January 2012
Forward Looking StatementsSome of the statements contained in this presentation are forward-lookingstatements. Forward-loo...
Key HighlightsSuccessful Management Team•   Over 200 million ounces Ag & 10 million ounces Au discovered in the last decad...
Successful Project Finders  Board of Directors:  David Jones, M.S.  Discovered Los Filos Gold Skarn Deposit totalling 8 mi...
Credible Management TeamDarrell Rader, BBA, President, CEO & DirectorMining and exploration financer and operator. Served ...
Share Structure         Retail         15%    Management                 Institutions    and Directors                  65...
Project Portfolio  Exploration 1) Conduct First Phase Drill Program  Strategy    2) If Results indicate large Au/Ag potent...
Flagship Project – Aurena District Scale   61,910 Hectares  Gold Skarn      Mineralized trend measuring 3.5km by 1km Drill...
Aurena – Positive Drilling ResultsHighlights from holes AURC-11-001, AURC-11-002, AURC-11-005, AURC-11-006, and AURC-11-00...
Aurena - Gold in Soils                              Current                              Exploration                      ...
11
Aurena - Drilling Section                            12
Santa Marta Project                      7,100 hectare land position in southeastern Oaxaca                      State    ...
Guerrero Gold Belt (“GGB”)Over 15 Million ounces Gold discovered since1990’s…in large part via exploration modeldeveloped ...
Guerrero Gold Belt Project Portfolio   Minaurum projects cover intrusive complexes similar to known GGB Deposits          ...
Projects - Capilla Location     Eastern part of the historic Copala and Panuco              mining districts (Est. Product...
Projects - CapillaOblique view towards northeast of Copala-Panuco district. Historical productionAt Copala and Panuco was ...
Adelita Project    Copper                   Buried porphyry system measuring 3km by 1km   Porphyry                  indica...
Exploration Status and Plans 2011-2012              Conduct Initial   Fly VTEM    First Phase     Surface Work/           ...
Contact Us   Mr. Darrell Rader, President & CEOSunny Pannu, Investor Relations Manager          Tel: 778-330-0994     Webs...
Upcoming SlideShare
Loading in …5
×

Minaurum Presentation

312 views

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
312
On SlideShare
0
From Embeds
0
Number of Embeds
59
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Minaurum Presentation

