SlideShare a Scribd company logo
1 of 4
Download to read offline
ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed, nor are they to be construed
as an endorsement of the subject of the report or a recommendation for its use. There is no warranty by ICC Evaluation Service, LLC, express or implied, as
to any finding or other matter in this report, or as to any product covered by the report.
Copyright © 2022 ICC Evaluation Service, LLC. All rights reserved. Page 1 of 4
www.icc-es.org | (800) 423-6587 | (562) 699-0543 A Subsidiary of the International Code Council®
ICC-ES Evaluation Report Reissued November 2022
ESR-4383 This report is subject to renewal November 2024.
DIVISION: 03 00 00—CONCRETE
Section: 03 15 00—Concrete Accessories
REPORT HOLDER:
BPA-GmbH
EVALUATION SUBJECT:
CEMflex®
VB WATERSTOP
1.0 EVALUATION SCOPE
Compliance with the following codes:
2018, 2015, and 2012 International Building Code (IBC)
Properties evaluated:
 Watertightness
 Durability
2.0 USES
The CEMflex®
VB waterstop is used to provide a watertight
seal that can resist the penetration of water due to
hydrostatic pressure between joints in concrete walls, slabs,
foundations, and other non-movement joints in accordance
with Section 1805.3.3 of the IBC. The waterstop is used in
conjunction with waterproofing systems for walls and floors
recognized under Sections 1805.3.1 and 1805.3.2 of the
IBC.
The BPA CEMflex®
VB waterstop is intended for interior
and exterior locations of all construction types.
3.0 DESCRIPTION
3.1 General:
The BPA CEMflex®
VB is a Metal Structurally Integral
Waterstop (MSIW) with a proprietary cement-based coating.
The MSIW consists of a galvanized steel sheet that is
coated with a proprietary cement-based coating. The MSIW
is fully embedded in the concrete structure at joint locations.
See Figure 1. When subjected to water, the proprietary
coating undergoes a chemical reaction causing the
formation of a crystalline structure on the surface of the
MSIW. The crystalline growth fills voids and cracks in the
construction joint to prevent the passage of water. See
Figure 2.
3.2 Material:
3.2.1 Metal Panels: The metal panels are type DC01
+ZE25/25 electrolytically zinc coated galvanized mild steel
in accordance with ISO 10152. The sheets are .027-inch
(0.675 mm) thick, 783
/4 inches (2 m) long, and come in
widths of 315
/16 inches (100 mm), 529
/32 inches (150 mm),
77
/8 inches (200 mm), or 927
/32 inches (250 mm). The metal
sheets have a minimum yield strength of 20.3 ksi (140 MPa)
and a minimum ultimate tensile strength of 39.1 ksi
(270 MPa).
3.2.2 Proprietary Coating: The cement-based coating is
composed of type CEM I-III cement in accordance with DIN
EN 197-1, and is blended with red or black pigment and a
proprietary admixture. The coating is applied to the metal
sheets to provide a minimum 1
/64-inch (0.225 mm) uniform
thickness on each side.
3.2.3 CEMflex®
Omega (Ω) Holder: The CEMflex®
Ω -
holder is a grade S235 9
/64-inch (3.5 mm) diameter round
steel bar in accordance with DIN EN 10025.
3.2.4 CEMflex®
Clip: The CEMflex®
clip is a grade S235
5
/64-inch (2 mm) diameter round steel bar in accordance with
DIN EN 10025/10060.
4.0 DESIGN AND INSTALLATION
4.1 Design:
The CEMflex®
VB waterstop is designed to be installed at
non-movement joints in new concrete construction. The
concrete joints shall be designed to provide a minimum
embedment depth in accordance with Table 1 and 2 inches
(50 mm) of coverage to the waterstop.
The allowable hydrostatic pressures based on installation
conditions are shown in Table 1 of this report.
The type, size, details, and locations of MSIWs not shown
in the construction documents shall be submitted for review
by the code official and by the licensed design professional
prior to installation in accordance with ACI 318.
4.2 Installation:
Installation of the MSIW must comply with the
manufacturer’s published instructions, this report, and the
IBC, as applicable.
ESR-4383 | Most Widely Accepted and Trusted Page 2 of 4
The MSIW installer must be trained and approved by the
report holder or by the report holder’s authorized distributor
of the product.
The manufacturer’s published installation instructions
must be available at the jobsite at all times during
installation. In the event of a conflict between this report and
the manufacturer’s instructions, this report governs.
4.2.1 CEMflex®
VB Waterstop: There are two methods of
waterstop installation: installation with the CEMflex®
Ω -
holder and installation with the CEMflex®
clip.
With either installation method, the MSIW can be bent by
hand and formed to accommodate corners and curves
within the concrete structure. Once the MSIWs have been
bent to form curves or corners, they must be inspected to
ensure that the proprietary coating is intact on both sides of
the MSIW. If the coating is compromised, the section of
MSIW shall be discarded.
4.2.1.1 CEMflex®
Clip: When installed using the
CEMflex®
clip (Figure 3), the waterstop is embedded into the
freshly placed concrete at the joint location. The CEMflex®
clips are placed at joints of the waterstop to ensure proper
overlap in accordance with Table 1. Placement must be
done in a timely manner while the concrete is still workable
in order to ensure proper positioning and embedment.
Freshly placed concrete must be thoroughly consolidated
around the product to minimize presence of air voids.
4.2.1.2 CEMflex®
Ω - Holder: When installed using the
