Scope Management - a broader view

  1. 1. PRATHAM “Scope Management – a broader view” MR. RAJ VIKAS SINGH MEET NUMBER TWO On 9th May 2018 at c/o The Entrepreneurship School, O-113, Arjun Market, Block E, DLF Phase 1, Sector 26A, Gururgram, Haryana 122002
  2. 2. Scope Management Presenting by Raj Vikas Singh
  3. 3. ListOf Packages S.NO Package Remarks 1 Main Civil Works 2 Electrical 3 Plumbing 4 Firefighting 5 Lifts 6 Façade 7 Door and Windows 8 Landscape 9 Wood works 10 Furniture 11 Interior Finishing
  4. 4.  Traceability Matrix is designed According to the requirements of the client . In this Matrix a Strategy is devised to meet the requirements of the project. LAYOUT OF A TRACEABILITY MATRIX  All folderCost managementRVMatrixTraceability_Matrix_At Blue bells School site.xls FUNTION
  5. 5. BOQ’S FUNCTION  Cost planning in the pre contract phase of the project  It defines the Process of execution of each and every item  It allows all the contractors to bid on the same quantities LAYOUT  Prakriti RajBOQBOQ of Prakriti School.xls
  6. 6. Amendment Sheet FUNCTION LAYOUT  All folderCost managementRVAmendment SheetAmendment Order Format.xlsx  Amendment sheets are devised to improvise the BOQ in any way.For Example:- If there is an item which is not mentioned in a BOQ , then amendment sheets are to get approval of the client.
  7. 7. RFIlogs FUNCTIONS LAYOUT  ComuRFI_LOG.xlsx  Request for Information is tool given to us which ease the implementation of the views of consultant on site.
  8. 8. Listof Mile Stones FUNCTION LAYOUT  To increase the productivity, a project is divided into milestones. Being smaller goals , these milestones helps in building morale of the team.  These are also important as they decrease the confusions and helps in focusing on the critical issues of the project
  9. 9. ThankYou ForManomavEngineers RajVikasSingh
  10. 10. THANKS For any Project Management and Engineering Consultancy Connect us at +91-120-4356006 or info@manomav.com. We are specialized in Latest Construction Monitoring Technologies, Building Information Modeling (BIM), Quantity Surveying (QS), Bar Bending Schedule (BBS), Cost; Quality; & Scheduling Audits, Material Management Software, 3D Walkthroughs, Training on Primavera/MS Project, and Home Inspection (Icons designed by AlfredoCreates.com)

×