Public Utilities Corporation
Renewable energy integration into the grid
Our Mission
Presentation for GCF 2
We are responsible for:
• The generation, transmission, distribution
and sale of electr...
At a glance
• Parastatal company created in 1986.
• Headquarters in Roche Caiman, Mahe,
Seychelles.
• 1,040 employees
Pres...
At a glance
• 35,000 electricity, 29,000 water and 4,500
sewage customers
• 378 GWh produced (2015)
• 6.8 GWh from wind
• ...
Key Assets
• La Gogue Dam
• Storage capacity – 970,000 m3
• Rochon Dam
• Storage capacity – 50,000 m3
• Desalination plant...
Key Assets
• Victoria Power Station B
• 11.5 MW capacity
• Victoria Power Station C
• 74 MW capacity
• Praslin Power Stati...
Renewable Energy Integration
• Grid Studies Conducted (Energynautics
and Okinawa Enetech)
• Grid impact assessment – how t...
Dump load test – Okinawa Enetech
• 4MW load on a generator.
• Disconnect the generator.
• How does the system react?
Prese...
Renewable Energy Integration - Generation
• Immediate - ensure sufficient Spinning Reserve is available by increasing
gene...
Transmission and Distribution
• Voltage Profile should be maintained within
acceptable limits
Presentation for GCF 10
• 33 kV South Mahe network
extension
• Will also have 2 routes to the Anse
Boileau Substation.
Presentation for GCF 11
Tra...
Transmission and Distribution
• North Mahé 33kV reinforcement
Presentation for GCF 12
Major Future Projects
• Raise La Gogue Dam to increase storage capacity by 60%.
• Replacement of 20km of water pipes (tran...
Ile de Romainville Solar Park
• 5 MWp
• 7 GWh per year, or 2% of total energy
demand.
• 5,000 tonnes of CO2 avoided, 1.6
m...
Ile de Romainville Solar Park
Presentation for GCF 15
Ile de
Romainville
New Port
St Anne Jetty
Jetty
400 m
Thank you
for your attention!
Presentation for GCF 16
Upcoming SlideShare
Loading in …5
×

Seychelles Public Utility Corporation: renewable energy integration into the grid

216 views

Published on

Seychelles Public Utility Corporation: renewable energy integration into the grid

Published in: Environment
  • Be the first to comment

Seychelles Public Utility Corporation: renewable energy integration into the grid

  1. 1. Public Utilities Corporation Renewable energy integration into the grid
  2. 2. Our Mission Presentation for GCF 2 We are responsible for: • The generation, transmission, distribution and sale of electrical energy • The treatment of raw water and supply of potable water • The treatment and safe disposal of waste water into the environment
  3. 3. At a glance • Parastatal company created in 1986. • Headquarters in Roche Caiman, Mahe, Seychelles. • 1,040 employees Presentation for GCF 3
  4. 4. At a glance • 35,000 electricity, 29,000 water and 4,500 sewage customers • 378 GWh produced (2015) • 6.8 GWh from wind • 1.3 GWh from distributed rooftop solar • 8.5 million m3 of water distributed (2015) • Turnover SCR 1.4 billion Presentation for GCF 4
  5. 5. Key Assets • La Gogue Dam • Storage capacity – 970,000 m3 • Rochon Dam • Storage capacity – 50,000 m3 • Desalination plants • Total production capacity 24,000 m3/day Presentation for GCF 5
  6. 6. Key Assets • Victoria Power Station B • 11.5 MW capacity • Victoria Power Station C • 74 MW capacity • Praslin Power Station • 16.3 MW capacity • 6 MW Port Victoria Windfarm • 1,500km low voltage distribution lines • 185 km 11kV overhead, 70 km 11kV underground Presentation for GCF 6
  7. 7. Renewable Energy Integration • Grid Studies Conducted (Energynautics and Okinawa Enetech) • Grid impact assessment – how the introduction of RE sources will affect the grid performance • Dynamic Stability • RE sources are intermittent power sources • It is important to ensure that alternative dispatchable power sources are available to meet the Load Demand at all times Presentation for GCF 7
  8. 8. Dump load test – Okinawa Enetech • 4MW load on a generator. • Disconnect the generator. • How does the system react? Presentation for GCF 8
  9. 9. Renewable Energy Integration - Generation • Immediate - ensure sufficient Spinning Reserve is available by increasing generator capacity if necessary • Short-term – possible introduction of adequate Battery Storage within 3 years Presentation for GCF 9
  10. 10. Transmission and Distribution • Voltage Profile should be maintained within acceptable limits Presentation for GCF 10
  11. 11. • 33 kV South Mahe network extension • Will also have 2 routes to the Anse Boileau Substation. Presentation for GCF 11 Transmission and Distribution
  12. 12. Transmission and Distribution • North Mahé 33kV reinforcement Presentation for GCF 12
  13. 13. Major Future Projects • Raise La Gogue Dam to increase storage capacity by 60%. • Replacement of 20km of water pipes (transmission and distribution). • New La Digue sewage treatment plant. • Construct 5 MW solar park on Ile de Romainville. Presentation for GCF 13
  14. 14. Ile de Romainville Solar Park • 5 MWp • 7 GWh per year, or 2% of total energy demand. • 5,000 tonnes of CO2 avoided, 1.6 million litres of HFO saved every year. • US$ 11.2 million. • Loan from IRENA-ADFD. • Construction to start in 2017. Presentation for GCF 14
  15. 15. Ile de Romainville Solar Park Presentation for GCF 15 Ile de Romainville New Port St Anne Jetty Jetty 400 m
  16. 16. Thank you for your attention! Presentation for GCF 16

×