CEMflex®
Ω - holder (Figure 4), the waterstop is positioned
within the formwork of the concrete structure at the location
of the joint prior to placement of the concrete. CEMflex®
clips
or CEMflex®
Ω - holders are placed at joints of the waterstop
to ensure proper overlap in accordance with Table 1.
CEMflex®
Ω - holders are placed at intermediate positions to
hold the MSIW in the proper design location to ensure
adequate embedment and coverage. Freshly placed
concrete must be thoroughly consolidated around the
product to minimize presence of air voids. Care must be
taken during concrete placement to ensure that the MSIW
is properly positioned in regard to embedment and coverage
once placement is completed.
4.2.2 Preparation for Successive Concrete Placement:
Prior to placing concrete to form adjoining concrete
structures such as placement of a wall on top of a
foundation, the MSIW must be thoroughly inspected to
ensure that the proprietary coating is fully intact. If the
coating is found to be damaged during inspection, the MSIW
manufacturer or authorized distributor shall be contacted for
repair instructions.
5.0 CONDITIONS OF USE
The CEMflex®
VB Waterstop described in this report
complies with, or is a suitable alternative to what is specified
in, those codes listed in Section 1.0 of this report, subject to
the following conditions:
5.1 The concrete structures with embedments, and the
connections for transferring loads between concrete
elements must be designed in accordance with
ACI 318 and are beyond the scope of this report.
5.2 The product is limited to installation in non-movement
joints in concrete construction.
5.3 The product must be used in conjunction with other
approved waterproofing systems in accordance with
Sections 1805.3.1 and 1805.3.2 of the IBC.
5.4 Special inspections in accordance with
Sections 1705.1.1 and 1705.3 of the IBC and
applicable portions of ACI 318 are required to ensure
proper concrete placement techniques, proper
placement of the embedded MSIWs, and to confirm
that the proprietary coating is intact prior to concrete
placement.
6.0 EVIDENCE SUBMITTED
Data in accordance with European Assessment Document
EAD 32002-02-0605 Coated Metal Waterstop Sheet for
Construction and Controlled Crack Joints in Waterproof
Concrete, Edition November 2016, European Organization
for Technical Approvals (EOTA).
7.0 IDENTIFICATION
7.1 The CEMflex®
VB Waterstop sheets described in this
report are identified by a label on the wooden box
bearing the manufacturer’s name; product description
and/or part number; and the ICC-ES evaluation report
number (ESR-4383).
7.2 The report holder’s contact information is the following:
BPA-GmbH
BEHRINGERSTRASSE 12
D-71083 HERRENBERG-GÜLTSTEIN
GERMANY
+49-7032-89-399-0
www.bpa-waterproofing.com/en/
info@bpa-waterproofing.com
TABLE 1—ALLOWABLE HYDROSTATIC PRESSURES
MINIMUM WIDTH
OF CEMflex® VB
MINIMUM OVERLAP—
INCHES (mm)
MINIMUM EMBEDMENT—
INCHES (mm)
ALLOWABLE
HYDROSTATIC
PRESSURE—psi (bar)
ULTIMATE
HYDROSTATIC
PRESSURE – psi (bar)
529
/32 inches /
(150 mm)
2 inches / (50mm) 13
/16 inches / (30 mm) 11.6 psi / (0.8 bar) 29 psi / (2 bar)
529
/32 inches /
(150 mm)
77
/8 inches / (200mm) 13
/8 inches / (35 mm) 29 psi / (2 bar) 72.5 psi / (5 bar)
ESR-4383 | Most Widely Accepted and Trusted Page 3 of 4
FIGURE 1—ILLUSTRATION OF TYPICAL INSTALLATIONS
FIGURE 2—ILLUSTRATION OF CRYSTALLIZATION OF PROPRIETARY COATING
FIGURE 4—CEMflex®
Ω - HOLDER
FIGURE 3—CEMflex®
CLIP
ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed, nor are they to be construed
as an endorsement of the subject of the report or a recommendation for its use. There is no warranty by ICC Evaluation Service, LLC, express or implied, as
to any finding or other matter in this report, or as to any product covered by the report.
Copyright © 2022 ICC Evaluation Service, LLC. All rights reserved. Page 4 of 4
ICC-ES Evaluation Report ESR-4383 CBC Supplement
Reissued November 2022
This report is subject to renewal November 2024.
www.icc-es.org | (800) 423-6587 | (562) 699-0543 A Subsidiary of the International Code Council®
DIVISION: 03 00 00—CONCRETE
Section: 03 15 00—Concrete Accessories
REPORT HOLDER:
BPA-GmbH
EVALUATION SUBJECT:
CEMflex®
VB WATERSTOP
1.0 REPORT PURPOSE AND SCOPE
Purpose:
The purpose of this evaluation report supplement is to indicate that CEMflex®
VB waterstop, described in ICC-ES evaluation
report ESR-4383, has also been evaluated for compliance with the code noted below.
Applicable code editions:
2019 California Building Code (CBC)
For evaluation of applicable chapters adopted by the California Office of Statewide Health Planning and Development
(OSHPD) aka: California Department of Health Care Access and Information (HCAI) and the Division of State Architect (DSA),
see Sections 2.1.1 and 2.1.2 below.
2.0 CONCLUSIONS
2.1 CBC:
The CEMflex®
VB waterstop, described in Sections 2.0 through 7.0 of the evaluation report ESR-4383, complies with CBC
Chapter 18, provided the design and installation are in accordance with the 2018 International Building Code®
(IBC) provisions
noted in the evaluation report and the additional requirements of CBC Chapters 17 and 18, as applicable.
2.1.1 OSHPD:
The applicable OSHPD Sections of the CBC are beyond the scope of this supplement.
2.1.2 DSA:
The applicable DSA Sections of the CBC are beyond the scope of this supplement.
This supplement expires concurrently with the evaluation report, reissued November 2022.

