SlideShare a Scribd company logo
1 of 20
We have embraced challenges and as a consequence we
are proud that we provide projects in a wide range of ex-
pertise: multistage steel structures, dual structures with
walls and reinforced concrete,industrial buildings,wooden
structures and glued laminated timber, billboards, pergo-
las, skylights, walkways, top-down system infrastructures
and lining deep cavities, furnishings stores, churches: con-
solidation and new ones, feed mills, silos, tanks, compound
feed factories and buildings consolidation.
STRUCTURAL DESIGN & MORE
We provide full services in the area
of building design, from establishing
functionalities, choosing solution,
making primary sketches to struc-
tural shaping,computer assisted cal-
culations, multiple scenarios analy-
sis to drawing execution plans and
more, up to site supervision.
Combining
knowledge,
innovation,
training and
responsability
-
jects, and also proved that those projects can be built without
problems. Another key characteristic of DCTS team is continuous
care for resources usage resulting in highly economical projects
that use only necessary materials to ensure standards complianc-
es and safety building exploitation.
a project plan which describes all the processes in all the plan-
ning phases: Concept,Technical Project for Building Authorization,
Execution Project, Detailed Execution Project, Assisting the con-
struction works, As-Built Project.
Our versatile team that can and
-
gencies, regardless of building
destination, terrain conditions,
seismic activity and other fac-
tors.
mathematics, and ingenuity to develop solutions for technical problems. Engineers design materials, struc-
tures, and systems while considering the limitations imposed by practicality, regulation, safety, and cost.The
word engineer is derived from the Latin roots ingeniare (“to contrive, devise”) and ingenium (“cleverness”).
Engineering analysis proceeds by separating the engineering design into the mechanisms of operation or
failure, analyzing or estimating each component of the operation or failure mechanism in isolation, and re-
combining the components. They may analyse risk. Many engineers use computers to produce and analyze
FNC FAUREI
Compound feed factory
of 15 to/h capacity with
extension possibility to
30 to/h of pelleted feed
The investment is made up of two objectives, feed
mill and grain storage cells. FNC building is a 7 level
steel construction.The structure has a mixed system
of frames and braced frames. Floors are either steel
decks or concrete slabs.
The foundation system is a mat foundation and rests
on the ground through a ballast cushion.
Storage cells have a capacity of 2000 tons, approxi-
mately 2600mc. Three pieces are provided.
Cells are founded on a mat that rests on a cushion
of ballast.
Construction Equipment was provided by Buhler
Group.
The investment is based on European Founds and in
the project are integreted all the utillities.
One star indoor extensive chicken
farm
The farm has 4 production units of 12x60m, 12x85m and 2 of 12x90m, technical
rooms, feed silos and sanitary filter. The project particularity is the BIO conditions of
raising the chickens as for each unit there was provided a covered grassy garden with
fruit trees, plum and apple trees.
The structure has braced frames on one direction and trusses on the other. The enve-
lope is made of sandwich panels.
Grain storage expansion
Extension of storage grain silos with a battery
consisting of four cells, each 3000 tons.
Race pigeons accomodation
building
2 Levels building of 900sqm per level with visitors
facilities.
Grain dryer
Chicken Farms
1000 sqm surface
The purpose of this project
was the technical documen-
tation at the detailed design
to build the structures for the
oil sludge equipement that
fuels the clinker kiln. The
building is located between
cells 3 and 4 of the former
oven clinker 1, dismantled.
The building is buried in the
ground and a steel structure
above ground
EQUIPEMENT TO
FUEL THE OVEN
CLINKER
It was requested to increase storage capacity of Kerosene jet fuel by 2 tanks within 2 stages. The mini-
mum capacity requested it was of 2200 cubic meters and it should be operated with the same existing
plants (railroad self discharge, loading the car, transferring from one tank to another) and realization of
construction works to take over fuel spills (a new retention wall) and the access road to the new tanks to
Fuel tanks
-
signing and site surveing for
suspended ceillings, shop
windows, roller shutters, pe-
rimetral and partition walls,
-
evators and escalators, stairs
and all conections and struc-
tures for the hvac system.
VARIOUS RETAIL
SHOPS FITTING
Residential houses
Page 13
“Green houses” are now being built to expand the green concept out of com-
mercial buildings.
We incorporate in design solutions to urge people to aim for sustainability and
to help protect de environment.
Offices buiding
Page 15
-
ment slab is reinforced concrete. The structure had major cracks due
to seismic activitie that she was subject to and due to structural inter-
ventions made in order to extend the basement all over the building.
Because they wanted to bring the building to current standards of
strength and functionality proceeded to consolidation.Building meas-
ures were the introduction of reinforced concrete pillars, coating the
Neubau Medienzentrum Wien Contest
The building is made of reinforced concrete frames and walls made in monolithic structure.
Being a design contest focus was mainly on the architecture.The concept was realized by archi-
tect Mario Kuibus. On the part of the structure was carried out structural dimensioning and 3D
model of the structure.
Helsinki Central Library Contest
The building is mixed, both metal and concrete monolith.
Advertising
panels
22,20 m height steel structure with 4,50 m
width boxes.
10 boxes were designed to be mounted on
it.
Each box has 3 faces where advertising
panels can be mounted.
Monolithic reinforced concrete structure cast in steel formwork Doka type. BASF Cementitious water-
Indoor pool
18, Nicolae Grigorescu
Bucharest, Romania
Tel: 0721 308 407
Email: anamaria.popa@dcts.ro
www.dcts.ro

