Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
Rainer Landgarf
Allegro Product Manager
James Stirton
Allegro Senior Solution Consultant
Gregor Karlovsek
Allegro Product ...
Agenda
•  Horizon: Long Term Vision
•  Horizon: 2016 Highlights
Horizon	 		
Product Vision – EMEA Power
Horizon	
Signal	Driven	
Pre-	
Analy3cs	
New	Business	Models	
APAC	Supply	
Sustaina...
Horizon	 		
Product Vision – EMEA Power
Horizon	
Genera3on	
Power	
Smoothing	VPP	
Peak	
Shaving	
Exchange	
Trading	
Weathe...
Horizon	 		
Product Vision – EMEA Gas
Horizon	
Supply	
Connec3vity	
New	Business	Models	
APAC	Other	Regional	Adjustments	
...
Horizon	 		
Product Vision – EMEA Gas
Horizon	
Supply	
Connec3vity	
New	Business	Models	
APAC	Other	Regional	Adjustments	
...
AZURE	
	
Product Development
Seeking Community Collaboration
Iden3fied	
Market	
Direc3on	
Clients‘	
Needs	
Logged	
Support	...
Functionality has been split in to the following themes:
•  EMEA Power Core
•  EMEA Gas Core
•  EMEA Strength
•  Global Pe...
•  MW Rate Trade Positions/Scheduling
EMEA Power
ü  Ability	to	report	in	MW	(rate)	across	posi3on	and	scheduling	views.	
I...
Demo	–	MW	Rate
•  Bi-Directional Imbalance Flexibility
•  Balancing Time Unit Flexibility
•  Imbalance Flexibility – Where No Existing Po...
•  Entry-Exit Scheduling View
EMEA Gas
Issue:	Require	enhanced	scheduling	view	to	beer	manage	business	
processes	associat...
•  Entry-Exit Scheduling View
EMEA Gas
•  Entry-Exit Scheduling View
EMEA Gas
•  Entry-Exit Scheduling View
EMEA Gas
•  Exercise Phys Options In Scheduling
EMEA Gas
Issue:	Physical	op3ons	cannot	be	exercised	from	scheduling	view	(as	with	p...
Demo	–	Exercise	a	Gas	Op8on
•  Entry-Exit Nom Streams
•  Allocate Quantities With Mixed Quantity Statuses
•  Create Zero Quantity Nominations
•  Withi...
•  Fixing on a Forward (DAY-QTRHR)
EMEA Strength
Issue:	Requirement	to	set	trade	price	to	an	index	“as	of”	a	specified	date...
Demo	–	Fix	on	a	Forward
•  Disagg Monthly Positions to Hourly
•  Disagg Monthly Schedules to Hourly
EMEA Strength
Issue:	Posi3ons	stored	as	monthl...
Demo	–	Power	Disagg
•  Perf - Power Position View
•  Perf - Imbalance Calc
•  Perf - HH Imbalance Calc
Global Performance
Issue:	Performance	o...
•  Confirm Connect
Regional Elements
Issue:	Require	ability	to	electronically	confirm	trade	via	EFET	NET	ECM	
ü  Confirm	Con...
EMIR		
REMIT	
Confirm	Connect	
EMIR	XML	for	ESMA	
REMIT	XML	for	ACER	
Confirm Connect ERR
•  REMIT Reporting in ConfirmConnect
Regulatory
Issue:	REMIT	legisla3on	requires	repor3ng	of	non-OMP	traded	trades	to	a	RR...
Screenshot	–	ConfirmConnect	for	REMIT
Screenshot	–	Confirm	Connect	XML	Extract
T H A N K Y O U
Please make your way back to the next break out
session:
Stream 1 - Digital Transformation – DON JOAO
Stre...
2016 Allegro EMEA Summit_EMEA Power & Gas_James Stirton
Upcoming SlideShare
Loading in …5
×
Upcoming SlideShare
Invoca Customers Share the Love
Next
Download to read offline and view in fullscreen.