More Related Content

Similar to ESR-4383.pdf

Road safety-barrier-systems-appendix-a
Road safety-barrier-systems-appendix-aRoad safety-barrier-systems-appendix-a
Road safety-barrier-systems-appendix-aIsti Kharoh
 
IRJET - Seismic Analysis of RCC Framed Structure using Different Isolator
IRJET -  	  Seismic Analysis of RCC Framed Structure using Different IsolatorIRJET -  	  Seismic Analysis of RCC Framed Structure using Different Isolator
IRJET - Seismic Analysis of RCC Framed Structure using Different IsolatorIRJET Journal
 
Study on Strengthening of Corrosion Damaged Rcc Beam by Ferrocement
Study on Strengthening of Corrosion Damaged Rcc Beam by FerrocementStudy on Strengthening of Corrosion Damaged Rcc Beam by Ferrocement
Study on Strengthening of Corrosion Damaged Rcc Beam by FerrocementIRJET Journal
 
Certificado BBA - Aislamiento Synthesia para cubiertas
Certificado BBA - Aislamiento Synthesia para cubiertasCertificado BBA - Aislamiento Synthesia para cubiertas
Certificado BBA - Aislamiento Synthesia para cubiertasSynthesia Technology
 
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURES
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURESREVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURES
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURESIRJET Journal
 
02725 sewer manholes
02725 sewer manholes02725 sewer manholes
02725 sewer manholesAni Alikaj
 
Self compacting concrete with cem iia-s 52,5 n and high fly ash addition in p...
Self compacting concrete with cem iia-s 52,5 n and high fly ash addition in p...Self compacting concrete with cem iia-s 52,5 n and high fly ash addition in p...
Self compacting concrete with cem iia-s 52,5 n and high fly ash addition in p...eSAT Publishing House
 
Method aluminum door & window
Method aluminum door & windowMethod aluminum door & window
Method aluminum door & windowMinh Bui Si
 
Precast Concrete Specifications.doc
Precast Concrete Specifications.docPrecast Concrete Specifications.doc
Precast Concrete Specifications.docAbdallah437436
 
ICS 5000 commercial flue system instructions
ICS 5000 commercial flue system instructionsICS 5000 commercial flue system instructions
ICS 5000 commercial flue system instructionsSchiedel UK
 