More Related Content

What's hot

Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Prasad Thanthratey
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Mayur Waghulde
 
Presentation on pre fabricated construction systems by noshad ahmed 15crp46
Presentation on pre fabricated construction systems by noshad ahmed 15crp46Presentation on pre fabricated construction systems by noshad ahmed 15crp46
Presentation on pre fabricated construction systems by noshad ahmed 15crp46Noshad Ahmed Wahocho
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure pptAbhishekM45
 
PREFABRICATED structure
   PREFABRICATED  structure   PREFABRICATED  structure
PREFABRICATED structuresathish sak
 
Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefabrication for improving Sustainability and Economics of Civil Engineerin...Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefabrication for improving Sustainability and Economics of Civil Engineerin...Ankit Singhai
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication constructionDivya Vishnoi
 
Metropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportMetropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportKelvin Ng
 
High rise building case study
High rise building case study High rise building case study
High rise building case study VISHAKA BOTHRA
 
Prefabricated structures in UK
Prefabricated structures in UKPrefabricated structures in UK
Prefabricated structures in UKsanthitunuguntla
 
Prefabrication - building construction
Prefabrication - building constructionPrefabrication - building construction
Prefabrication - building constructionMoksha Bhatia
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in constructionShailja km
 
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost constructionManisha Singh
 

What's hot (20)

Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)
 
ADNEC & ABU DHABI
ADNEC & ABU DHABIADNEC & ABU DHABI
ADNEC & ABU DHABI
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.
 
Presentation on pre fabricated construction systems by noshad ahmed 15crp46
Presentation on pre fabricated construction systems by noshad ahmed 15crp46Presentation on pre fabricated construction systems by noshad ahmed 15crp46
Presentation on pre fabricated construction systems by noshad ahmed 15crp46
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
AR Gunnar Birkerts
AR Gunnar BirkertsAR Gunnar Birkerts
AR Gunnar Birkerts
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
 
PREFABRICATED structure
   PREFABRICATED  structure   PREFABRICATED  structure
PREFABRICATED structure
 
Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefabrication for improving Sustainability and Economics of Civil Engineerin...Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefabrication for improving Sustainability and Economics of Civil Engineerin...
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 
Metropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportMetropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design Report
 
aaaaaaaaaaa.pdf
aaaaaaaaaaa.pdfaaaaaaaaaaa.pdf
aaaaaaaaaaa.pdf
 
Pearl river tower,
Pearl river tower,Pearl river tower,
Pearl river tower,
 
Prefabricated structure
Prefabricated structurePrefabricated structure
Prefabricated structure
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
 
Prefabricated structures in UK
Prefabricated structures in UKPrefabricated structures in UK
Prefabricated structures in UK
 
