Understand the concepts of Work Breakdown Structure, Resource Breakdown Structure, Resource Calendar along with the fundamentals of Work Package and Deliverable
Digital Transformation in the PLM domain - distrib.pdf
Section 02 Work Packages
1. work
packages
01
work breakdown
structured representation of all sub-
sets of the cumulative work 02
resource breakdown
structured representation of resource
requirement for work items
03
resource calendar
timeline of resource requirements
based on work planning 04
change management
methodical approach to managing
changes in work packages
3. deliverable is a unique and defined
product or an outcome or even a
result which is required to be
produced.
deliverable
4. work package is all the work that
needs to be executed to create the
deliverable at the lowest level of
hierarchy.
work package
5. work break down is a hierarchal
organization of all work packages
required to produce the ultimate
required outcome.
work breakdown
6. characteristics of
work breakdown
hierarchy
arrangement to represent the relation between parent and sub
mutually exclusive
there is no overlapping amongst any packages, intersection of two
or more work package sets is null
outcome focused
it is not merely a grouping or categorization but created based up on
the flow of outcomes or deliverables
7. House
1 Landscaping
1.1 Garden
1.1.1
Flowerbed
1.1.2 Planters
1.2 Driveway
1.2.1 Paving
1.2.2 Gate -
Fence
2 Furnishings
2.1 Bedroom
2.1.1 Bed
2.1.2
Wardrobe
2.2 Living
Room
2.2.1 Sofa Set
2.2.2 Wall
Storage
2.2.3 Study
Area
Kitchen
Platform
Wall Storage
Dining Area
Appliances
Utility
Washing M/c
Dish Washer
Air
conditioner
Entertainment
Surround
Sound
Television
Projector
11. resource is an item, service or even
a deliverable of previous process,
required to execute a work package.
resource
12. resource breakdown is a hierarchal
arrangement of resource requirement
in sync with the work packages in the
work breakdown structure.
resource breakdown
13. BOQ / BOM is the complete list of
items required to deliver the output of
one or more work packages.
BOQ / BOM
14. characteristics of
resource breakdown
hierarchy
hierarchal arrangement of resources required for the outcome
correspondence
each bunch of resource has a corresponding work package
one-to-many
each work package may correspond to multiple resources
19. new
courses
business essentials
all fundamentals that you need to know about business along with
an interesting section on evolution of business.
product costing and pricing
calculating product cost with fundamental understanding of business
and various pricing strategies!
plan your business
introductory course about the business landscape and method to fill
up the business canvas.