Want To Know About Concrete Wall System?
Want To Know About Concrete Wall System?Want To Know About Concrete Wall System?
Want To Know About Concrete Wall System?shamusgarry
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...zhaowo17360
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...lp6gqc020l
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...yushantuanjing
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...f8usjejkdmmd
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...fujsekkdmmdm
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...itj79143591
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...fyhsejdkkdmmd3e
 

Similar to ESR-4383.pdf (20)

Road safety-barrier-systems-appendix-a
Road safety-barrier-systems-appendix-aRoad safety-barrier-systems-appendix-a
Road safety-barrier-systems-appendix-a
 
uv_bpm.pdf
uv_bpm.pdfuv_bpm.pdf
uv_bpm.pdf
 
IRJET - Seismic Analysis of RCC Framed Structure using Different Isolator
IRJET -  	  Seismic Analysis of RCC Framed Structure using Different IsolatorIRJET -  	  Seismic Analysis of RCC Framed Structure using Different Isolator
IRJET - Seismic Analysis of RCC Framed Structure using Different Isolator
 
EVALUACION DE REPORTE PRODUCTO S.I.K.A
EVALUACION DE REPORTE PRODUCTO S.I.K.AEVALUACION DE REPORTE PRODUCTO S.I.K.A
EVALUACION DE REPORTE PRODUCTO S.I.K.A
 
Study on Strengthening of Corrosion Damaged Rcc Beam by Ferrocement
Study on Strengthening of Corrosion Damaged Rcc Beam by FerrocementStudy on Strengthening of Corrosion Damaged Rcc Beam by Ferrocement
Study on Strengthening of Corrosion Damaged Rcc Beam by Ferrocement
 
Certificado BBA - Aislamiento Synthesia para cubiertas
Certificado BBA - Aislamiento Synthesia para cubiertasCertificado BBA - Aislamiento Synthesia para cubiertas
Certificado BBA - Aislamiento Synthesia para cubiertas
 
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURES
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURESREVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURES
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURES
 
02725 sewer manholes
02725 sewer manholes02725 sewer manholes
02725 sewer manholes
 
Self compacting concrete with cem iia-s 52,5 n and high fly ash addition in p...
Self compacting concrete with cem iia-s 52,5 n and high fly ash addition in p...Self compacting concrete with cem iia-s 52,5 n and high fly ash addition in p...
Self compacting concrete with cem iia-s 52,5 n and high fly ash addition in p...
 
Method aluminum door & window
Method aluminum door & windowMethod aluminum door & window
Method aluminum door & window
 
Precast Concrete Specifications.doc
Precast Concrete Specifications.docPrecast Concrete Specifications.doc
Precast Concrete Specifications.doc
 
ICS 5000 commercial flue system instructions
ICS 5000 commercial flue system instructionsICS 5000 commercial flue system instructions
ICS 5000 commercial flue system instructions
 
Want To Know About Concrete Wall System?
Want To Know About Concrete Wall System?Want To Know About Concrete Wall System?
Want To Know About Concrete Wall System?
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
 
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
Caterpillar Cat C32 Industrial Engine (Prefix TLD) Service Repair Manual (TLD...
 

More from BPA-GmbH, Waterproofing is our Passion!

PB - DualProof 2.0 (PVC)_WI_Umweltunbedenklichkeit nach M Geok E_20170522.pdf
PB - DualProof 2.0 (PVC)_WI_Umweltunbedenklichkeit nach M Geok E_20170522.pdfPB - DualProof 2.0 (PVC)_WI_Umweltunbedenklichkeit nach M Geok E_20170522.pdf
PB - DualProof 2.0 (PVC)_WI_Umweltunbedenklichkeit nach M Geok E_20170522.pdfBPA-GmbH, Waterproofing is our Passion!
 
Pre-applied mechanically bonded waterproofing membranes - Cement paste filtra...
Pre-applied mechanically bonded waterproofing membranes - Cement paste filtra...Pre-applied mechanically bonded waterproofing membranes - Cement paste filtra...
Pre-applied mechanically bonded waterproofing membranes - Cement paste filtra...BPA-GmbH, Waterproofing is our Passion!
 
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...BPA-GmbH, Waterproofing is our Passion!
 