Prefabrication - building construction
Prefabrication - building constructionPrefabrication - building construction
Prefabrication - building construction
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in construction
 
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost construction
 

Viewers also liked

October 22
October 22October 22
October 22hh1neke
 
видение, миссия, цели и внутренние ограничения
видение, миссия, цели и внутренние ограничениявидение, миссия, цели и внутренние ограничения
видение, миссия, цели и внутренние ограниченияolgasivkova1
 
File Processing - Batch Process Execution
File Processing - Batch Process ExecutionFile Processing - Batch Process Execution
File Processing - Batch Process ExecutionAbimael Desales López
 
April 15
April 15April 15
April 15hh1neke
 
2015/03/26(木) Edison勉強会 博士のプレゼン
2015/03/26(木) Edison勉強会 博士のプレゼン2015/03/26(木) Edison勉強会 博士のプレゼン
2015/03/26(木) Edison勉強会 博士のプレゼンYuta Kitagami
 
1903 w f-le phare de la tour de sion (octobre 1903 n°1-réimpression)
1903 w f-le phare de la tour de sion (octobre 1903 n°1-réimpression)1903 w f-le phare de la tour de sion (octobre 1903 n°1-réimpression)
1903 w f-le phare de la tour de sion (octobre 1903 n°1-réimpression)ourbothy
 
RunMob Presentation 2014
RunMob Presentation 2014RunMob Presentation 2014
RunMob Presentation 2014RunMob
 
Dzmerayin chambar 2015-gexarvest
Dzmerayin chambar 2015-gexarvestDzmerayin chambar 2015-gexarvest
Dzmerayin chambar 2015-gexarvest67gayane
 
Reducing the risks of nonstructural earthquake damage
Reducing the risks of nonstructural earthquake damageReducing the risks of nonstructural earthquake damage
Reducing the risks of nonstructural earthquake damageAna-Maria Popa
 
Կիսամյակային հաշվետվություն
Կիսամյակային հաշվետվությունԿիսամյակային հաշվետվություն
Կիսամյակային հաշվետվություն67gayane
 
Slaidi premium medical_ru_septembris
Slaidi premium medical_ru_septembrisSlaidi premium medical_ru_septembris
Slaidi premium medical_ru_septembrisPremiumMedical
 
Advokatfirmaet Vogt & Wiig AS - En presentasjon av vår personskadeavdeling
Advokatfirmaet Vogt & Wiig AS - En presentasjon av vår personskadeavdelingAdvokatfirmaet Vogt & Wiig AS - En presentasjon av vår personskadeavdeling
Advokatfirmaet Vogt & Wiig AS - En presentasjon av vår personskadeavdelingLawfirm
 
Lessons learned on
Lessons learned onLessons learned on
Lessons learned ondusk9000
 
Hawkins kaiser module_4
Hawkins kaiser module_4Hawkins kaiser module_4
Hawkins kaiser module_4InnovateLTC
 

Viewers also liked (20)

October 22
October 22October 22
October 22
 
Junija piedavajums lv
Junija piedavajums lvJunija piedavajums lv
Junija piedavajums lv
 
видение, миссия, цели и внутренние ограничения
видение, миссия, цели и внутренние ограничениявидение, миссия, цели и внутренние ограничения
видение, миссия, цели и внутренние ограничения
 
File Processing - Batch Process Execution
File Processing - Batch Process ExecutionFile Processing - Batch Process Execution
File Processing - Batch Process Execution
 
April 15
April 15April 15
April 15
 
2015/03/26(木) Edison勉強会 博士のプレゼン
2015/03/26(木) Edison勉強会 博士のプレゼン2015/03/26(木) Edison勉強会 博士のプレゼン
2015/03/26(木) Edison勉強会 博士のプレゼン
 
KU7 | Reunion | Sara Räsänen
KU7 | Reunion | Sara RäsänenKU7 | Reunion | Sara Räsänen
KU7 | Reunion | Sara Räsänen
 
