GENSOL ENGINEERING PVT. LTD
Comparative Study of “Forecasting & Scheduling” for
Solar & Wind Projects- 2019
Key Highlights of Forecasting & Scheduling 2019
Gensol understands that in current power scenario, the forecasting & scheduling are highly important parameters to
manage balance between supply and demand of energy in India.
State-wise comparative
analysis has been carried
out to highlight following
points :
• Energy Forecasting & Scheduling
• Key Amendments in Electricity Act
• Key Amendments in National Tariff Policy
• Regulation in Draft & Final stages
• Responsibility & Requirements
• Available Capacity & Tolerance Band
• Deviation Settlement Mechanism (DSM)
• Metering, Energy & Deviation Accounting
Gensol Group
Energy Forecasting & Scheduling (F&S)
Gensol Group
1) Energy Forecasting is an
estimation of probable
generation of energy
generating power plants.
2) Energy Forecasting is an
essential pre-requisite for
scheduling of energy
generation.
1) Each day is divided into 96
blocks of 15 minutes each
starting from 00:00 hour.
2) Each generating station
has to make advance
declaration of its capacity for
generation in terms of MWh
or kWh for each time block
of the next day which is
termed as scheduling.
Forecasting
Scheduling
Latest Amendments in Regulations –Forecasting & Scheduling
Gensol Group
Amendment to
Electricity Act,2003
Released on 7th
September 2018
• The Central Government shall establish National Load Despatch Centre (NLDC) for
optimum scheduling & despatch of electricity among Regional Load Despatch
Centres (RLDC) .
• The Regional Load Despatch Centre (RLDC) shall comply with principles, guidelines
and methodologies in respect of wheeling & optimum scheduling and despatch of
electricity within a particular territory/region as specified in the Grid Code.
• The State Load Despatch Centre (SLDC) shall be responsible for optimum scheduling
and despatch of electricity within a State.
Amendment to National
Tariff Policy,2016
Released on 30th May
2018
• The scheduling and despatch of conventional and renewable generating plants shall
be done separately for the generating plants whose PPAs has been expired/ whose
useful life has completed or proposed coal/lignite based thermal plants bundled with
renewable power generating plants.
• Transmission Losses & Wheeling losses in the distribution system shall be adjusted
in scheduling or may be paid as per regulations formed by State Commission.
• Distribution Licensee shall mandatory undertake load forecasting every year and
publish and submit to CERC/SERC.
Availability Based Tariff (ABT)- Drawbacks
Gensol Group
Availability Based Tariff (ABT) is a frequency based pricing mechanism to which was used to maintain grid discipline by
implementing incentive/disincentive during unscheduled power interchange(UI).
Features
•Enhanced Grid Discipline
•Promote Competition & Efficiency
•Encourage Economic Despatch & Address Grid Disturbance Issues
•Provide Economic viable power with right pricing
Drawbacks
•In ABT mechanism, incentives and penalties are charged on average grid
frequency in a time block of 15 minutes
•No benefit to the applicable UI Tariff/Charges.
•The generators & DISCOMs who are not adhering to grid discipline are not
penalised.
•The incentives and disincentives are prefixed by CERC for variation in grid
frequency which may not reflect actual situation on day-to-day basis.
•ABT mechanism does not permit the grid participants to decide the optimum
frequency within permitted frequency band on day-to-day basis.
Deviation Settlement Mechanism(DSM)
Deviation Settlement Mechanism(DSM) is a mechanism controlled by the SLDC/RLDC which takes care of Energy
Accounting, Energy Deviation accounting and deviation charges for energy supplied by the generators connected to
the State grid within the state or outside the state and Consumers within the State and thus maintain grid stability
and grid discipline.
DSM helps the state to manage the overall generation-load balance across the state periphery.
Objectives of DSM
•Secure and Reliable Grid Operations
•Encouraging Higher Availability of Generation
•Install Forecasting & Load management discipline amongst DISCOMs ,load serving entities & OA consumers
•Ensure Dispatch Discipline amongst generators based on economic /merit order principles
•Serve as balancing mechanism within the State
•Facilitate energy accounting and Deviation Settlement
Gensol Group
Deviation Settlement Mechanism (DSM)Framework
Absolute Error(%) = (Actual Generation –Scheduled Generation )/Available Capacity(AvC) x 100
• Deviation Settlement with Tolerance Band of +/- 15%
• Receipt from/Payment to Pool Account is done at PPA rate
• Day is divided into 96 time blocks with each time block of 15 minutes
• 16 revisions are allowed, one for every one and half hour, effective from 4th time block
• Payment of Deviation charges has to be done within 10 days of issuance of deviation charges by the SLDC
States having forecasting, scheduling & DSM regulations for
Solar and Wind Generation Sources
Gensol Group
State Region Year of Release Draft Final
Punjab
Northern
2019 √
Haryana 2018 √
Rajasthan 2017 √
Uttar Pradesh 2017 √
Gujarat
Western &
Central
2017 √
Maharashtra 2018 √
Madhya Pradesh 2018 √
Jharkhand 2016 √
Manipur & Mizoram
Eastern
2016 √
Meghalaya 2018 √
Assam 2018 √
Tripura 2016 √
Tamil Nadu
Southern
2017 √
Telangana 2018 √
Karnataka 2015 √
Andhra Pradesh 2017 √
A) Comparative Study of F&S Regulations : Northern Region
Gensol Group
S.No. Particulars
Punjab
(Final)
Haryana
(Draft)
Rajasthan
(Final)
Uttar Pradesh
(Final)
1 Applicability
Wind and solar generators
connected to Intra-state T/D
system & Selling power within or
outside the state provided that the
capacity of the generator should
be greater than or equal to 5 MW.
Wind and solar generators
connected to Intra-state T/D system
& Selling power within or outside
the state provided that the capacity
of the generator should be greater
than or equal to 1 MW.
Wind and solar generators
connected to Intra-state T/D
system & Selling power within or
outside the state provided that the
capacity of the generator should
be greater than or equal to 5 MW.
Wind and solar generators
connected to Intra-state T/D
system & Selling power within or
outside the state provided that the
capacity of the generator should be
greater than or equal to 5 MW
2
Forecasting
responsibility
Wind and solar generator /QCA/
forecast by SLDC to be accepted
QCA/ forecast by SLDC to be
accepted
Wind and solar generator /QCA/
forecast by SLDC to be accepted
Wind and solar generator /QCA/
forecast by SLDC to be accepted
3
Scheduling
responsibility
Wind and solar generator or by
Qualified Coordinating Agency
Qualified Coordinating Agency
(QCA)
Wind and solar generator or by
QCA
Wind and solar generator or by
QCA
4
Tolerance band
for DSM
15% for wind and solar generators
for sale/supply of power within the
state
10% for wind and solar generators
for sale or self-consumption of
power within the state
15% for wind and solar generators
for sale/supply of power within the
state
15% for wind and solar generators
for sale/supply of power within the
state
5
Scheduling
requirement