More from BPA-GmbH, Waterproofing is our Passion! (20)

Beschichtete Fugenblechsysteme DBV.pdf
Beschichtete Fugenblechsysteme DBV.pdfBeschichtete Fugenblechsysteme DBV.pdf
Beschichtete Fugenblechsysteme DBV.pdf
 
DualProof Prüfberichte 2021 klll.pdf
DualProof Prüfberichte 2021 klll.pdfDualProof Prüfberichte 2021 klll.pdf
DualProof Prüfberichte 2021 klll.pdf
 
PB - DualProof 2.0 (PVC)_WI_Umweltunbedenklichkeit nach M Geok E_20170522.pdf
PB - DualProof 2.0 (PVC)_WI_Umweltunbedenklichkeit nach M Geok E_20170522.pdfPB - DualProof 2.0 (PVC)_WI_Umweltunbedenklichkeit nach M Geok E_20170522.pdf
PB - DualProof 2.0 (PVC)_WI_Umweltunbedenklichkeit nach M Geok E_20170522.pdf
 
546-17 BPA Image WEB 2023.pdf
546-17 BPA Image WEB 2023.pdf546-17 BPA Image WEB 2023.pdf
546-17 BPA Image WEB 2023.pdf
 
DualProof A Einbau Okt 2022_LQ.pdf
DualProof A Einbau Okt 2022_LQ.pdfDualProof A Einbau Okt 2022_LQ.pdf
DualProof A Einbau Okt 2022_LQ.pdf
 
25 Jahre BPA.pdf
25 Jahre BPA.pdf25 Jahre BPA.pdf
25 Jahre BPA.pdf
 
25 Jahre BPA wir halten dicht.pdf
25 Jahre BPA wir halten dicht.pdf25 Jahre BPA wir halten dicht.pdf
25 Jahre BPA wir halten dicht.pdf
 
CEMtobent CS Verarbeitungsrichtlinie 2023.pdf
CEMtobent CS Verarbeitungsrichtlinie 2023.pdfCEMtobent CS Verarbeitungsrichtlinie 2023.pdf
CEMtobent CS Verarbeitungsrichtlinie 2023.pdf
 
Pre-applied mechanically bonded waterproofing membranes - Cement paste filtra...
Pre-applied mechanically bonded waterproofing membranes - Cement paste filtra...Pre-applied mechanically bonded waterproofing membranes - Cement paste filtra...
Pre-applied mechanically bonded waterproofing membranes - Cement paste filtra...
 
BPA GmbH_FBVS 2022 allg.pdf
BPA GmbH_FBVS 2022 allg.pdfBPA GmbH_FBVS 2022 allg.pdf
BPA GmbH_FBVS 2022 allg.pdf
 
CEMtobentTunnel2022.pdf
CEMtobentTunnel2022.pdfCEMtobentTunnel2022.pdf
CEMtobentTunnel2022.pdf
 
BPA CEMflex Flyer JGS_red.pdf
BPA CEMflex Flyer JGS_red.pdfBPA CEMflex Flyer JGS_red.pdf
BPA CEMflex Flyer JGS_red.pdf
 
BPA Broschüre DualProof EN 2022.pdf
BPA Broschüre DualProof EN 2022.pdfBPA Broschüre DualProof EN 2022.pdf
BPA Broschüre DualProof EN 2022.pdf
 
EPD CEMflex VB Environmental Product Declaration
EPD CEMflex VB Environmental Product DeclarationEPD CEMflex VB Environmental Product Declaration
EPD CEMflex VB Environmental Product Declaration
 
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
 
CEMtobent Tunnel 2020.pdf
CEMtobent Tunnel 2020.pdfCEMtobent Tunnel 2020.pdf
CEMtobent Tunnel 2020.pdf
 
BPA-CEMtobent - Gutachten Stuttgart S21 - 1117.pdf
BPA-CEMtobent - Gutachten Stuttgart S21 - 1117.pdfBPA-CEMtobent - Gutachten Stuttgart S21 - 1117.pdf
BPA-CEMtobent - Gutachten Stuttgart S21 - 1117.pdf
 
Frischbetonverbundsysteme_FBVS_APf.pdf
Frischbetonverbundsysteme_FBVS_APf.pdfFrischbetonverbundsysteme_FBVS_APf.pdf
Frischbetonverbundsysteme_FBVS_APf.pdf
 
Betonrandzone_FBVS_APf.pdf
Betonrandzone_FBVS_APf.pdfBetonrandzone_FBVS_APf.pdf
Betonrandzone_FBVS_APf.pdf
 
Bericht_Bentontiquellband Quellmax_D-de_20210505.pdf
Bericht_Bentontiquellband Quellmax_D-de_20210505.pdfBericht_Bentontiquellband Quellmax_D-de_20210505.pdf
Bericht_Bentontiquellband Quellmax_D-de_20210505.pdf
 

