SlideShare a Scribd company logo
1 of 25
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                                                               W



                                    CONFIDENTIAL


                                                         CONFIDENTIAL
                                                         Structured Finance - PPP



                                                                                                                                                               P

                                                         Public-Private Partnership KenGen
                                                         Proposed Models and Projects

                                    Document             Eddy Njoroge, MD&CEO of KenGen
                                    Date
                                                         17 May 2012 - Nairobi, Kenya


                                                            Disclaimer:
                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinseyreport may be circulated, quoted, or reproduced for distribution without prior written
                                                            No part of this & Company during an oral
Source:                  Source     presentation; it is not a complete record of theAll the information contained herein was prepared for information only.
                                                            approval from KenGen. discussion.
                                                                                                                                                        1
OUTLINE:
Unit of measure




              1 Background                                    W




              2 KenGen Proposed PPP Models

              3 KenGen’s Proposed Phase I: PPP Projects
                                                              P




              4 Discussions




          *        Footnote
Source:            Source                                 2
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                      W



                                    CONFIDENTIAL




                                                                                                                      P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  3
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                      W



                                    CONFIDENTIAL




                                                                                                                      P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  4
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                      W



                                    CONFIDENTIAL




                                                                                                                      P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  5
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                      W



                                    CONFIDENTIAL




                                                                                                                      P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  6
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                      W



                                    CONFIDENTIAL




                                                                                                                      P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  7
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                      W



                                    CONFIDENTIAL




                                                                                                                      P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  8
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                      W



                                    CONFIDENTIAL




                                                                                                                      P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  9
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                       W



                                    CONFIDENTIAL




                                                                                                                       P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  10
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                       W



                                    CONFIDENTIAL




                                                                                                                       P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  11
Financing KenGen’s Olkaria I & IV 280MW Flagship Projects
 Unit of measure
                                 With Drilling Costs



                                                                    W




                                                                    P




                  *   Footnote
 Source:
Source: KenGen;       Source                                   12
Financing KenGen’s Olkaria I & IV 280MW Flagship Projects
 Unit of measure
                                 Without Drilling Costs



                                                                    W




                                                                    P




                  *   Footnote
 Source:
Source: KenGen;       Source                                   13
OUTLINE:
Unit of measure




              1 Background                                     W




              2 KenGen Proposed PPP Models

              3 KenGen’s Proposed Phase I: PPP Projects
                                                               P




              4 Discussions




          *        Footnote
Source:            Source                                 14
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                       W



                                    CONFIDENTIAL




                                                                                                                       P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  15
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                       W



                                    CONFIDENTIAL




                                                                                                                       P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  16
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                       W



                                    CONFIDENTIAL




                                                                                                                       P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  17
Working Draft
Unit of measure
  Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time
    Printed 12/03/2007 15:47:35 South Africa Standard Time




                                                                                                                       W



                                    CONFIDENTIAL




                                                                                                                       P




                                    Document
                                    Date



                                    This report is solely for the use of client personnel. No part of it may be
                                    circulated, quoted, or reproduced for distribution outside the client
                                    organization without prior written approval from McKinsey & Company.
            *            Footnote   This material was used by McKinsey & Company during an oral
Source:                  Source     presentation; it is not a complete record of the discussion.                  18
OUTLINE:
Unit of measure




              1 Background                                     W




              2 KenGen Proposed PPP Models

              3 KenGen’s Proposed Phase I: PPP Projects
                                                               P




              4 Discussions




          *        Footnote
Source:            Source                                 19
3 Phase I: PPP Project: Muhoroni 80MW Power Plant
 Unit of measure
                                                                          BOT        – Build Operate Transfer
                                                                          PPA        – Power Purchase Agreement



                      Project Description
                                                                                                                  W




                      1.   Name:              Muhoroni Thermal Power Plant

                      1.   Capacity: 80MW

                      1.   Estimated Cost:    US$ 100 million

                      1.   Economic Life:     20 years                                                            P




                      1.   Mode:              Thermal –Heavy Fuel Oil (HFO)

                      1.   Expected PPP:      BOT (Vendor Financing…)

                      1.   Location: Western Kenya

                      1.   Status:
                                                         1. Tender documents under preparation
                                                         2. PPA being prepared
                 *          Footnote
 Source:
Source: KenGen; TMO         Source                                                                        20
3 Phase I: PPP Project: Olkaria V 140MW Power Plant
 Unit of measure                                                           BOT        – Build Operate Transfer
                                                                           PPA        – Power Purchase Agreement