Day ahead and week ahead Day ahead and week ahead Day ahead Day ahead
6
Reference point
for DSM
Pooling Station /Interconnection
point to State Grid
Pooling Station /Interconnection
point to State Grid
Pooling Station /Interconnection
point to State Grid
Pooling Station /Interconnection
point to State Grid
Gensol Group
Comparative Study of F&S Regulations :Northern Region
S.No. Particulars
Punjab
(Final)
Haryana
(Draft)
Rajasthan
(Final)
Uttar Pradesh
(Final)
7
Apportion of energy
deviation & DSM charges among
RE generators at a Pooling
Substation
In proportion to actual
generated units in each time
block or available capacity
In proportion to actual
generated units in each time
block or available capacity
In proportion to actual
generated units in each time
block or available capacity
In proportion to actual
generated units in each time
block or available capacity
8 Revisions allowed per day
Max. 16 revisions for wind and
solar generators
Max. 16 revisions for wind and
solar generators
Max. 16 revisions for wind and
solar generators
Max. 16 revisions for wind and
max.9 revisions for solar
9
Telemetry and communication
requirement
Data relating to power
generation parameters and
weather related Data
Data relating to power system
output & parameters and
weather related Data
Data relating to power system
output & parameters and
weather related Data
Data relating to power system
output & parameters and
weather related Data
10
Responsibility of providing
telemetry and communication Wind/solar generator or QCA
Qualified Coordinating Agency
(QCA)
Wind/solar generator or QCA Wind/solar generator or QCA
11
Time period for payment of
deviation charges
Within 10 days from issuance of
invoice
Within 10 days from issuance of
invoice
Not Covered Not Covered
12
Interest for late payment of
deviation charges
0.04% per day for the period of
delay
1.25% per month for the period
of delay
Not Covered Not Covered
13 BG/LC Required Not Covered Not Covered Not Covered Not Covered
Gensol Group
B)Comparative Study of F&S Regulation: Western & Central Region
S.No. Particulars
Gujarat
(Draft)
Maharashtra
(Draft)
Madhya Pradesh
(Final)
Jharkhand
(Final)
1 Applicability
Wind and solar generators
connected to Intra-state T/D
system &
selling power within or outside
the state.
Wind and solar generators
connected to Intra-state T/D
system & Selling power within
or outside the state provided
that the capacity of the
generator should be greater
than or equal to 5 MW
Wind Generators having installed
capacity of 10 MW and above and
Solar Generators having installed
capacity of 5 MW and above and
supplying power to ESCOMs or to
third party or for self-consumption
through open access and selling
power within or outside the state.
Wind and solar generators connected
to Intra-state T/D system & Selling
power within or outside the state
provided that the capacity of the
generator should be greater than or
equal to 5 MW
2
Forecasting
responsibility
Wind and solar generator /QCA/
forecast by SLDC to be accepted
QCA/ forecast by SLDC to be
accepted
Wind and solar generator /QCA/
forecast by SLDC to be accepted
Wind and solar generator /QCA/
forecast by SLDC to be accepted
3
Scheduling
responsibility
Wind and solar generator or by
QCA
QCA Wind and solar generator or by QCA Wind and solar generator or by QCA
4
Tolerance band
for DSM
12% for wind projects
commissioned prior to 30.1.2010
and 8% for projects commissioned
after 30.1.2010. 7% for existing
and new solar project
15% for wind and solar
generators for sale/supply of
power within the state
15% for wind and solar generators
for sale/supply of power within the
state
15% for wind and solar generators
for sale/supply of power within the
state
5
Scheduling
requirement
Day ahead and 03 day ahead Day Ahead and week ahead Day ahead and week ahead Day ahead and week ahead
6
Reference point
for DSM
Pooling Station /Interconnection
point to State Grid
Pooling Station /Interconnection
point to State Grid
Pooling Station /Interconnection
point to State Grid
Pooling Station /Interconnection
point to State Grid
Gensol Group
Comparative Study of F&S Regulations : Western & Central Region
S.No. Particulars
Gujarat
(Draft)
Maharashtra
(Draft)
Madhya Pradesh
(Final)
Jharkhand
(Final)
7
Apportion of energy
eeviation & DSM charges among
RE generators at a Pooling S/S
In proportion to actual generated
units in each time block or
available capacity or absolute
error of individual generator
In proportion to actual
generated units in each time
block
In proportion to actual
generated units in each time
block or available capacity
In proportion to actual
generated units in each time
block or available capacity
8 Revisions allowed per day
Max. 16 revisions for wind and
max. 8 revisions for solar
Max. 16 revisions for wind and
solar generators
Max. 16 revisions for wind
and solar generators
Max. 16 revisions for wind
and solar generators
9
Telemetry and communication
requirement
Data relating to power system
output & parameters and
weather related data
Data relating to power
generation parameters and
weather related data
Data relating to power system
output & parameters and
weather related data
Data relating to power
system output & parameters
and weather related data
10
Responsibility of providing
telemetry and communication Wind/solar generator or QCA QCA Wind/solar generator or QCA Wind/solar generator or QCA
11
Time period for payment of
deviation charges
Within 10 days from issuance of
invoice
Within 10 days from issuance of
invoice
Within 10 days from issuance
of invoice
Within 10 days from issuance
of invoice
12
Interest for late payment of
devation charges
0.04% per day for the period of
delay
1.25% per month for the period
of delay
0.04% per day for the period
of delay
Not Covered
13 BG/LC Required
BG/Revolving LC covering DSM
payment for 6 months
Not Covered
LC of 110% of average payable
weekly liability for deviations
in the previous financial year
Not Covered
Gensol Group
C) Comparative Study of F&S Regulations : Eastern Region
S.No. Particulars
Manipur & Mizoram
(Draft)
Meghalaya
(Final)
Assam
(Draft)
Tripura
(Final)
1 Applicability
Wind and solar generators
connected to Intra-state T/D
system &
Selling power within or outside the
state
Wind and solar generators
connected to Intra-state T/D system
& Selling power within or outside the
state provided that the capacity of
the generator should be greater than
or equal to 1 MW
Wind and solar generators
connected to Intra-state T/D
system & selling power within
or outside the state
Wind and solar generators
connected to Intra-state T/D
system & selling power within
or outside the state
2
Forecasting
responsibility
Wind and solar generator /QCA/
forecast by SLDC to be accepted
QCA/ forecast by SLDC to be
accepted
Wind and solar generator
/QCA/ forecast by SLDC to be
accepted
Wind and solar generator
/QCA/ forecast by SLDC to be
accepted
3
Scheduling
responsibility
Wind and solar generator or by
QCA
QCA
Wind and solar generator or by
QCA
Wind and solar generator or by
QCA
4
Tolerance band
for DSM
15% for wind and solar generators
commissioned prior to 18.7.2016
and 10% for commissioned after
18.7.2016 for sale/supply of power