Recently uploaded

KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationDr. Radhey Shyam
 
Dairy management system project report..pdf
Dairy management system project report..pdfDairy management system project report..pdf
Dairy management system project report..pdfKamal Acharya
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdfKamal Acharya
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edgePaco Orozco
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectRased Khan
 
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单tuuww
 
ENCODERS & DECODERS - Digital Electronics - diu swe
ENCODERS & DECODERS - Digital Electronics - diu sweENCODERS & DECODERS - Digital Electronics - diu swe
ENCODERS & DECODERS - Digital Electronics - diu sweMohammadAliNayeem
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdfKamal Acharya
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfKamal Acharya
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdfKamal Acharya
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdfKamal Acharya
 
Low rpm Generator for efficient energy harnessing from a two stage wind turbine
Low rpm Generator for efficient energy harnessing from a two stage wind turbineLow rpm Generator for efficient energy harnessing from a two stage wind turbine
Low rpm Generator for efficient energy harnessing from a two stage wind turbineAftabkhan575376
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5T.D. Shashikala
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.MdManikurRahman
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1T.D. Shashikala
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
Roushan Kumar Java oracle certificate
Roushan Kumar Java oracle certificate Roushan Kumar Java oracle certificate
Roushan Kumar Java oracle certificate RaushanKumar452467
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDrGurudutt
 
internship exam ppt.pptx on embedded system and IOT
internship exam ppt.pptx on embedded system and IOTinternship exam ppt.pptx on embedded system and IOT
internship exam ppt.pptx on embedded system and IOTNavyashreeS6
 

Recently uploaded (20)

KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
Dairy management system project report..pdf
Dairy management system project report..pdfDairy management system project report..pdf
Dairy management system project report..pdf
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdf
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
一比一原版(UNK毕业证)内布拉斯加州立大学科尼分校毕业证成绩单
 
ENCODERS & DECODERS - Digital Electronics - diu swe
ENCODERS & DECODERS - Digital Electronics - diu sweENCODERS & DECODERS - Digital Electronics - diu swe
ENCODERS & DECODERS - Digital Electronics - diu swe
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
Low rpm Generator for efficient energy harnessing from a two stage wind turbine
Low rpm Generator for efficient energy harnessing from a two stage wind turbineLow rpm Generator for efficient energy harnessing from a two stage wind turbine
Low rpm Generator for efficient energy harnessing from a two stage wind turbine
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Roushan Kumar Java oracle certificate
Roushan Kumar Java oracle certificate Roushan Kumar Java oracle certificate
Roushan Kumar Java oracle certificate
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
 
internship exam ppt.pptx on embedded system and IOT
internship exam ppt.pptx on embedded system and IOTinternship exam ppt.pptx on embedded system and IOT
internship exam ppt.pptx on embedded system and IOT
 

