have sat on numerous in...
Are these the communication formats of BIM?
Closed, proprietary, commercial
Revit AECOSIM ArchiCAD
perhaps unfair!
The Fut...
Or are these these?
Open, documented, free
SQL XML
The Future of BIM is Open
The Future of BIM is Open
A Phone The Internet
The Future of BIM is Open
A Phone The Internet
“Customers need to be given control of their own
data - not being tied into a certain manufacturer
so that when there are ...
Locked together or Locked In?
building data data analysis
The Future of BIM is Open
building data data analysis
Data and process not linked at all
The Future of BIM is Open
“Compared even to the development of the phone
or TV, the Web developed very quickly.”
Tim Berners-Lee
The Future of BIM i...
The Future of BIM is Open
IFC 2x3 : Did you Know?
Geometry•	
Unique Asset ID•	
Spatial Relationships (Outside/Inside, Spac...
“The client owns the model.”
Paul Morrell
The Future of BIM is Open
building data
Thermal Analysis
what
if?
Acoustic Analysis
Upgrade Re-design
Scheduling
Construction Planning
Drawing Produ...
building data
Thermal Analysis
what
if?
Acoustic Analysis
Upgrade Re-design
Scheduling
Construction Planning
Drawing Produ...
“Data is a precious thing and will last longer than
the systems themselves.”
Tim Berners-Lee
The Future of BIM is Open
The Future of BIM is Open
Upcoming SlideShare
Loading in …5
×

The future of BIM is open - or - Is proprietary BIM unsustainable

1,110 views

Published on

Presentation by Robert Klaschka (Studio Klaschka) at 2013 Be2Talks, London, 25 September

Published in: Technology, Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,110
On SlideShare
0
From Embeds
0
Number of Embeds
160
Actions
Shares
0
Downloads
32
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

The future of BIM is open - or - Is proprietary BIM unsustainable

  1. 1. The Future of BIM is Open Robert Klaschka
  2. 2. About Studio Klaschka We have been using BIM since the practice start in 2001• Nearly every project from £100K-£15M in the office has used BIM• Our business model is to integrate with contractors and consultants to give• them easy access to information we produce 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 start BIM BS1192 implementation pointclouds The Future of BIM is Open
  3. 3. About Studio Klaschka We have advised other practices on their BIM systems and implementation• We have sat on numerous industry panels, advisory groups• We have written for various industry journals• We have a high profile as a small practice who use BIM through speaking at• numerous conferences in the UK, Europe and the US. Our systems, conventions and protocols are based on BS1192• The Future of BIM is Open
  4. 4. Are these the communication formats of BIM? Closed, proprietary, commercial Revit AECOSIM ArchiCAD perhaps unfair! The Future of BIM is Open
  5. 5. Or are these these? Open, documented, free SQL XML The Future of BIM is Open
  6. 6. The Future of BIM is Open A Phone The Internet
  7. 7. The Future of BIM is Open A Phone The Internet
  8. 8. “Customers need to be given control of their own data - not being tied into a certain manufacturer so that when there are problems they are always obliged to go back to them.” Tim Berners-Lee The Future of BIM is Open
  9. 9. Locked together or Locked In? building data data analysis The Future of BIM is Open
  10. 10. building data data analysis Data and process not linked at all The Future of BIM is Open
  11. 11. “Compared even to the development of the phone or TV, the Web developed very quickly.” Tim Berners-Lee The Future of BIM is Open
  12. 12. The Future of BIM is Open IFC 2x3 : Did you Know? Geometry• Unique Asset ID• Spatial Relationships (Outside/Inside, Space to Space, Enclosure)• Phasing• Performance (Fire, Thermal, Structural, Access)• Management (Capacity, Usage, Lifecycle, Warranty)• Quantities• Specification• Connections•
  13. 13. “The client owns the model.” Paul Morrell The Future of BIM is Open
  14. 14. building data Thermal Analysis what if? Acoustic Analysis Upgrade Re-design Scheduling Construction Planning Drawing Production Facility Management Spatial Analysis Data Visualisation Accessibility Checking Quantity Take-off The Future of BIM is Open Proprietary Data moves a fast as one developer Forget it you’ll have to wait in line
  15. 15. building data Thermal Analysis what if? Acoustic Analysis Upgrade Re-design Scheduling Construction Planning Drawing Production Facility Management Spatial Analysis Data Visualisation Accessibility Checking Quantity Take-off The Future of BIM is Open Open Building Data is a Marketplace for Services
  16. 16. “Data is a precious thing and will last longer than the systems themselves.” Tim Berners-Lee The Future of BIM is Open
  17. 17. The Future of BIM is Open

×