within the state.
15% for wind and solar generators
for sale/supply of power within the
state
10% for wind and solar
generators for sale/supply of
power within the state
10% for wind and solar
generators for sale/supply of
power within the state
5
Scheduling
requirement
Day ahead and week ahead Day ahead and week ahead Day ahead and week ahead Day ahead and week ahead
6
Reference point
for DSM
Pooling Station /Interconnection
point to State Grid
Pooling Station /Interconnection
point to State Grid
Pooling Station
/Interconnection point to State
Grid
Pooling Station
/Interconnection point to State
Grid
Gensol Group
Comparative Study of F&S Regulations : Eastern Region
S.No. Particulars
Manipur & Mizoram
(Draft)
Meghalaya
(Final)
Assam
(Draft)
Tripura
(Final)
7
Apportion of energy
deviation & DSM charges among
RE generators at a Pooling S/S
In proportion to actual
generated units in each time
block or available capacity
In proportion to actual
generated units in each time
block or available capacity
In proportion to actual
generated units in each time
block or available capacity
In proportion to actual
generated units in each time
block or available capacity
8 Revisions allowed per day
Max. 16 revisions for wind and
solar generators
Max. 16 revisions for wind and
solar generators
Max. 16 revisions for wind
and max.9 revisions for solar
Max. 16 revisions for wind and
max.9 revisions for solar
9
Telemetry and communication
requirement
Data relating to power system
output & parameters and
weather related Data
Data relating to power
generation parameters and
weather related Data
Data relating to power system
output & parameters and
weather related Data
Data relating to power system
output & parameters and
weather related Data
10
Responsibility of providing
telemetry and communication Wind/solar generator or QCA QCA Wind/solar generator or QCA Wind/solar generator or QCA
11
Time period for payment of
deviation charges
Not Covered
Within 10 days from issuance
of invoice
Not Covered Not Covered
12
Interest for late payment of
deviation charges
Not Covered
1.25% per month for the
period of delay
Not Covered Not Covered
13 BG/LC Required Not Covered
LC for an amount equivalent to
1.5 times of average of weekly
deviations amount for the past
four settlement periods.
Not Covered Not Covered
Gensol Group
D) Comparative Study of F&S Regulations : Southern Region
S.No. Particulars
Tamil Nadu
(Draft)
Telangana
(Final)
Karnataka
(Final)
Andhra Pradesh
(Final)
1 Applicability
Wind and solar generators
connected to Intra-state T/D
system & selling power within or
outside the state
Wind and solar generators
connected to Intra-state T/D
system & Selling power within or
outside the state provided that
the capacity of the generator
should be greater than or equal
to 5 MW
Wind Generators having installed
capacity of 10 MW and above and
Solar Generators having installed
capacity of 5 MW and above and
supplying power to ESCOMs or to
third party or for self-consumption
through open access within or
outside the state.
Wind and solar generators
connected to Intra-state T/D
system & selling power within or
outside the state
2
Forecasting
responsibility
QCA forecast by SLDC to be
accepted
Wind and solar generator /QCA/
forecast by SLDC to be accepted
Wind and solar generator /QCA/
forecast by SLDC to be accepted
Wind and solar generator /QCA/
forecast by SLDC to be accepted
3
Scheduling
Responsibility
QCA
Wind and solar generator or by
QCA
Wind and solar generator or by
QCA or through Aggregator
Wind and solar generator or by
QCA
4
Tolerance Band
for DSM
10% for wind and solar
generators for sale/supply of
power within the state
15% for wind and solar
generators for sale/supply of
power within the state
15% for wind and solar generators
for sale/supply of power within
the state
15% for wind and solar
generators for sale/supply of
power within the state
5
Scheduling
Requirement
Day ahead and week ahead Day ahead and week ahead Day ahead and week ahead Day ahead and week ahead
6
Reference Point
for DSM
Pooling station /Interconnection
point to State Grid
Pooling Station /Interconnection
point to State Grid
Pooling Station /Interconnection
point to State Grid
Pooling Station /Interconnection
point to State Grid
Gensol Group
Comparative Study of F&S Regulations : Southern Region
S.No. Particulars
Tamil Nadu
(Draft)
Telangana
(Final)
Karnataka
(Final)
Andhra Pradesh
(Final)
7
Apportion of energy
deviation & DSM charges
among RE generators at a
Pooling S/S
In proportion to actual generated
units in each time block or
available capacity
In proportion to energy
injected in each time block
In proportion to actual
generated units in each time
block or available capacity
In proportion to actual
generated units in each time
block or available capacity
8 Revisions allowed per day
Max. 16 revisions for wind and
solar generators
Max. 16 revisions for wind and
max. 9 revisions for solar
Max. 16 revisions for wind
and solar generators
Max. 16 revisions for wind
and max.9 revisions for solar
9
Telemetry and communication
requirement
Data relating to power system
output & parameters and
weather related Data
Data relating to power system
output & parameters and
weather related Data
Data relating to power
output,turbine availability and
weather related Data
Data relating to power
generation parameters and
weather related Data
10
Responsibility of providing
telemetry and communication QCA Wind/solar generator
Wind/solar generator or QCA
or Aggregator
Wind/solar generator or QCA
11
Time period for payment of
deviation charges
Within 10 days from issuance of
invoice
Within 10 days from issuance
of invoice
Within 10 days from issuance
of invoice
Not Covered
12
Interest for late payment of
deviations charges
1.25% per month for the period
of delay
0.04% per day for the period of
delay
0.04% per day for the period
of delay
Not Covered
13 BG/LC Required Not Covered
Bank guarantee or LC covering
deviation settlement
mechanism payment for 6
months
Not Covered Not Covered
Gensol is one of the leading consultants and system integrators for Solar Power Plants. We boast of a portfolio of over 6000 MW of Solar Photovoltaic Plants. Gensol is also a channel
partner to Ministry of New & Renewable Energy and installs kW scale Solar Rooftop systems on a turnkey basis with more than 42 MW of cumulative installations across the country.
The information contained herein is of a general nature and is not intended to address the circumstances of any particular individual or entity. Although we endeavor to provide
accurate and timely information, there can be no guarantee that such information is accurate as of the date it is received or that it will continue to be accurate in the future. No one
should act on such information without appropriate professional advice after a thorough examination of the particular situation.
Email: solar@gensol.in | Web: www.gensol.in | Phone: +91 79 40068235 | Twitter: gensol_tweets
Gensol Engineering Pvt Ltd | Gensol Consultants Pvt Ltd | Solarig Gensol Utilities Pvt Ltd
Corporate Office
A2, 12th Floor Palladium, Opp. to Vodafone House , Corporate Road, Prahladnagar, Ahmedabad, Gujarat. India - 380015