ESR-4383.pdf

  • 1. ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed, nor are they to be construed as an endorsement of the subject of the report or a recommendation for its use. There is no warranty by ICC Evaluation Service, LLC, express or implied, as to any finding or other matter in this report, or as to any product covered by the report. Copyright © 2022 ICC Evaluation Service, LLC. All rights reserved. Page 1 of 4 www.icc-es.org | (800) 423-6587 | (562) 699-0543 A Subsidiary of the International Code Council® ICC-ES Evaluation Report Reissued November 2022 ESR-4383 This report is subject to renewal November 2024. DIVISION: 03 00 00—CONCRETE Section: 03 15 00—Concrete Accessories REPORT HOLDER: BPA-GmbH EVALUATION SUBJECT: CEMflex® VB WATERSTOP 1.0 EVALUATION SCOPE Compliance with the following codes: 2018, 2015, and 2012 International Building Code (IBC) Properties evaluated:  Watertightness  Durability 2.0 USES The CEMflex® VB waterstop is used to provide a watertight seal that can resist the penetration of water due to hydrostatic pressure between joints in concrete walls, slabs, foundations, and other non-movement joints in accordance with Section 1805.3.3 of the IBC. The waterstop is used in conjunction with waterproofing systems for walls and floors recognized under Sections 1805.3.1 and 1805.3.2 of the IBC. The BPA CEMflex® VB waterstop is intended for interior and exterior locations of all construction types. 3.0 DESCRIPTION 3.1 General: The BPA CEMflex® VB is a Metal Structurally Integral Waterstop (MSIW) with a proprietary cement-based coating. The MSIW consists of a galvanized steel sheet that is coated with a proprietary cement-based coating. The MSIW is fully embedded in the concrete structure at joint locations. See Figure 1. When subjected to water, the proprietary coating undergoes a chemical reaction causing the formation of a crystalline structure on the surface of the MSIW. The crystalline growth fills voids and cracks in the construction joint to prevent the passage of water. See Figure 2. 3.2 Material: 3.2.1 Metal Panels: The metal panels are type DC01 +ZE25/25 electrolytically zinc coated galvanized mild steel in accordance with ISO 10152. The sheets are .027-inch (0.675 mm) thick, 783 /4 inches (2 m) long, and come in widths of 315 /16 inches (100 mm), 529 /32 inches (150 mm), 77 /8 inches (200 mm), or 927 /32 inches (250 mm). The metal sheets have a minimum yield strength of 20.3 ksi (140 MPa) and a minimum ultimate tensile strength of 39.1 ksi (270 MPa). 3.2.2 Proprietary Coating: The cement-based coating is composed of type CEM I-III cement in accordance with DIN EN 197-1, and is blended with red or black pigment and a proprietary admixture. The coating is applied to the metal sheets to provide a minimum 1 /64-inch (0.225 mm) uniform thickness on each side. 3.2.3 CEMflex® Omega (Ω) Holder: The CEMflex® Ω - holder is a grade S235 9 /64-inch (3.5 mm) diameter round steel bar in accordance with DIN EN 10025. 3.2.4 CEMflex® Clip: The CEMflex® clip is a grade S235 5 /64-inch (2 mm) diameter round steel bar in accordance with DIN EN 10025/10060. 4.0 DESIGN AND INSTALLATION 4.1 Design: The CEMflex® VB waterstop is designed to be installed at non-movement joints in new concrete construction. The concrete joints shall be designed to provide a minimum embedment depth in accordance with Table 1 and 2 inches (50 mm) of coverage to the waterstop. The allowable hydrostatic pressures based on installation conditions are shown in Table 1 of this report. The type, size, details, and locations of MSIWs not shown in the construction documents shall be submitted for review by the code official and by the licensed design professional prior to installation in accordance with ACI 318. 4.2 Installation: Installation of the MSIW must comply with the manufacturer’s published instructions, this report, and the IBC, as applicable.
  • 2. ESR-4383 | Most Widely Accepted and Trusted Page 2 of 4 The MSIW installer must be trained and approved by the report holder or by the report holder’s authorized distributor of the product. The manufacturer’s published installation instructions must be available at the jobsite at all times during installation. In the event of a conflict between this report and the manufacturer’s instructions, this report governs. 4.2.1 CEMflex® VB Waterstop: There are two methods of waterstop installation: installation with the CEMflex® Ω - holder and installation with the CEMflex® clip. With either installation method, the MSIW can be bent by hand and formed to accommodate corners and curves within the concrete structure. Once the MSIWs have been bent to form curves or corners, they must be inspected to ensure that the proprietary coating is intact on both sides of the MSIW. If the coating is compromised, the section of MSIW shall be discarded. 4.2.1.1 CEMflex® Clip: When installed using the CEMflex® clip (Figure 3), the waterstop is embedded into the freshly placed concrete at the joint location. The CEMflex® clips are placed at joints of the waterstop to ensure proper overlap in accordance with Table 1. Placement must be done in a timely manner while the concrete is still workable in order to ensure proper positioning and embedment. Freshly placed concrete must be thoroughly consolidated around the product to minimize presence of air voids. 