Malawi
MalawiMalawi
Malawi
 
1903 w f-le phare de la tour de sion (octobre 1903 n°1-réimpression)
1903 w f-le phare de la tour de sion (octobre 1903 n°1-réimpression)1903 w f-le phare de la tour de sion (octobre 1903 n°1-réimpression)
1903 w f-le phare de la tour de sion (octobre 1903 n°1-réimpression)
 
RunMob Presentation 2014
RunMob Presentation 2014RunMob Presentation 2014
RunMob Presentation 2014
 
Dzmerayin chambar 2015-gexarvest
Dzmerayin chambar 2015-gexarvestDzmerayin chambar 2015-gexarvest
Dzmerayin chambar 2015-gexarvest
 
Reducing the risks of nonstructural earthquake damage
Reducing the risks of nonstructural earthquake damageReducing the risks of nonstructural earthquake damage
Reducing the risks of nonstructural earthquake damage
 
Janvaris ru 2012
Janvaris ru 2012Janvaris ru 2012
Janvaris ru 2012
 
Կիսամյակային հաշվետվություն
Կիսամյակային հաշվետվությունԿիսամյակային հաշվետվություն
Կիսամյակային հաշվետվություն
 
Slaidi premium medical_ru_septembris
Slaidi premium medical_ru_septembrisSlaidi premium medical_ru_septembris
Slaidi premium medical_ru_septembris
 
Advokatfirmaet Vogt & Wiig AS - En presentasjon av vår personskadeavdeling
Advokatfirmaet Vogt & Wiig AS - En presentasjon av vår personskadeavdelingAdvokatfirmaet Vogt & Wiig AS - En presentasjon av vår personskadeavdeling
Advokatfirmaet Vogt & Wiig AS - En presentasjon av vår personskadeavdeling
 
Lessons learned on
Lessons learned onLessons learned on
Lessons learned on
 
Hawkins kaiser module_4
Hawkins kaiser module_4Hawkins kaiser module_4
Hawkins kaiser module_4
 
Predlozhenije 06.2011
Predlozhenije 06.2011Predlozhenije 06.2011
Predlozhenije 06.2011
 
KU7 | peppinasuutarinen_1
KU7 | peppinasuutarinen_1KU7 | peppinasuutarinen_1
KU7 | peppinasuutarinen_1
 

Similar to Providing Structural Design and More for All Your Building Needs

PRESENTATION - Modular Direct
PRESENTATION - Modular DirectPRESENTATION - Modular Direct
PRESENTATION - Modular DirectStephen Fleming
 
Architecture as technology and case studies
Architecture as technology and case studiesArchitecture as technology and case studies
Architecture as technology and case studiesLamaJassim1
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016Steve Edgson
 
Appropriate technology part 2
Appropriate technology   part 2Appropriate technology   part 2
Appropriate technology part 2Shirish Avrani
 
Durasteel projects ref..
Durasteel projects ref..Durasteel projects ref..
Durasteel projects ref..utlhyd
 
Kemp Hospice Development proposal
Kemp Hospice Development proposalKemp Hospice Development proposal
Kemp Hospice Development proposalKempHospice
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typChristian Akl
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typChristian Akl
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian Akl
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Arafat Akash
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder PortfolioDominic Holder
 
Adrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist PortfolioAdrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist PortfolioAdrian Navarro
 
DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI
DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAIDYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI
DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAIpadamatikona swapnika
 
Building of the gui'an innovation park
Building of the gui'an innovation parkBuilding of the gui'an innovation park
Building of the gui'an innovation parkİrfan Meriç
 

Similar to Providing Structural Design and More for All Your Building Needs (20)

PRESENTATION - Modular Direct
PRESENTATION - Modular DirectPRESENTATION - Modular Direct
PRESENTATION - Modular Direct
 
Article_Proof
Article_ProofArticle_Proof
Article_Proof
 
Architecture as technology and case studies
Architecture as technology and case studiesArchitecture as technology and case studies
Architecture as technology and case studies
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016
 
Appropriate technology part 2
Appropriate technology   part 2Appropriate technology   part 2
Appropriate technology part 2
 
Durasteel projects ref..
Durasteel projects ref..Durasteel projects ref..
Durasteel projects ref..
 