More Related Content

What's hot

Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesPuneet Jaggi
 
10 mw solar power plant
10 mw solar power plant10 mw solar power plant
10 mw solar power plantRusiru Sanjaya
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateSaurabh Parihar
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and InstalltionEli Israeli
 
Solar Power Plant System Sizing
Solar Power Plant System SizingSolar Power Plant System Sizing
Solar Power Plant System Sizingfirstgreen
 
Introduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemIntroduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemShoeb Ali Khan
 
Developing Solar Projects
Developing Solar ProjectsDeveloping Solar Projects
Developing Solar Projectsalejolop
 
Webinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsystWebinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsystsolpowerpeople
 
Presentation_Wind & Solar Forecasting & Schedulong in India
Presentation_Wind & Solar Forecasting & Schedulong in IndiaPresentation_Wind & Solar Forecasting & Schedulong in India
Presentation_Wind & Solar Forecasting & Schedulong in IndiaDas A. K.
 
Power sector reforms
Power sector reformsPower sector reforms
Power sector reformsPSPCL
 
BESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfBESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfPaul374728
 
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Gensol Engineering Limited
 

What's hot (20)

Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
10 mw solar power plant
10 mw solar power plant10 mw solar power plant
10 mw solar power plant
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard template
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and Installtion
 
Availability Based Tariff and UI charges
Availability Based Tariff and UI chargesAvailability Based Tariff and UI charges
Availability Based Tariff and UI charges
 
List of Clearances for Solar Project
List of Clearances for Solar ProjectList of Clearances for Solar Project
List of Clearances for Solar Project
 
Grid Connected PV Systems
Grid Connected PV SystemsGrid Connected PV Systems
Grid Connected PV Systems
 
Micro grid
Micro gridMicro grid
Micro grid
 
Solar pv connected to grid
Solar pv connected to gridSolar pv connected to grid
Solar pv connected to grid
 
Solar Power Plant System Sizing
Solar Power Plant System SizingSolar Power Plant System Sizing
Solar Power Plant System Sizing
 
Introduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemIntroduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power system
 
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig GensolBasics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
 
Developing Solar Projects
Developing Solar ProjectsDeveloping Solar Projects
Developing Solar Projects
 
Webinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsystWebinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsyst
 
Presentation_Wind & Solar Forecasting & Schedulong in India
Presentation_Wind & Solar Forecasting & Schedulong in IndiaPresentation_Wind & Solar Forecasting & Schedulong in India
Presentation_Wind & Solar Forecasting & Schedulong in India
 
Power sector reforms
Power sector reformsPower sector reforms
Power sector reforms
 
BESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfBESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdf
 
Open access ppt
Open access pptOpen access ppt
Open access ppt
 
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
 

Similar to Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19

Towards Net Zero Power 04.03.2020.pptx
Towards Net Zero Power 04.03.2020.pptxTowards Net Zero Power 04.03.2020.pptx
Towards Net Zero Power 04.03.2020.pptxVaibhavHindia
 
Choosing Green: Status and Challenges of RE based Open Access
Choosing Green: Status and Challenges of RE based Open AccessChoosing Green: Status and Challenges of RE based Open Access
Choosing Green: Status and Challenges of RE based Open AccessWRI India
 
Presentation_on_DSM_and_ABTmechanisam.pptx
Presentation_on_DSM_and_ABTmechanisam.pptxPresentation_on_DSM_and_ABTmechanisam.pptx
Presentation_on_DSM_and_ABTmechanisam.pptxRuchikavanjari6thstd
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesSaurabh Mehta
 