0

Share

Download to read offline

2016 Allegro EMEA Summit_EMEA Power & Gas_James Stirton

Download to read offline

Allegro EMEA Summit 2016_Track Session

Related Books

Free with a 30 day trial from Scribd

See all

Related Audiobooks

Free with a 30 day trial from Scribd

See all
  • Be the first to like this

2016 Allegro EMEA Summit_EMEA Power & Gas_James Stirton

  1. 1. Rainer Landgarf Allegro Product Manager James Stirton Allegro Senior Solution Consultant Gregor Karlovsek Allegro Product Manager
  2. 2. Agenda •  Horizon: Long Term Vision •  Horizon: 2016 Highlights
  3. 3. Horizon Product Vision – EMEA Power Horizon Signal Driven Pre- Analy3cs New Business Models APAC Supply Sustainability Grids Ancillary Services Genera3on
  4. 4. Horizon Product Vision – EMEA Power Horizon Genera3on Power Smoothing VPP Peak Shaving Exchange Trading Weather- to- Forecast Strategies Risk Disagg Space Mgmt Exo3c Modeling DSM Secondary and Ter3ary Reserve Smart Grids Fuel Mix Data Scalability Carbon Footprint Curve & Forecasts Emissions ? Adjustments Signal Driven Pre- Analy3cs New Business Models APAC Supply Sustainability Grids Ancillary Services Genera3on
  5. 5. Horizon Product Vision – EMEA Gas Horizon Supply Connec3vity New Business Models APAC Other Regional Adjustments Logis3cs Up-Stream
  6. 6. Horizon Product Vision – EMEA Gas Horizon Supply Connec3vity New Business Models APAC Other Regional Adjustments Logis3cs Up-Stream ? Adjustments Nomina3ons Storage Mgmt Produc3on Calorific Blending Data Scalability Curve & Forecasts Exchanges TSOs Data Vendors Adj V AdjI V Adj V AdjI II AdjI I AdjI Adj VI Adj VII Adj …
  7. 7. AZURE Product Development Seeking Community Collaboration Iden3fied Market Direc3on Clients‘ Needs Logged Support Cases Grouping Tasks Defining Priori3es Voice of Community Deliverables Test Availability to Clients RELEASE
  8. 8. Functionality has been split in to the following themes: •  EMEA Power Core •  EMEA Gas Core •  EMEA Strength •  Global Performance •  Regulatory Allegro Horizon
  9. 9. •  MW Rate Trade Positions/Scheduling EMEA Power ü  Ability to report in MW (rate) across posi3on and scheduling views. Issue: Market traded quan3ty unit is MW.
  10. 10. Demo – MW Rate
  11. 11. •  Bi-Directional Imbalance Flexibility •  Balancing Time Unit Flexibility •  Imbalance Flexibility – Where No Existing Position •  Edit Existing Imbalance Position Volumes •  Use Term Capacity For Imb Trades EMEA Power Issue: Require enhanced / more powerful balancing capability inline with European power markets. ü  Ability to balance between balancing areas. ü  Ability to balance in various 3me units ü  Ability to balance between areas where no posi3on exis3ng. ü  Ability to edit exis3ng posi3on volumes and update accordingly ü  Ability to create imbalance trades using term capacity supported.
  12. 12. •  Entry-Exit Scheduling View EMEA Gas Issue: Require enhanced scheduling view to beer manage business processes associated with Natural Gas and capacity in Europe. ü  New Capacity Overview pane ü  New Flow Overview pane ü  Handling of Nomination ü  Creation of movements with zero quantities Scheduling ü  Show Buy/Sell quantities in ‘Position’ pane ü  New ‘Option’ pane
  13. 13. •  Entry-Exit Scheduling View EMEA Gas
  14. 14. •  Entry-Exit Scheduling View EMEA Gas
  15. 15. •  Entry-Exit Scheduling View EMEA Gas
  16. 16. •  Exercise Phys Options In Scheduling EMEA Gas Issue: Physical op3ons cannot be exercised from scheduling view (as with power) ü  Ability to exercise / par3ally exercise op3ons of different styles supported.
  17. 17. Demo – Exercise a Gas Op8on
  18. 18. •  Entry-Exit Nom Streams •  Allocate Quantities With Mixed Quantity Statuses •  Create Zero Quantity Nominations •  Within Month Actuals in Scheduling EMEA Gas ü  Ability to allocate using plan, forecast, nom and actual q status. ü  Ability to create nomina3ons with 0 quan3ty. ü  Ability to capture actuals within a month supported. ü  Ability to create entry / exit nomina3on streams supported.
  19. 19. •  Fixing on a Forward (DAY-QTRHR) EMEA Strength Issue: Requirement to set trade price to an index “as of” a specified date. Price index may be monthly, daily, hourly, or sub hourly granularity. ü  Specify Fix Date on Trade Price 16 17 18 19 20 21 22 23 24 1 21 41 61 81 101 121 141 161 181 201 221 241 261 281 301 321 341 361 381 401 421 441 461 481 501 521 541 561 581 601 621 641 661 681 701 721 741 Price Hourly Fixing Curve 16/06/2016 15/06/2016 14/06/2016
  20. 20. Demo – Fix on a Forward
  21. 21. •  Disagg Monthly Positions to Hourly •  Disagg Monthly Schedules to Hourly EMEA Strength Issue: Posi3ons stored as monthly, could not be disaggregated into hourly buckets. ü  Code op3mised to disagg correctly over various granular horizons
  22. 22. Demo – Power Disagg
  23. 23. •  Perf - Power Position View •  Perf - Imbalance Calc •  Perf - HH Imbalance Calc Global Performance Issue: Performance on very large trade volumes / granular loadshape trades is not sa3sfactory for every day use. ü  Code con3nually op3mised to improve power posi3on retrieval 3me. ü  Code con3nually op3mised to improve imbalance calcula3on 3mes. ü  Code con3nually op3mised to improve half hourly imbalance calcula3on 3mes.
  24. 24. •  Confirm Connect Regional Elements Issue: Require ability to electronically confirm trade via EFET NET ECM ü  Confirm Connect Regional Element provided for ECM Issue: Require ability to electronically report for EMIR and REMIT via EFETNET ERR ü  Confirm Connect Regional Element enhanced to support REMIT Table 2 Repor3ng ü  Confirm Connect Regional – appe3te to increase scope to accommodate EMIR repor3ng. In Parallel to Horizon
  25. 25. EMIR REMIT Confirm Connect EMIR XML for ESMA REMIT XML for ACER Confirm Connect ERR
  26. 26. •  REMIT Reporting in ConfirmConnect Regulatory Issue: REMIT legisla3on requires repor3ng of non-OMP traded trades to a RRM. ü  Enhancement of ConfirmConnect to support direct communica3on of trade repor3ng to EFETnet eRR. In Parallel to Horizon
  27. 27. Screenshot – ConfirmConnect for REMIT
  28. 28. Screenshot – Confirm Connect XML Extract
  29. 29. T H A N K Y O U Please make your way back to the next break out session: Stream 1 - Digital Transformation – DON JOAO Stream 2 –Allegro Horizon Tech Stack – D. LEONOR Then please return to Main Conference Room DON JOAO at 17:30 for evening instructions, prize draws and our drinks reception

Allegro EMEA Summit 2016_Track Session

Views

Total views

397

On Slideshare

0

From embeds

0

Number of embeds

3

Actions

Downloads

10

Shares

0

Comments

0

Likes

0

×