Kemp Hospice Development proposal
Kemp Hospice Development proposalKemp Hospice Development proposal
Kemp Hospice Development proposal
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOC
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Sb05
Sb05Sb05
Sb05
 
Adrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist PortfolioAdrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist Portfolio
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI
DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAIDYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI
DYNAMIC/ DA VINCI/ROTATING TOWER,DUBAI
 
duplex villa ppt
duplex villa pptduplex villa ppt
duplex villa ppt
 
CASE STUDY
CASE STUDYCASE STUDY
CASE STUDY
 
Case study 2.pptx
Case study 2.pptxCase study 2.pptx
Case study 2.pptx
 
Building of the gui'an innovation park
Building of the gui'an innovation parkBuilding of the gui'an innovation park
Building of the gui'an innovation park
 

More from Ana-Maria Popa

CALCULUL SEISMIC AL REZERVOARELOR METALICE CILINDRICE- Partea I
CALCULUL SEISMIC AL REZERVOARELOR METALICE CILINDRICE- Partea ICALCULUL SEISMIC AL REZERVOARELOR METALICE CILINDRICE- Partea I
CALCULUL SEISMIC AL REZERVOARELOR METALICE CILINDRICE- Partea IAna-Maria Popa
 
Articol revista aicps 1 2 2016
Articol revista aicps 1 2 2016Articol revista aicps 1 2 2016
Articol revista aicps 1 2 2016Ana-Maria Popa
 
Code Compliance and Execution
Code Compliance and ExecutionCode Compliance and Execution
Code Compliance and ExecutionAna-Maria Popa
 
DCTS - Projets sélectionnés
DCTS -  Projets sélectionnésDCTS -  Projets sélectionnés
DCTS - Projets sélectionnésAna-Maria Popa
 
DCTS - Selection of projects
DCTS - Selection of projectsDCTS - Selection of projects
DCTS - Selection of projectsAna-Maria Popa
 
Ceilling structural works
Ceilling structural worksCeilling structural works
Ceilling structural worksAna-Maria Popa
 
DCTS selection of reference works in FNC field
DCTS selection of reference works in FNC fieldDCTS selection of reference works in FNC field
DCTS selection of reference works in FNC fieldAna-Maria Popa
 

More from Ana-Maria Popa (9)

CALCULUL SEISMIC AL REZERVOARELOR METALICE CILINDRICE- Partea I
CALCULUL SEISMIC AL REZERVOARELOR METALICE CILINDRICE- Partea ICALCULUL SEISMIC AL REZERVOARELOR METALICE CILINDRICE- Partea I
CALCULUL SEISMIC AL REZERVOARELOR METALICE CILINDRICE- Partea I
 
Articol revista aicps 1 2 2016
Articol revista aicps 1 2 2016Articol revista aicps 1 2 2016
Articol revista aicps 1 2 2016
 
Code Compliance and Execution
Code Compliance and ExecutionCode Compliance and Execution
Code Compliance and Execution
 
DCTS - Projets sélectionnés
DCTS -  Projets sélectionnésDCTS -  Projets sélectionnés
DCTS - Projets sélectionnés
 
DCTS - Selection of projects
DCTS - Selection of projectsDCTS - Selection of projects
DCTS - Selection of projects
 
DCTS in Numbers
DCTS in NumbersDCTS in Numbers
DCTS in Numbers
 
Analiza modala
Analiza modalaAnaliza modala
Analiza modala
 
Ceilling structural works
Ceilling structural worksCeilling structural works
Ceilling structural works
 
DCTS selection of reference works in FNC field
DCTS selection of reference works in FNC fieldDCTS selection of reference works in FNC field
DCTS selection of reference works in FNC field
 

Recently uploaded

LCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition RevisedLCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition RevisedTom Blefko
 
Kolte Patil Universe Hinjewadi Pune Brochure.pdf
Kolte Patil Universe Hinjewadi Pune Brochure.pdfKolte Patil Universe Hinjewadi Pune Brochure.pdf
Kolte Patil Universe Hinjewadi Pune Brochure.pdfPrachiRudram
 