Tariff Setting In the Indian Power Sector-An Overview
Tariff Setting In the Indian Power Sector-An OverviewTariff Setting In the Indian Power Sector-An Overview
Tariff Setting In the Indian Power Sector-An OverviewIOSR Journals
 
What is availability tariff
What is availability tariffWhat is availability tariff
What is availability tariffJay Ranvir
 
Solar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP ChawlaSolar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP ChawlaY P Chawla
 
Session 3: Impact on U.S. Ancillary Services Markets from Variable Renewable ...
Session 3: Impact on U.S. Ancillary Services Markets from Variable Renewable ...Session 3: Impact on U.S. Ancillary Services Markets from Variable Renewable ...
Session 3: Impact on U.S. Ancillary Services Markets from Variable Renewable ...IPPAI
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Gensol Engineering Limited
 
Eskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentationEskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentationMatthew Le Cordeur
 
Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...
Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...
Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...del2infinity Energy
 
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distributionDay-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distributionIPPAI
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyJay Ranvir
 
Forecasting, scheduling and im balance handling for
Forecasting, scheduling and im balance handling forForecasting, scheduling and im balance handling for
Forecasting, scheduling and im balance handling forJay Ranvir
 
Requerimientos ERCOT para Recursos Renovables.pdf
Requerimientos ERCOT para Recursos Renovables.pdfRequerimientos ERCOT para Recursos Renovables.pdf
Requerimientos ERCOT para Recursos Renovables.pdfssuserf19e47
 

Similar to Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19 (20)

Towards Net Zero Power 04.03.2020.pptx
Towards Net Zero Power 04.03.2020.pptxTowards Net Zero Power 04.03.2020.pptx
Towards Net Zero Power 04.03.2020.pptx
 
DSM.pptx
DSM.pptxDSM.pptx
DSM.pptx
 
Choosing Green: Status and Challenges of RE based Open Access
Choosing Green: Status and Challenges of RE based Open AccessChoosing Green: Status and Challenges of RE based Open Access
Choosing Green: Status and Challenges of RE based Open Access
 
Presentation_on_DSM_and_ABTmechanisam.pptx
Presentation_on_DSM_and_ABTmechanisam.pptxPresentation_on_DSM_and_ABTmechanisam.pptx
Presentation_on_DSM_and_ABTmechanisam.pptx
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent Initiatives
 
Tariff Setting In the Indian Power Sector-An Overview
Tariff Setting In the Indian Power Sector-An OverviewTariff Setting In the Indian Power Sector-An Overview
Tariff Setting In the Indian Power Sector-An Overview
 
RENEWABLE POLICY
RENEWABLE POLICYRENEWABLE POLICY
RENEWABLE POLICY
 
What is availability tariff
What is availability tariffWhat is availability tariff
What is availability tariff
 
Solar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP ChawlaSolar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP Chawla
 
Session 3: Impact on U.S. Ancillary Services Markets from Variable Renewable ...
Session 3: Impact on U.S. Ancillary Services Markets from Variable Renewable ...Session 3: Impact on U.S. Ancillary Services Markets from Variable Renewable ...
Session 3: Impact on U.S. Ancillary Services Markets from Variable Renewable ...
 
Abt meter
Abt meterAbt meter
Abt meter
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
 
Eskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentationEskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentation
 
Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...
Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...
Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...
 
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distributionDay-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind Energy
 
Forecasting, scheduling and im balance handling for
Forecasting, scheduling and im balance handling forForecasting, scheduling and im balance handling for
Forecasting, scheduling and im balance handling for
 
REC status
REC statusREC status
REC status
 
Requerimientos ERCOT para Recursos Renovables.pdf
Requerimientos ERCOT para Recursos Renovables.pdfRequerimientos ERCOT para Recursos Renovables.pdf
Requerimientos ERCOT para Recursos Renovables.pdf
 
Commercial presentation
Commercial presentationCommercial presentation
Commercial presentation
 

More from Gensol Engineering Limited

Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Gensol Engineering Limited
 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Gensol Engineering Limited
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Gensol Engineering Limited
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Gensol Engineering Limited
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Gensol Engineering Limited
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019Gensol Engineering Limited
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Gensol Engineering Limited
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Gensol Engineering Limited
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderGensol Engineering Limited
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Gensol Engineering Limited
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Gensol Engineering Limited
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Gensol Engineering Limited
 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Gensol Engineering Limited
 
Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol Engineering Limited
 
Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy Gensol Engineering Limited
 

More from Gensol Engineering Limited (20)

Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019
 
List of successful bidders 11.03.2019
List of successful bidders 11.03.2019List of successful bidders 11.03.2019
List of successful bidders 11.03.2019
 
Module Price Trend Analysis
Module Price Trend AnalysisModule Price Trend Analysis
Module Price Trend Analysis
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
 
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
 
Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18
 
Floating Solar PV - An Introduction
Floating Solar PV -  An Introduction Floating Solar PV -  An Introduction
Floating Solar PV - An Introduction
 
Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy
 

Recently uploaded

Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 

Recently uploaded (20)

Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 

Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19

  • 1. GENSOL ENGINEERING PVT. LTD Comparative Study of “Forecasting & Scheduling” for Solar & Wind Projects- 2019
  • 2. Key Highlights of Forecasting & Scheduling 2019 Gensol understands that in current power scenario, the forecasting & scheduling are highly important parameters to manage balance between supply and demand of energy in India. State-wise comparative analysis has been carried out to highlight following points : • Energy Forecasting & Scheduling • Key Amendments in Electricity Act • Key Amendments in National Tariff Policy • Regulation in Draft & Final stages • Responsibility & Requirements • Available Capacity & Tolerance Band • Deviation Settlement Mechanism (DSM) • Metering, Energy & Deviation Accounting Gensol Group
  • 3. Energy Forecasting & Scheduling (F&S) Gensol Group 1) Energy Forecasting is an estimation of probable generation of energy generating power plants. 2) Energy Forecasting is an essential pre-requisite for scheduling of energy generation. 1) Each day is divided into 96 blocks of 15 minutes each starting from 00:00 hour. 2) Each generating station has to make advance declaration of its capacity for generation in terms of MWh or kWh for each time block of the next day which is termed as scheduling. Forecasting Scheduling
  • 4. Latest Amendments in Regulations –Forecasting & Scheduling Gensol Group Amendment to Electricity Act,2003 Released on 7th September 2018 • The Central Government shall establish National Load Despatch Centre (NLDC) for optimum scheduling & despatch of electricity among Regional Load Despatch Centres (RLDC) . • The Regional Load Despatch Centre (RLDC) shall comply with principles, guidelines and methodologies in respect of wheeling & optimum scheduling and despatch of electricity within a particular territory/region as specified in the Grid Code. • The State Load Despatch Centre (SLDC) shall be responsible for optimum scheduling and despatch of electricity within a State. Amendment to National Tariff Policy,2016 Released on 30th May 2018 • The scheduling and despatch of conventional and renewable generating plants shall be done separately for the generating plants whose PPAs has been expired/ whose useful life has completed or proposed coal/lignite based thermal plants bundled with renewable power generating plants. • Transmission Losses & Wheeling losses in the distribution system shall be adjusted in scheduling or may be paid as per regulations formed by State Commission. • Distribution Licensee shall mandatory undertake load forecasting every year and publish and submit to CERC/SERC.
  • 5. Availability Based Tariff (ABT)- Drawbacks Gensol Group Availability Based Tariff (ABT) is a frequency based pricing mechanism to which was used to maintain grid discipline by implementing incentive/disincentive during unscheduled power interchange(UI). Features •Enhanced Grid Discipline •Promote Competition & Efficiency •Encourage Economic Despatch & Address Grid Disturbance Issues •Provide Economic viable power with right pricing Drawbacks •In ABT mechanism, incentives and penalties are charged on average grid frequency in a time block of 15 minutes •No benefit to the applicable UI Tariff/Charges. •The generators & DISCOMs who are not adhering to grid discipline are not penalised. •The incentives and disincentives are prefixed by CERC for variation in grid frequency which may not reflect actual situation on day-to-day basis. •ABT mechanism does not permit the grid participants to decide the optimum frequency within permitted frequency band on day-to-day basis.
  • 6. Deviation Settlement Mechanism(DSM) Deviation Settlement Mechanism(DSM) is a mechanism controlled by the SLDC/RLDC which takes care of Energy Accounting, Energy Deviation accounting and deviation charges for energy supplied by the generators connected to the State grid within the state or outside the state and Consumers within the State and thus maintain grid stability and grid discipline. DSM helps the state to manage the overall generation-load balance across the state periphery. Objectives of DSM •Secure and Reliable Grid Operations •Encouraging Higher Availability of Generation •Install Forecasting & Load management discipline amongst DISCOMs ,load serving entities & OA consumers •Ensure Dispatch Discipline amongst generators based on economic /merit order principles •Serve as balancing mechanism within the State •Facilitate energy accounting and Deviation Settlement
  • 7. Gensol Group Deviation Settlement Mechanism (DSM)Framework Absolute Error(%) = (Actual Generation –Scheduled Generation )/Available Capacity(AvC) x 100 • Deviation Settlement with Tolerance Band of +/- 15% • Receipt from/Payment to Pool Account is done at PPA rate • Day is divided into 96 time blocks with each time block of 15 minutes • 16 revisions are allowed, one for every one and half hour, effective from 4th time block • Payment of Deviation charges has to be done within 10 days of issuance of deviation charges by the SLDC
  • 8. States having forecasting, scheduling & DSM regulations for Solar and Wind Generation Sources Gensol Group State Region Year of Release Draft Final Punjab Northern 2019 √ Haryana 2018 √ Rajasthan 2017 √ Uttar Pradesh 2017 √ Gujarat Western & Central 2017 √ Maharashtra 2018 √ Madhya Pradesh 2018 √ Jharkhand 2016 √ Manipur & Mizoram Eastern 2016 √ Meghalaya 2018 √ Assam 2018 √ Tripura 2016 √ Tamil Nadu Southern 2017 √ Telangana 2018 √ Karnataka 2015 √ Andhra Pradesh 2017 √
  • 9. A) Comparative Study of F&S Regulations : Northern Region Gensol Group S.No. Particulars Punjab (Final) Haryana (Draft) Rajasthan (Final) Uttar Pradesh (Final) 1 Applicability Wind and solar generators connected to Intra-state T/D system & Selling power within or outside the state provided that the capacity of the generator should be greater than or equal to 5 MW. Wind and solar generators connected to Intra-state T/D system & Selling power within or outside the state provided that the capacity of the generator should be greater than or equal to 1 MW. Wind and solar generators connected to Intra-state T/D system & Selling power within or outside the state provided that the capacity of the generator should be greater than or equal to 5 MW. Wind and solar generators connected to Intra-state T/D system & Selling power within or outside the state provided that the capacity of the generator should be greater than or equal to 5 MW 2 Forecasting responsibility Wind and solar generator /QCA/ forecast by SLDC to be accepted QCA/ forecast by SLDC to be accepted Wind and solar generator /QCA/ forecast by SLDC to be accepted Wind and solar generator /QCA/ forecast by SLDC to be accepted 3 Scheduling responsibility Wind and solar generator or by Qualified Coordinating Agency Qualified Coordinating Agency (QCA) Wind and solar generator or by QCA Wind and solar generator or by QCA 4 Tolerance band for DSM 15% for wind and solar generators for sale/supply of power within the state 10% for wind and solar generators for sale or self-consumption of power within the state 15% for wind and solar generators for sale/supply of power within the state 15% for wind and solar generators for sale/supply of power within the state 5 Scheduling requirement Day ahead and week ahead Day ahead and week ahead Day ahead Day ahead 6 Reference point for DSM Pooling Station /Interconnection point to State Grid Pooling Station /Interconnection point to State Grid Pooling Station /Interconnection point to State Grid Pooling Station /Interconnection point to State Grid