                      Project Description

                                                                                                                   W



                      1.   Name:               Olkaria V Power Plant

                      1.   Capacity: 140MW

                      1.   Estimated Cost:     US$ 500 million (~US$ 200m for Power Plant only)

                      1.   Economic Life:      25 years                                                            P




                      1.   Mode:               Geothermal

                      1.   Expected PPP:       Joint Venture through an SPV (Special Purpose Vehicle…)

                      1.   Location: Naivasha, Kenya

                      1.   Status:
                                                          1. Drilling and Steam Optimization Study -
                      Completion 2012
                                                          2. PPA being prepared
                 *         Footnote
 Source:
Source: KenGen; TMO        Source                                                                          21
3 Phase I: PPP Project: Isiolo Wind Power Plant
 Unit of measure                                                                BOT            – Build Operate Transfer
                                                                                PPA            – Power Purchase Agreement



                      Project Description

                                                                                                                            W



                      1.   Name:                Isiolo Wind Power Plant

                      1.   Capacity: 150 MW (Phase I: 50MW plus Phase II: 100MW)

                      1.   Estimated Cost:      US$ 400 million (Phase I: US$ 130 plus Phase II: US$ 270MW)

                      1.   Economic Life:       20 years                                                                    P




                      1.   Mode:                Wind

                      1.   Expected PPP:        Joint Venture through an SPV (Special Purpose Vehicle…)

                      1.   Location: Isiolo, Northern Kenya

                      1.   Status:
                                                              1. Feasibility Study Completed


                 *          Footnote
 Source:
Source: KenGen; TMO         Source                                                                                  22
3 Phase I: PPP Project: Liquefied Natural Gas (LNG) Power Plant
 Unit of measure
                                                                           BOT        – Build Operate Transfer
                                                                           PPA        – Power Purchase Agreement


                      Project Description

                                                                                                                   W



                      1.   Name:              LNG Power Plant

                      1.   Capacity: 495 MW

                      1.   Estimated Cost:    US$ 686 million

                      1.   Economic Life:     20 years
                                                                                                                   P




                      1.   Mode:              Natural Gas (imported)

                      1.   Expected PPP:      BOT

                      1.   Location: Dongo Kundu, Mombasa Kenya

                      1.   Status:
                                                         1. Feasibility Study Completed


                 *          Footnote
 Source:
Source: KenGen; TMO         Source                                                                         23
3 Phase I: PPP Project: Coal Power Plant
 Unit of measure
                                                                              BOT         – Build Operate Transfer
                                                                              PPA         – Power Purchase Agreement




                      Project Description                                                                              W




                      1.   Name:                Coal Power Plant

                      1.   Capacity: 600 MW

                      1.   Estimated Cost:      US$ 1,665 million
                                                                                                                       P



                      1.   Economic Life:       20 years

                      1.   Mode:                Coal (imported)

                      1.   Expected PPP:        Joint Venture through an SPV (Special Purpose Vehicle…)

                      1.   Location: Kilifi, Mombasa Kenya

                      1.   Status:
                                                             1. Feasibility Study Completed
                 *          Footnote
 Source:
Source: KenGen; TMO         Source                                                                             24
Unit of measure




                                                              W



                                     Discussions




                                                              P




                             Kenya                 USA




          *       Footnote
Source:           Source                                 25

More Related Content

Recently uploaded

Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 

Recently uploaded (20)

Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 

Featured

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

KenGen PPP Models

  • 1. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL CONFIDENTIAL Structured Finance - PPP P Public-Private Partnership KenGen Proposed Models and Projects Document Eddy Njoroge, MD&CEO of KenGen Date 17 May 2012 - Nairobi, Kenya Disclaimer: This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinseyreport may be circulated, quoted, or reproduced for distribution without prior written No part of this & Company during an oral Source: Source presentation; it is not a complete record of theAll the information contained herein was prepared for information only. approval from KenGen. discussion. 1
  • 2. OUTLINE: Unit of measure 1 Background W 2 KenGen Proposed PPP Models 3 KenGen’s Proposed Phase I: PPP Projects P 4 Discussions * Footnote Source: Source 2
  • 3. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 3
  • 4. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 4
  • 5. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 5
  • 6. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 6
  • 7. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 7
  • 8. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 8
  • 9. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 9
  • 10. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 10
  • 11. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 11
  • 12. Financing KenGen’s Olkaria I & IV 280MW Flagship Projects Unit of measure With Drilling Costs W P * Footnote Source: Source: KenGen; Source 12
  • 13. Financing KenGen’s Olkaria I & IV 280MW Flagship Projects Unit of measure Without Drilling Costs W P * Footnote Source: Source: KenGen; Source 13
  • 14. OUTLINE: Unit of measure 1 Background W 2 KenGen Proposed PPP Models 3 KenGen’s Proposed Phase I: PPP Projects P 4 Discussions * Footnote Source: Source 14
  • 15. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 15
  • 16. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 16
  • 17. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 17
  • 18. Working Draft Unit of measure Last Modified 06/01/2008 08:33:51 Pacific SA Standard Time Printed 12/03/2007 15:47:35 South Africa Standard Time W CONFIDENTIAL P Document Date This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey & Company. * Footnote This material was used by McKinsey & Company during an oral Source: Source presentation; it is not a complete record of the discussion. 18
  • 19. OUTLINE: Unit of measure 1 Background W 2 KenGen Proposed PPP Models 3 KenGen’s Proposed Phase I: PPP Projects P 4 Discussions * Footnote Source: Source 19
  • 20. 3 Phase I: PPP Project: Muhoroni 80MW Power Plant Unit of measure BOT – Build Operate Transfer PPA – Power Purchase Agreement Project Description W 1. Name: Muhoroni Thermal Power Plant 1. Capacity: 80MW 1. Estimated Cost: US$ 100 million 1. Economic Life: 20 years P 1. Mode: Thermal –Heavy Fuel Oil (HFO) 1. Expected PPP: BOT (Vendor Financing…) 1. Location: Western Kenya 1. Status: 1. Tender documents under preparation 2. PPA being prepared * Footnote Source: Source: KenGen; TMO Source 20
  • 21. 3 Phase I: PPP Project: Olkaria V 140MW Power Plant Unit of measure BOT – Build Operate Transfer PPA – Power Purchase Agreement Project Description W 1. Name: Olkaria V Power Plant 1. Capacity: 140MW 1. Estimated Cost: US$ 500 million (~US$ 200m for Power Plant only) 1. Economic Life: 25 years P 1. Mode: Geothermal 1. Expected PPP: Joint Venture through an SPV (Special Purpose Vehicle…) 1. Location: Naivasha, Kenya 1. Status: 1. Drilling and Steam Optimization Study - Completion 2012 2. PPA being prepared * Footnote Source: Source: KenGen; TMO Source 21
  • 22. 3 Phase I: PPP Project: Isiolo Wind Power Plant Unit of measure BOT – Build Operate Transfer PPA – Power Purchase Agreement Project Description W 1. Name: Isiolo Wind Power Plant 1. Capacity: 150 MW (Phase I: 50MW plus Phase II: 100MW) 1. Estimated Cost: US$ 400 million (Phase I: US$ 130 plus Phase II: US$ 270MW) 1. Economic Life: 20 years P 1. Mode: Wind 1. Expected PPP: Joint Venture through an SPV (Special Purpose Vehicle…) 1. Location: Isiolo, Northern Kenya 1. Status: 1. Feasibility Study Completed * Footnote Source: Source: KenGen; TMO Source 22
  • 23. 3 Phase I: PPP Project: Liquefied Natural Gas (LNG) Power Plant Unit of measure BOT – Build Operate Transfer PPA – Power Purchase Agreement Project Description W 1. Name: LNG Power Plant 1. Capacity: 495 MW 1. Estimated Cost: US$ 686 million 1. Economic Life: 20 years P 1. Mode: Natural Gas (imported) 1. Expected PPP: BOT 1. Location: Dongo Kundu, Mombasa Kenya 1. Status: 1. Feasibility Study Completed * Footnote Source: Source: KenGen; TMO Source 23
  • 24. 3 Phase I: PPP Project: Coal Power Plant Unit of measure BOT – Build Operate Transfer PPA – Power Purchase Agreement Project Description W 1. Name: Coal Power Plant 1. Capacity: 600 MW 1. Estimated Cost: US$ 1,665 million P 1. Economic Life: 20 years 1. Mode: Coal (imported) 1. Expected PPP: Joint Venture through an SPV (Special Purpose Vehicle…) 1. Location: Kilifi, Mombasa Kenya 1. Status: 1. Feasibility Study Completed * Footnote Source: Source: KenGen; TMO Source 24
  • 25. Unit of measure W Discussions P Kenya USA * Footnote Source: Source 25