Listing Turkey - Viva Perla Maltepe Catalog
Listing Turkey - Viva Perla Maltepe CatalogListing Turkey - Viva Perla Maltepe Catalog
Listing Turkey - Viva Perla Maltepe CatalogListing Turkey
 
Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...
Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...
Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...Clemson Engineering Consultant
 
Shriram Hebbal One Kempapura Bangalore E- Brochure.pdf
Shriram Hebbal One Kempapura Bangalore E- Brochure.pdfShriram Hebbal One Kempapura Bangalore E- Brochure.pdf
Shriram Hebbal One Kempapura Bangalore E- Brochure.pdffaheemali990101
 
Prestige Sector 94 at Noida E Brochure.pdf
Prestige Sector 94 at Noida E Brochure.pdfPrestige Sector 94 at Noida E Brochure.pdf
Prestige Sector 94 at Noida E Brochure.pdfsarak0han45400
 
Listing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog IstanbulListing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog IstanbulListing Turkey
 
Purva Park Hill Kanakapura Road Bangalore.pdf
Purva Park Hill  Kanakapura Road Bangalore.pdfPurva Park Hill  Kanakapura Road Bangalore.pdf
Purva Park Hill Kanakapura Road Bangalore.pdfashiyadav24
 
Ganga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdfGanga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdfanjalisaini334541
 
Fractional Ownership Vs Physical Ownership.pdf
Fractional Ownership Vs Physical Ownership.pdfFractional Ownership Vs Physical Ownership.pdf
Fractional Ownership Vs Physical Ownership.pdfHavendaxa
 
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdf
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdfSaheel ITREND Futura At Baner Annexe Pune - PDF.pdf
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdfmonikasharma630
 
What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024Paul Smith
 
Kohinoor Hinjewadi Phase 2 In Pune - PDF.pdf
Kohinoor Hinjewadi Phase 2 In Pune - PDF.pdfKohinoor Hinjewadi Phase 2 In Pune - PDF.pdf
Kohinoor Hinjewadi Phase 2 In Pune - PDF.pdfmonikasharma630
 
The Role of Mortgage Brokers in Retirement Housing: Key Considerations
The Role of Mortgage Brokers in Retirement Housing: Key ConsiderationsThe Role of Mortgage Brokers in Retirement Housing: Key Considerations
The Role of Mortgage Brokers in Retirement Housing: Key Considerationssunlite Mortgage
 
Vilas Javdekar Yashwin Enchante Pune E-Brochure .pdf
Vilas Javdekar Yashwin Enchante Pune  E-Brochure .pdfVilas Javdekar Yashwin Enchante Pune  E-Brochure .pdf
Vilas Javdekar Yashwin Enchante Pune E-Brochure .pdfManishSaxena95
 
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your SpaceShapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Spaceaidasheikh47
 
Mahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdfMahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdfPrachiRudram
 
Experion Elements Sector 45 Noida_Brochure.pdf.pdf
Experion Elements Sector 45 Noida_Brochure.pdf.pdfExperion Elements Sector 45 Noida_Brochure.pdf.pdf
Experion Elements Sector 45 Noida_Brochure.pdf.pdfkratirudram
 
Raymond Ten X Era Viviana Mall Thane Brochure.pdf
Raymond Ten X Era Viviana Mall Thane Brochure.pdfRaymond Ten X Era Viviana Mall Thane Brochure.pdf
Raymond Ten X Era Viviana Mall Thane Brochure.pdfPrachiRudram
 
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdfProvident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdffaheemali990101
 

Recently uploaded (20)

LCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition RevisedLCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
 
Kolte Patil Universe Hinjewadi Pune Brochure.pdf
Kolte Patil Universe Hinjewadi Pune Brochure.pdfKolte Patil Universe Hinjewadi Pune Brochure.pdf
Kolte Patil Universe Hinjewadi Pune Brochure.pdf
 
Listing Turkey - Viva Perla Maltepe Catalog
Listing Turkey - Viva Perla Maltepe CatalogListing Turkey - Viva Perla Maltepe Catalog
Listing Turkey - Viva Perla Maltepe Catalog
 
Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...
Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...
Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...
 
