Successfully reported this slideshow.
Your SlideShare is downloading. ×

Maritime Spatial Planning and Offshore Wind Development at the the 2nd Baltic Maritime Spatial Planning Forum

Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Upcoming SlideShare
The Austrian Energy Story
The Austrian Energy Story
Loading in …3
×

Check these out next

1 of 9 Ad

Maritime Spatial Planning and Offshore Wind Development at the the 2nd Baltic Maritime Spatial Planning Forum

Download to read offline

Per Hjelmsted Pedersen, Independent Senior Advisor at Hjelmsted Consulting with his speech 'Maritime Spatial Planning and Offshore Wind Development' at the the 2nd Baltic Maritime Spatial Planning Forum in Riga, Latvia on 23 November 2016 (the final conference of the Baltic SCOPE collaboration).

Video and other presentations - www.balticscope.eu
www.vasab.org

Per Hjelmsted Pedersen, Independent Senior Advisor at Hjelmsted Consulting with his speech 'Maritime Spatial Planning and Offshore Wind Development' at the the 2nd Baltic Maritime Spatial Planning Forum in Riga, Latvia on 23 November 2016 (the final conference of the Baltic SCOPE collaboration).

Video and other presentations - www.balticscope.eu
www.vasab.org

Advertisement
Advertisement

More Related Content

Slideshows for you (16)

Similar to Maritime Spatial Planning and Offshore Wind Development at the the 2nd Baltic Maritime Spatial Planning Forum (20)

Advertisement

More from Pan Baltic Scope / Baltic SCOPE (20)

Recently uploaded (20)

Advertisement

Maritime Spatial Planning and Offshore Wind Development at the the 2nd Baltic Maritime Spatial Planning Forum

  1. 1. MARITIME SPATIAL PLANNING AND OFFSHORE WIND DEVELOPMENT 2nd Baltic Maritime Spatial Planning Forum 2016 23 – 24 November 2016 in Riga, Latvia Per Hjelmsted, HJELMSTED CONSULTING in cooperation with NIRAS
  2. 2. Maritime spatial planning and offshore wind development Per Hjelmsted, HJELMSTED CONSULTING in cooperation with NIRAS 2 MARITIME SPATIAL PLANNING AND OFFSHORE WIND DEVELOPMENT Reduction of cost of electricity from offshore wind is essential for development of the offshore wind industry. Is MSP an obstacle for continous cost reductions – or is MSP the tool ?
  3. 3. * Price excludes transmission costs 3 ELECTRICITY PRICES Offshore Wind Farms 0,0 20,0 40,0 60,0 80,0 100,0 120,0 140,0 160,0 2009 2010 2013 2019 2020 2020 2021 Price over time Euro/MWh* Maritime spatial planning and offshore wind development Per Hjelmsted, HJELMSTED CONSULTING in cooperation with NIRAS
  4. 4. Maritime spatial planning and offshore wind development Per Hjelmsted, HJELMSTED CONSULTING in cooperation with NIRAS 4 MARITIME SPATIAL PLANNING AND OFFSHORE WIND DEVELOPMENT IN THE BALTIC SEA
  5. 5. 5 MEAN WIND SPEEDS Baltic Sea Maritime spatial planning and offshore wind development Per Hjelmsted, HJELMSTED CONSULTING in cooperation with NIRAS
  6. 6. 6 WATER DEPTHS Baltic Sea Maritime spatial planning and offshore wind development Per Hjelmsted, HJELMSTED CONSULTING in cooperation with NIRAS
  7. 7. * Price excludes transmission costs 7 ELECTRICITY PRICES Offshore Wind Farms Offshore Wind Farm Start of operation Capacity MW Euro/MWh* Horns Rev II 2009 209 69,1 Rødsand II 2010 200 83,9 Anholt 2013 400 140,1 Horns Rev III 2019 400 102,7 Borssele I + II (NL) 2020 <760 96,9 Danish Nearshore 2020 350 63,3 Kriegers Flak 2021 600 49,6 Maritime spatial planning and offshore wind development Per Hjelmsted, HJELMSTED CONSULTING in cooperation with NIRAS
  8. 8. * Price excludes transmission costs 8 ELECTRICITY PRICES Offshore Wind Farms 0,0 20,0 40,0 60,0 80,0 100,0 120,0 140,0 160,0 2009 2010 2013 2019 2020 2020 2021 Price over time Euro/MWh* Maritime spatial planning and offshore wind development Per Hjelmsted, HJELMSTED CONSULTING in cooperation with NIRAS
  9. 9. Maritime spatial planning and offshore wind development Per Hjelmsted, HJELMSTED CONSULTING in cooperation with NIRAS 9 MARITIME SPATIAL PLANNING AND OFFSHORE WIND DEVELOPMENT IN THE BALTIC SEA Where are the best locations – i.e. most cost effective – for OFW in The Baltic Sea? - Regarding sea bed, water depth, wind speed and access to grid - Disregarding national borders and political and regulatory obstacles How should MSP be used?

×