4.2.1.2 CEMflex® Ω - Holder: When installed using the CEMflex® Ω - holder (Figure 4), the waterstop is positioned within the formwork of the concrete structure at the location of the joint prior to placement of the concrete. CEMflex® clips or CEMflex® Ω - holders are placed at joints of the waterstop to ensure proper overlap in accordance with Table 1. CEMflex® Ω - holders are placed at intermediate positions to hold the MSIW in the proper design location to ensure adequate embedment and coverage. Freshly placed concrete must be thoroughly consolidated around the product to minimize presence of air voids. Care must be taken during concrete placement to ensure that the MSIW is properly positioned in regard to embedment and coverage once placement is completed. 4.2.2 Preparation for Successive Concrete Placement: Prior to placing concrete to form adjoining concrete structures such as placement of a wall on top of a foundation, the MSIW must be thoroughly inspected to ensure that the proprietary coating is fully intact. If the coating is found to be damaged during inspection, the MSIW manufacturer or authorized distributor shall be contacted for repair instructions. 5.0 CONDITIONS OF USE The CEMflex® VB Waterstop described in this report complies with, or is a suitable alternative to what is specified in, those codes listed in Section 1.0 of this report, subject to the following conditions: 5.1 The concrete structures with embedments, and the connections for transferring loads between concrete elements must be designed in accordance with ACI 318 and are beyond the scope of this report. 5.2 The product is limited to installation in non-movement joints in concrete construction. 5.3 The product must be used in conjunction with other approved waterproofing systems in accordance with Sections 1805.3.1 and 1805.3.2 of the IBC. 5.4 Special inspections in accordance with Sections 1705.1.1 and 1705.3 of the IBC and applicable portions of ACI 318 are required to ensure proper concrete placement techniques, proper placement of the embedded MSIWs, and to confirm that the proprietary coating is intact prior to concrete placement. 6.0 EVIDENCE SUBMITTED Data in accordance with European Assessment Document EAD 32002-02-0605 Coated Metal Waterstop Sheet for Construction and Controlled Crack Joints in Waterproof Concrete, Edition November 2016, European Organization for Technical Approvals (EOTA). 7.0 IDENTIFICATION 7.1 The CEMflex® VB Waterstop sheets described in this report are identified by a label on the wooden box bearing the manufacturer’s name; product description and/or part number; and the ICC-ES evaluation report number (ESR-4383). 7.2 The report holder’s contact information is the following: BPA-GmbH BEHRINGERSTRASSE 12 D-71083 HERRENBERG-GÜLTSTEIN GERMANY +49-7032-89-399-0 www.bpa-waterproofing.com/en/ info@bpa-waterproofing.com TABLE 1—ALLOWABLE HYDROSTATIC PRESSURES MINIMUM WIDTH OF CEMflex® VB MINIMUM OVERLAP— INCHES (mm) MINIMUM EMBEDMENT— INCHES (mm) ALLOWABLE HYDROSTATIC PRESSURE—psi (bar) ULTIMATE HYDROSTATIC PRESSURE – psi (bar) 529 /32 inches / (150 mm) 2 inches / (50mm) 13 /16 inches / (30 mm) 11.6 psi / (0.8 bar) 29 psi / (2 bar) 529 /32 inches / (150 mm) 77 /8 inches / (200mm) 13 /8 inches / (35 mm) 29 psi / (2 bar) 72.5 psi / (5 bar)
  • 3. ESR-4383 | Most Widely Accepted and Trusted Page 3 of 4 FIGURE 1—ILLUSTRATION OF TYPICAL INSTALLATIONS FIGURE 2—ILLUSTRATION OF CRYSTALLIZATION OF PROPRIETARY COATING FIGURE 4—CEMflex® Ω - HOLDER FIGURE 3—CEMflex® CLIP
  • 4. ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed, nor are they to be construed as an endorsement of the subject of the report or a recommendation for its use. There is no warranty by ICC Evaluation Service, LLC, express or implied, as to any finding or other matter in this report, or as to any product covered by the report. Copyright © 2022 ICC Evaluation Service, LLC. All rights reserved. Page 4 of 4 ICC-ES Evaluation Report ESR-4383 CBC Supplement Reissued November 2022 This report is subject to renewal November 2024. www.icc-es.org | (800) 423-6587 | (562) 699-0543 A Subsidiary of the International Code Council® DIVISION: 03 00 00—CONCRETE Section: 03 15 00—Concrete Accessories REPORT HOLDER: BPA-GmbH EVALUATION SUBJECT: CEMflex® VB WATERSTOP 1.0 REPORT PURPOSE AND SCOPE Purpose: The purpose of this evaluation report supplement is to indicate that CEMflex® VB waterstop, described in ICC-ES evaluation report ESR-4383, has also been evaluated for compliance with the code noted below. Applicable code editions: 2019 California Building Code (CBC) For evaluation of applicable chapters adopted by the California Office of Statewide Health Planning and Development (OSHPD) aka: California Department of Health Care Access and Information (HCAI) and the Division of State Architect (DSA), see Sections 2.1.1 and 2.1.2 below. 2.0 CONCLUSIONS 2.1 CBC: The CEMflex® VB waterstop, described in Sections 2.0 through 7.0 of the evaluation report ESR-4383, complies with CBC Chapter 18, provided the design and installation are in accordance with the 2018 International Building Code® (IBC) provisions noted in the evaluation report and the additional requirements of CBC Chapters 17 and 18, as applicable. 2.1.1 OSHPD: The applicable OSHPD Sections of the CBC are beyond the scope of this supplement. 2.1.2 DSA: The applicable DSA Sections of the CBC are beyond the scope of this supplement. This supplement expires concurrently with the evaluation report, reissued November 2022.