Shriram Hebbal One Kempapura Bangalore E- Brochure.pdf
Shriram Hebbal One Kempapura Bangalore E- Brochure.pdfShriram Hebbal One Kempapura Bangalore E- Brochure.pdf
Shriram Hebbal One Kempapura Bangalore E- Brochure.pdf
 
Prestige Sector 94 at Noida E Brochure.pdf
Prestige Sector 94 at Noida E Brochure.pdfPrestige Sector 94 at Noida E Brochure.pdf
Prestige Sector 94 at Noida E Brochure.pdf
 
Listing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog IstanbulListing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog Istanbul
 
Purva Park Hill Kanakapura Road Bangalore.pdf
Purva Park Hill  Kanakapura Road Bangalore.pdfPurva Park Hill  Kanakapura Road Bangalore.pdf
Purva Park Hill Kanakapura Road Bangalore.pdf
 
Ganga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdfGanga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdf
 
Fractional Ownership Vs Physical Ownership.pdf
Fractional Ownership Vs Physical Ownership.pdfFractional Ownership Vs Physical Ownership.pdf
Fractional Ownership Vs Physical Ownership.pdf
 
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdf
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdfSaheel ITREND Futura At Baner Annexe Pune - PDF.pdf
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdf
 
What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024
 
Kohinoor Hinjewadi Phase 2 In Pune - PDF.pdf
Kohinoor Hinjewadi Phase 2 In Pune - PDF.pdfKohinoor Hinjewadi Phase 2 In Pune - PDF.pdf
Kohinoor Hinjewadi Phase 2 In Pune - PDF.pdf
 
The Role of Mortgage Brokers in Retirement Housing: Key Considerations
The Role of Mortgage Brokers in Retirement Housing: Key ConsiderationsThe Role of Mortgage Brokers in Retirement Housing: Key Considerations
The Role of Mortgage Brokers in Retirement Housing: Key Considerations
 
Vilas Javdekar Yashwin Enchante Pune E-Brochure .pdf
Vilas Javdekar Yashwin Enchante Pune  E-Brochure .pdfVilas Javdekar Yashwin Enchante Pune  E-Brochure .pdf
Vilas Javdekar Yashwin Enchante Pune E-Brochure .pdf
 
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your SpaceShapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
 
Mahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdfMahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdf
 
Experion Elements Sector 45 Noida_Brochure.pdf.pdf
Experion Elements Sector 45 Noida_Brochure.pdf.pdfExperion Elements Sector 45 Noida_Brochure.pdf.pdf
Experion Elements Sector 45 Noida_Brochure.pdf.pdf
 
Raymond Ten X Era Viviana Mall Thane Brochure.pdf
Raymond Ten X Era Viviana Mall Thane Brochure.pdfRaymond Ten X Era Viviana Mall Thane Brochure.pdf
Raymond Ten X Era Viviana Mall Thane Brochure.pdf
 
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdfProvident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
 