  • 10. Gensol Group Comparative Study of F&S Regulations :Northern Region S.No. Particulars Punjab (Final) Haryana (Draft) Rajasthan (Final) Uttar Pradesh (Final) 7 Apportion of energy deviation & DSM charges among RE generators at a Pooling Substation In proportion to actual generated units in each time block or available capacity In proportion to actual generated units in each time block or available capacity In proportion to actual generated units in each time block or available capacity In proportion to actual generated units in each time block or available capacity 8 Revisions allowed per day Max. 16 revisions for wind and solar generators Max. 16 revisions for wind and solar generators Max. 16 revisions for wind and solar generators Max. 16 revisions for wind and max.9 revisions for solar 9 Telemetry and communication requirement Data relating to power generation parameters and weather related Data Data relating to power system output & parameters and weather related Data Data relating to power system output & parameters and weather related Data Data relating to power system output & parameters and weather related Data 10 Responsibility of providing telemetry and communication Wind/solar generator or QCA Qualified Coordinating Agency (QCA) Wind/solar generator or QCA Wind/solar generator or QCA 11 Time period for payment of deviation charges Within 10 days from issuance of invoice Within 10 days from issuance of invoice Not Covered Not Covered 12 Interest for late payment of deviation charges 0.04% per day for the period of delay 1.25% per month for the period of delay Not Covered Not Covered 13 BG/LC Required Not Covered Not Covered Not Covered Not Covered
  • 11. Gensol Group B)Comparative Study of F&S Regulation: Western & Central Region S.No. Particulars Gujarat (Draft) Maharashtra (Draft) Madhya Pradesh (Final) Jharkhand (Final) 1 Applicability Wind and solar generators connected to Intra-state T/D system & selling power within or outside the state. Wind and solar generators connected to Intra-state T/D system & Selling power within or outside the state provided that the capacity of the generator should be greater than or equal to 5 MW Wind Generators having installed capacity of 10 MW and above and Solar Generators having installed capacity of 5 MW and above and supplying power to ESCOMs or to third party or for self-consumption through open access and selling power within or outside the state. Wind and solar generators connected to Intra-state T/D system & Selling power within or outside the state provided that the capacity of the generator should be greater than or equal to 5 MW 2 Forecasting responsibility Wind and solar generator /QCA/ forecast by SLDC to be accepted QCA/ forecast by SLDC to be accepted Wind and solar generator /QCA/ forecast by SLDC to be accepted Wind and solar generator /QCA/ forecast by SLDC to be accepted 3 Scheduling responsibility Wind and solar generator or by QCA QCA Wind and solar generator or by QCA Wind and solar generator or by QCA 4 Tolerance band for DSM 12% for wind projects commissioned prior to 30.1.2010 and 8% for projects commissioned after 30.1.2010. 7% for existing and new solar project 15% for wind and solar generators for sale/supply of power within the state 15% for wind and solar generators for sale/supply of power within the state 15% for wind and solar generators for sale/supply of power within the state 5 Scheduling requirement Day ahead and 03 day ahead Day Ahead and week ahead Day ahead and week ahead Day ahead and week ahead 6 Reference point for DSM Pooling Station /Interconnection point to State Grid Pooling Station /Interconnection point to State Grid Pooling Station /Interconnection point to State Grid Pooling Station /Interconnection point to State Grid
  • 12. Gensol Group Comparative Study of F&S Regulations : Western & Central Region S.No. Particulars Gujarat (Draft) Maharashtra (Draft) Madhya Pradesh (Final) Jharkhand (Final) 7 Apportion of energy eeviation & DSM charges among RE generators at a Pooling S/S In proportion to actual generated units in each time block or available capacity or absolute error of individual generator In proportion to actual generated units in each time block In proportion to actual generated units in each time block or available capacity In proportion to actual generated units in each time block or available capacity 8 Revisions allowed per day Max. 16 revisions for wind and max. 8 revisions for solar Max. 16 revisions for wind and solar generators Max. 16 revisions for wind and solar generators Max. 16 revisions for wind and solar generators 9 Telemetry and communication requirement Data relating to power system output & parameters and weather related data Data relating to power generation parameters and weather related data Data relating to power system output & parameters and weather related data Data relating to power system output & parameters and weather related data 10 Responsibility of providing telemetry and communication Wind/solar generator or QCA QCA Wind/solar generator or QCA Wind/solar generator or QCA 11 Time period for payment of deviation charges Within 10 days from issuance of invoice Within 10 days from issuance of invoice Within 10 days from issuance of invoice Within 10 days from issuance of invoice 12 Interest for late payment of devation charges 0.04% per day for the period of delay 1.25% per month for the period of delay 0.04% per day for the period of delay Not Covered 13 BG/LC Required BG/Revolving LC covering DSM payment for 6 months Not Covered LC of 110% of average payable weekly liability for deviations in the previous financial year Not Covered
  • 13. Gensol Group C) Comparative Study of F&S Regulations : Eastern Region S.No. Particulars Manipur & Mizoram (Draft) Meghalaya (Final) Assam (Draft) Tripura (Final) 1 Applicability Wind and solar generators connected to Intra-state T/D system & Selling power within or outside the state Wind and solar generators connected to Intra-state T/D system & Selling power within or outside the state provided that the capacity of the generator should be greater than or equal to 1 MW Wind and solar generators connected to Intra-state T/D system & selling power within or outside the state Wind and solar generators connected to Intra-state T/D system & selling power within or outside the state 2 Forecasting responsibility Wind and solar generator /QCA/ forecast by SLDC to be accepted QCA/ forecast by SLDC to be accepted Wind and solar generator /QCA/ forecast by SLDC to be accepted Wind and solar generator /QCA/ forecast by SLDC to be accepted 3 Scheduling responsibility Wind and solar generator or by QCA QCA Wind and solar generator or by QCA Wind and solar generator or by QCA 4 Tolerance band for DSM 15% for wind and solar generators commissioned prior to 18.7.2016 and 10% for commissioned after 18.7.2016 for sale/supply of power within the state. 15% for wind and solar generators for sale/supply of power within the state 10% for wind and solar generators for sale/supply of power within the state 10% for wind and solar generators for sale/supply of power within the state 5 Scheduling requirement Day ahead and week ahead Day ahead and week ahead Day ahead and week ahead Day ahead and week ahead 6 Reference point for DSM Pooling Station /Interconnection point to State Grid Pooling Station /Interconnection point to State Grid Pooling Station /Interconnection point to State Grid Pooling Station /Interconnection point to State Grid
