Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Headfirst and All In - Autotrader's learnings on adopting Kubernetes at speed with Vibrato (Session sponsored by Vibrato) - AWS Summit Sydney

50 views

Published on

Embarking on a journey to fully adopt Kubernetes, transform to CI/CD, and build and launch a new brand all at once was a courageous decision. At the start of 2018 the Carsguide engineering team set a goal to "Move with speed and have pipelines deliver software in sub 5 minutes" and engaged Vibrato to help. The existing release pipelines slowed developers, with it taking up to 45 Minutes for an engineer to know if their code actually worked. Looking back after a successful product launch of Autotrader in Australia in late 2018 - the Vibrato and Carsguide team will talk about all the lessons learned in going from zero containerisation to production Kubernetes in months.

  • Be the first to comment

  • Be the first to like this

Headfirst and All In - Autotrader's learnings on adopting Kubernetes at speed with Vibrato (Session sponsored by Vibrato) - AWS Summit Sydney

  1. 1. ALL IN HEAD FIRST WITH KUBERNETES
  2. 2. New Brand Launch Faster Software Release Increased Engineer Effectiveness Cost Efficiency
  3. 3. BUSINESS "SHOW US VALIDATION" ENGINEERS "OUR PIPELINES ARE SLOW" TECHNOLOGY "IS KUBERNETES TOO MUCH OF A JUMP?"
  4. 4. SEEK HELP
  5. 5. IaaS CaaS PaaS FaaS SaaS
  6. 6. the learning curve
  7. 7. that's just like your opinion, man© Universal Pictures Home Entertainment.
  8. 8. Bin Packing Flexibility Control Scale Speed Catalogues of Tools
  9. 9. KUBERNETES IS PRODUCTION READY
  10. 10. • • • • • vs
  11. 11. this is fine
  12. 12. IS YOUR TEAM READY?
  13. 13. 2018 Engineering Effectiveness 2.5 3 3.5 4 1 2 3 4 Series1 Series2 Series3 Series4 Series5 Series6 Series7 Series8
  14. 14. 4 4.2 4.4 4.6 4.8 1 2 3 4 Series1 Series2 Series3 Series4 Series5 2018 Engineering Confidence
  15. 15. THE MATH IS THERE 5 builds x 40 minutes saving = 200 minutes 200 minutes x 25 engineers = 5000 minutes 5000 minutes x 265 days a year = 1325000 minutes 1325000 minutes / 60 = 22 083 hours 22 083 hours x average $50 per hour staff cost = $1.1 Million dollars
  16. 16. ● ● ● ● ● ● TAKEAWAYS
  17. 17. LINKEDIN.COM/IN/JAMIELENNOX/ WWW.VIBRATO.COM.AU LINKEDIN.COM/IN/RICHARD-SANDS- B41899109/ ENGINEERING.CARSGUIDE.COM.AU ANY QUESTIONS? COME AND TALK TO US AT BOOTH E9!

×