Providing Structural Design and More for All Your Building Needs

  • 1.
  • 2. We have embraced challenges and as a consequence we are proud that we provide projects in a wide range of ex- pertise: multistage steel structures, dual structures with walls and reinforced concrete,industrial buildings,wooden structures and glued laminated timber, billboards, pergo- las, skylights, walkways, top-down system infrastructures and lining deep cavities, furnishings stores, churches: con- solidation and new ones, feed mills, silos, tanks, compound feed factories and buildings consolidation. STRUCTURAL DESIGN & MORE We provide full services in the area of building design, from establishing functionalities, choosing solution, making primary sketches to struc- tural shaping,computer assisted cal- culations, multiple scenarios analy- sis to drawing execution plans and more, up to site supervision. Combining knowledge, innovation, training and responsability
  • 3. - jects, and also proved that those projects can be built without problems. Another key characteristic of DCTS team is continuous care for resources usage resulting in highly economical projects that use only necessary materials to ensure standards complianc- es and safety building exploitation. a project plan which describes all the processes in all the plan- ning phases: Concept,Technical Project for Building Authorization, Execution Project, Detailed Execution Project, Assisting the con- struction works, As-Built Project. Our versatile team that can and - gencies, regardless of building destination, terrain conditions, seismic activity and other fac- tors. mathematics, and ingenuity to develop solutions for technical problems. Engineers design materials, struc- tures, and systems while considering the limitations imposed by practicality, regulation, safety, and cost.The word engineer is derived from the Latin roots ingeniare (“to contrive, devise”) and ingenium (“cleverness”). Engineering analysis proceeds by separating the engineering design into the mechanisms of operation or failure, analyzing or estimating each component of the operation or failure mechanism in isolation, and re- combining the components. They may analyse risk. Many engineers use computers to produce and analyze
  • 4. FNC FAUREI Compound feed factory of 15 to/h capacity with extension possibility to 30 to/h of pelleted feed
  • 5. The investment is made up of two objectives, feed mill and grain storage cells. FNC building is a 7 level steel construction.The structure has a mixed system of frames and braced frames. Floors are either steel decks or concrete slabs. The foundation system is a mat foundation and rests on the ground through a ballast cushion. Storage cells have a capacity of 2000 tons, approxi- mately 2600mc. Three pieces are provided. Cells are founded on a mat that rests on a cushion of ballast. Construction Equipment was provided by Buhler Group. The investment is based on European Founds and in the project are integreted all the utillities.
  • 6. One star indoor extensive chicken farm The farm has 4 production units of 12x60m, 12x85m and 2 of 12x90m, technical rooms, feed silos and sanitary filter. The project particularity is the BIO conditions of raising the chickens as for each unit there was provided a covered grassy garden with fruit trees, plum and apple trees. The structure has braced frames on one direction and trusses on the other. The enve- lope is made of sandwich panels. Grain storage expansion Extension of storage grain silos with a battery consisting of four cells, each 3000 tons. Race pigeons accomodation building 2 Levels building of 900sqm per level with visitors facilities.
  • 8. The purpose of this project was the technical documen- tation at the detailed design to build the structures for the oil sludge equipement that fuels the clinker kiln. The building is located between cells 3 and 4 of the former oven clinker 1, dismantled. The building is buried in the ground and a steel structure above ground EQUIPEMENT TO FUEL THE OVEN CLINKER
  • 9. It was requested to increase storage capacity of Kerosene jet fuel by 2 tanks within 2 stages. The mini- mum capacity requested it was of 2200 cubic meters and it should be operated with the same existing plants (railroad self discharge, loading the car, transferring from one tank to another) and realization of construction works to take over fuel spills (a new retention wall) and the access road to the new tanks to Fuel tanks
  • 10. - signing and site surveing for suspended ceillings, shop windows, roller shutters, pe- rimetral and partition walls, - evators and escalators, stairs and all conections and struc- tures for the hvac system. VARIOUS RETAIL SHOPS FITTING
  • 11.
  • 13. Page 13 “Green houses” are now being built to expand the green concept out of com- mercial buildings. We incorporate in design solutions to urge people to aim for sustainability and to help protect de environment.
  • 14.
  • 15. Offices buiding Page 15 - ment slab is reinforced concrete. The structure had major cracks due to seismic activitie that she was subject to and due to structural inter- ventions made in order to extend the basement all over the building. Because they wanted to bring the building to current standards of strength and functionality proceeded to consolidation.Building meas- ures were the introduction of reinforced concrete pillars, coating the
  • 16. Neubau Medienzentrum Wien Contest The building is made of reinforced concrete frames and walls made in monolithic structure. Being a design contest focus was mainly on the architecture.The concept was realized by archi- tect Mario Kuibus. On the part of the structure was carried out structural dimensioning and 3D model of the structure. Helsinki Central Library Contest The building is mixed, both metal and concrete monolith.
  • 17.
  • 18. Advertising panels 22,20 m height steel structure with 4,50 m width boxes. 10 boxes were designed to be mounted on it. Each box has 3 faces where advertising panels can be mounted.
  • 19. Monolithic reinforced concrete structure cast in steel formwork Doka type. BASF Cementitious water- Indoor pool
  • 20. 18, Nicolae Grigorescu Bucharest, Romania Tel: 0721 308 407 Email: anamaria.popa@dcts.ro www.dcts.ro