  • 14. Gensol Group Comparative Study of F&S Regulations : Eastern Region S.No. Particulars Manipur & Mizoram (Draft) Meghalaya (Final) Assam (Draft) Tripura (Final) 7 Apportion of energy deviation & DSM charges among RE generators at a Pooling S/S In proportion to actual generated units in each time block or available capacity In proportion to actual generated units in each time block or available capacity In proportion to actual generated units in each time block or available capacity In proportion to actual generated units in each time block or available capacity 8 Revisions allowed per day Max. 16 revisions for wind and solar generators Max. 16 revisions for wind and solar generators Max. 16 revisions for wind and max.9 revisions for solar Max. 16 revisions for wind and max.9 revisions for solar 9 Telemetry and communication requirement Data relating to power system output & parameters and weather related Data Data relating to power generation parameters and weather related Data Data relating to power system output & parameters and weather related Data Data relating to power system output & parameters and weather related Data 10 Responsibility of providing telemetry and communication Wind/solar generator or QCA QCA Wind/solar generator or QCA Wind/solar generator or QCA 11 Time period for payment of deviation charges Not Covered Within 10 days from issuance of invoice Not Covered Not Covered 12 Interest for late payment of deviation charges Not Covered 1.25% per month for the period of delay Not Covered Not Covered 13 BG/LC Required Not Covered LC for an amount equivalent to 1.5 times of average of weekly deviations amount for the past four settlement periods. Not Covered Not Covered
  • 15. Gensol Group D) Comparative Study of F&S Regulations : Southern Region S.No. Particulars Tamil Nadu (Draft) Telangana (Final) Karnataka (Final) Andhra Pradesh (Final) 1 Applicability Wind and solar generators connected to Intra-state T/D system & selling power within or outside the state Wind and solar generators connected to Intra-state T/D system & Selling power within or outside the state provided that the capacity of the generator should be greater than or equal to 5 MW Wind Generators having installed capacity of 10 MW and above and Solar Generators having installed capacity of 5 MW and above and supplying power to ESCOMs or to third party or for self-consumption through open access within or outside the state. Wind and solar generators connected to Intra-state T/D system & selling power within or outside the state 2 Forecasting responsibility QCA forecast by SLDC to be accepted Wind and solar generator /QCA/ forecast by SLDC to be accepted Wind and solar generator /QCA/ forecast by SLDC to be accepted Wind and solar generator /QCA/ forecast by SLDC to be accepted 3 Scheduling Responsibility QCA Wind and solar generator or by QCA Wind and solar generator or by QCA or through Aggregator Wind and solar generator or by QCA 4 Tolerance Band for DSM 10% for wind and solar generators for sale/supply of power within the state 15% for wind and solar generators for sale/supply of power within the state 15% for wind and solar generators for sale/supply of power within the state 15% for wind and solar generators for sale/supply of power within the state 5 Scheduling Requirement Day ahead and week ahead Day ahead and week ahead Day ahead and week ahead Day ahead and week ahead 6 Reference Point for DSM Pooling station /Interconnection point to State Grid Pooling Station /Interconnection point to State Grid Pooling Station /Interconnection point to State Grid Pooling Station /Interconnection point to State Grid
  • 16. Gensol Group Comparative Study of F&S Regulations : Southern Region S.No. Particulars Tamil Nadu (Draft) Telangana (Final) Karnataka (Final) Andhra Pradesh (Final) 7 Apportion of energy deviation & DSM charges among RE generators at a Pooling S/S In proportion to actual generated units in each time block or available capacity In proportion to energy injected in each time block In proportion to actual generated units in each time block or available capacity In proportion to actual generated units in each time block or available capacity 8 Revisions allowed per day Max. 16 revisions for wind and solar generators Max. 16 revisions for wind and max. 9 revisions for solar Max. 16 revisions for wind and solar generators Max. 16 revisions for wind and max.9 revisions for solar 9 Telemetry and communication requirement Data relating to power system output & parameters and weather related Data Data relating to power system output & parameters and weather related Data Data relating to power output,turbine availability and weather related Data Data relating to power generation parameters and weather related Data 10 Responsibility of providing telemetry and communication QCA Wind/solar generator Wind/solar generator or QCA or Aggregator Wind/solar generator or QCA 11 Time period for payment of deviation charges Within 10 days from issuance of invoice Within 10 days from issuance of invoice Within 10 days from issuance of invoice Not Covered 12 Interest for late payment of deviations charges 1.25% per month for the period of delay 0.04% per day for the period of delay 0.04% per day for the period of delay Not Covered 13 BG/LC Required Not Covered Bank guarantee or LC covering deviation settlement mechanism payment for 6 months Not Covered Not Covered
  • 17. Gensol is one of the leading consultants and system integrators for Solar Power Plants. We boast of a portfolio of over 6000 MW of Solar Photovoltaic Plants. Gensol is also a channel partner to Ministry of New & Renewable Energy and installs kW scale Solar Rooftop systems on a turnkey basis with more than 42 MW of cumulative installations across the country. The information contained herein is of a general nature and is not intended to address the circumstances of any particular individual or entity. Although we endeavor to provide accurate and timely information, there can be no guarantee that such information is accurate as of the date it is received or that it will continue to be accurate in the future. No one should act on such information without appropriate professional advice after a thorough examination of the particular situation. Email: solar@gensol.in | Web: www.gensol.in | Phone: +91 79 40068235 | Twitter: gensol_tweets Gensol Engineering Pvt Ltd | Gensol Consultants Pvt Ltd | Solarig Gensol Utilities Pvt Ltd Corporate Office A2, 12th Floor Palladium, Opp. to Vodafone House , Corporate Road, Prahladnagar, Ahmedabad, Gujarat. India - 380015