  1. 1. January 2012
  2. 2. Forward Looking StatementsSome of the statements contained in this presentation are forward-lookingstatements. Forward-looking statements are not historical facts and are subject to anumber of risks and uncertainties beyond the Companys control, including, but notexclusively, statements regarding potential mineralization, exploration results,completion of work program and studies, and future plans and objectives of theCompany. Resource exploration, development and operations are highlyspeculative, characterized by a number of significant risks, which even acombination of careful evaluation, experience and knowledge may not eliminate,including, among other things, unprofitable efforts resulting not only from thefailure to discover mineral resources but from finding mineral deposits which,though present, are insufficient in quantity and quality to return a profit fromproduction.Qualified Person: Mr Stephen R Maynard, M.S., C.P.G., has acted as the qualifiedperson as defined in National Instrument 43-101 for this disclosure and supervisedthe preparation of the technical information in this release. 2
  3. 3. Key HighlightsSuccessful Management Team• Over 200 million ounces Ag & 10 million ounces Au discovered in the last decade• Two Major Takeovers - $424M West Timmins Mining, $140M Underworld ResourcesStrong Institutional Ownership• 65% owned by reputable investment funds• Average cost of shares for each institution is $0.60District-Scale Exploration Projects• Large land position in the 15M oz Au Guerrero Gold Belt• Three drill programs planned in next six monthsHealthy Balance Sheet• Strong cash balance with no debt, tight share structure 3
  4. 4. Successful Project Finders Board of Directors: David Jones, M.S. Discovered Los Filos Gold Skarn Deposit totalling 8 million ounces Au. Peter Megaw, Ph.D. Discovered MAG Silver’s 200 million ounce Ag Juanicipio deposit, Cinco de Mayo and Pozo Seco Projects, and Excellon Resources’ Platosa Mine. Richard Brissenden, CA. Founder/President of Mexican Silver producer Excellon Resources, director of Minera Andes. Michael Williams, Executive Chairman Founder/President of Full Metal Minerals, Chairman of Underworld Resources (purchased by Kinross for $139M). Lawrence Talbot Mining Lawyer with over 24 years of experience. Currently a Director of Cardero Resources, International Tower Hill Mines, Wealth Minerals and Balmoral Resources Stephan Zimmermann, Ph.D. Partner in Wehrli Zimmermann Gleixner & Partners in Zurich 4
  5. 5. Credible Management TeamDarrell Rader, BBA, President, CEO & DirectorMining and exploration financer and operator. Served as manager of CorporateDevelopment for Energold Drilling and IMPACT Silver Corp. (2003-2010) during whichEnergold expanded from 2 drill rigs to over 80 and had 22 consecutive profitable quarters,IMPACT Silver moved from early stage exploration into profitable silver production inMexico. Significant experience managing operations, arranging financing and structuringmergers and acquisitions.Stephen Maynard, M.S., Vice President ExplorationExploration geologist for over 30 years and worked with geological teams that discoveredthe 1.5-million-ounce gold Efemcukuru deposit in Turkey and Metallica Resources three-million-ounce gold Cerro de San Pedro deposit in Mexico. Significant experience withorogenic gold, volcanogenic massive sulphide and epithermal systems.Cale Moodie, CA, Chief Financial OfficerPreviously served as the CFO of both Underworld Resources prior to its acquisition byKinross Gold and Sierra Geothermal prior to its acquisition by Ram Power. Worked for anumber of years in public practice accounting at KPMG LLP’s Vancouver IndustrialMarkets Group. 5
  6. 6. Share Structure Retail 15% Management Institutions and Directors 65% 20% Symbol MGG:TSX.V Shares Issued 45,741,146 Options 3,620,000 Warrants None Fully Diluted 49,361,146 52 Week: Hi/Low C$0.95 / C$0.35 Market Cap: $16M 6
  7. 7. Project Portfolio Exploration 1) Conduct First Phase Drill Program Strategy 2) If Results indicate large Au/Ag potential, expand exploration 3) If not, Joint Venture or sell project 7
  8. 8. Flagship Project – Aurena District Scale 61,910 Hectares Gold Skarn Mineralized trend measuring 3.5km by 1km Drill Defined Drill defined 1.8km long Gold Zone Target 30% of soil and rock samples in high grade High Grade zone were: Surface >0.5g/t Au with a high of 5.7g/t Au (Soil) Samples >1g/t Au with a high of 6.4g/t Au (Rock) Target Type Prograde gold skarn deposits typically grade 6-8g/t Au and total between 2->10 M oz Au Exploration 19 Holes Drilled Plans 7000m drill program completed. 8
  9. 9. Aurena – Positive Drilling ResultsHighlights from holes AURC-11-001, AURC-11-002, AURC-11-005, AURC-11-006, and AURC-11-007 include:Hole From (m) To (m) Interval (m) Au (g/t)AURC-11-001 160.50 181.00 20.50 1.45 including 165.00 173.50 8.50 2.75AURC-11-002 39.50 47.16 7.66 1.14 including 44.33 47.16 2.83 2.22AURC-11-005 0.00 29.05 29.05 1.99 including 8.45 27.60 19.15 2.60AURC-11-006 4.50 48.00 43.50 1.01 including 4.50 13.50 9.00 1.24 and 28.50 48.00 19.50 1.64AURC-11-007 34.50 40.50 6.00 0.84 and125.20 149.00 23.80 0.99 including 134.00 147.50 15.00 1.33 9
  10. 10. Aurena - Gold in Soils Current Exploration Drilling first 4250m drilling step-out 2250m drilling 10
  11. 11. 11
  12. 12. Aurena - Drilling Section 12
  13. 13. Santa Marta Project 7,100 hectare land position in southeastern Oaxaca State Sampling of 1960’s era open-pit copper mine returned grades of 1.1% Cu over 25m 500 m strike length of exposed massive gossan along ridge crest, with values of 100’s-1000’s ppm copper Recent sampling in mine area yielded up to 1.96 g/t Au and 11.65% Cu Core drilling campaign planned for Q1 2012 13
  14. 14. Guerrero Gold Belt (“GGB”)Over 15 Million ounces Gold discovered since1990’s…in large part via exploration modeldeveloped by David Jones GGB Explorers / Summary of GGB Explorers, the size of their holdings Producers and their reserves/resources located on their GGB projects Company Hectares Reserve (Au) Resource (Au) Market Cap Goldcorp Inc. 9000 5.64M oz 2.8M oz $31B Torex Gold * 29,000 3.90M oz $765M Newstrike Capital* 29,364 $242M Cayden Resources* 17,000 80,000 oz $119M Esperanza Silver* 15,025 1.14 M oz $108M Minaurum Gold 23,900 $16M *Companies whose primary project is in the GGB 14
  15. 15. Guerrero Gold Belt Project Portfolio Minaurum projects cover intrusive complexes similar to known GGB Deposits 15
  16. 16. Projects - Capilla Location Eastern part of the historic Copala and Panuco mining districts (Est. Production 200-300M oz Ag)High Grade Average historical grade of a kilo silver per tonne Silver over widths between 1-5 metres Epithermal Mapping and sampling delineated a strike lengthVein System over 1.2kmExploration Vein system similar to Copala and Panuco except Potential without any historical mining Target In-situ zone of silver mineralization 100-200 metres below surfaceExploration Initial 1500m drill program underway Plans 16
  17. 17. Projects - CapillaOblique view towards northeast of Copala-Panuco district. Historical productionAt Copala and Panuco was from lower-middle parts of vein systems. Veins atCapilla appear to represent the top of a mineralized system. 17(43-101 Reserves and Resources listed on map consist of residual mineralization left after historical production)
  18. 18. Adelita Project Copper Buried porphyry system measuring 3km by 1km Porphyry indicated by sampling and mapping.Copper/Gold Skarn associated with porphyry was drill tested in Skarn 2010Hole From (m) To (m) Interval (m) Au g/t Ag g/t Cu %CGDD-10-001 35.65 51.8 16.15 0.84 73 1.97 includes 35.65 40.98 5.33 1.12 85 2.34CGDD-10-002 35.57 83.21 47.64 0.46 46 0.98 includes 35.57 47.4 11.83 0.30 19 1.27 JV Partner Ocean Park Ventures (“OCP:TSXV) Earning a 51% interest in the project $1.425M in work expenditures 550,000 shares, $185,000 in cash and assuming all underlying project payments 18
  19. 19. Exploration Status and Plans 2011-2012 Conduct Initial Fly VTEM First Phase Surface Work/ Second Mapping/ and Mag Drill Program Interpret Results Phase Sampling Survey DrillingAurena Q2/12Capilla Q4/11Corazonada Q1/12El Porfido Q3/12Jackie Q3/12Santa Marta Q1/12Vuelcos del Q4/11DestinoAdelita OPERATED BY OCEAN PARK VENTURES Q1/12 19
  20. 20. Contact Us Mr. Darrell Rader, President & CEOSunny Pannu, Investor Relations Manager Tel: 778-330-0994 Website: www.minaurum.com Email: info@minaurum.com 20

×