Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

AVEVA World Conference NA - Ross Killmurray, AVEVA IE&D

2,203 views

Published on

A sneak peek at our ‘from the lab’ material showing the up and coming features, functions and products still in development, including AVEVA Everything3D, AVEVA Engineering 15.1 and the new AVEVA Electrical & Instrumentation 15.1.

Published in: Engineering
  • Be the first to comment

AVEVA World Conference NA - Ross Killmurray, AVEVA IE&D

  1. 1. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Presentation Overview A sneak peek at our ‘from the lab’ material showing the up and coming features, functions and products still in development, including AVEVA Everything3D, AVEVA Engineering 15.1 and the new AVEVA Electrical & Instrumentation 15.1.
  2. 2. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Houston, USA February 13th and 14th, 2018 Ross Kilmurray Solution Strategy Manager – Product & Solution Strategy AVEVA Digital Engineering From the lab
  3. 3. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. This presentation may include predictions, estimates, intentions, beliefs and other statements that are or may be construed as being forward-looking. While these forward-looking statements represent our current judgment on what the future holds, they are subject to risks and uncertainties that could result in actual outcomes differing materially from those projected in these statements. No statement contained herein constitutes a commitment by AVEVA to perform any particular action or to deliver any particular product or product features. Readers are cautioned not to place undue reliance on these forward-looking statements, which reflect our opinions only as of the date of this presentation. The Company shall not be obliged to disclose any revision to these forward-looking statements to reflect events or circumstances occurring after the date on which they are made or to reflect the occurrence of future events.
  4. 4. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. AGENDA ▲ Introduction to Digital Engineering & AVEVA Platform ▲ Product & solutions roadmap information : ▲ AVEVA Diagrams ▲ AVEVA Engineering ▲ AVEVA Electrical & Instrumentation ▲ AVEVA E3D
  5. 5. Globally-distributed teams now the norm Projects are changing
  6. 6. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Even bigger data
  7. 7. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Compressed schedules 7 out of 10 projects overrun
  8. 8. SaaS & Cloud Technology now must haves
  9. 9. Free your information & secure your projects with AVEVA’s Digital Engineering approach
  10. 10. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Unified Engineering & Design Platform AVEVA Bocad, AVEVA Electrical & Instrumentation Truly Integrated Engineering & Design Latest 3D design & platform technology AVEVA Outfitting, AVEVA Hull on AVEVA E3D technology Ever more functionality, integration & interoperability In all the key applications Faster, easier, more effective, access to & use of Engineering Information across the Lifecycle Support of Digital Twin/Digital Asset Exploiting new technologies SaaS & Cloud Virtual Reality & Augmented Reality KEY DEVELOPMENTS AVEVA DEVELOPMENT PHILOSOPHY
  11. 11. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. AVEVA DIAGRAMS™ AVEVA P&ID – 12.2 SCOPE
  12. 12. AVEVA DIAGRAMS 14.1.SP2 SCOPE © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Scope of the 14.1.SP2 includes : ▲ UoM improvement (in a fix before SP2) ▲ Redesign of instrument Loop user interaction ▲ Add support for multiline text annotations associated with UDA attributes. ▲ Implementation of attribute Links in Diagrams (clones) ▲ Implementation of clearing project history and individual revision history ▲ Multiport Valve development for Diagrams ▲ Windows 10 64-bit support for AVEVA Diagrams
  13. 13. AVEVA DIAGRAMS 14.1.SP2 INSTRUMENT LOOP USER INTERACTION © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
  14. 14. AVEVA DIAGRAMS 14.1.SP3 SCOPE © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Next Service Pack forecasted for Q1 2019, will focus on customer expectations, and scope should include: ▲ Process cases support ▲ UoM improvement (existing feature improvement) ▲ Hierarchy copy/paste improvement (possibility to copy hierarchy with all sub-items from one diagram to another) ▲ Bi-directional pipeline feature ▲ Snap & Glue management improvement (to be stored in Dabacon) ▲ DEXPI import / Export feature ▲ Process simulation integration ▲ Reports into diagrams
  15. 15. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. DEXPI – DATA EXCHANGE IN THE PROCESS INDUSTRY • The objective of the DEXPI initiative is to develop and promote a general data exchange standard for the process industry, covering all phases of the lifecycle of a project, ranging from specification of functional requirements to assets in operation. • Currently, the focus of the DEXPI initiative is the exchange of Piping and Instrumentation Diagrams (P&IDs).
  16. 16. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. AVEVA DIAGRAMS DEVELOPMENT ROADMAP 20182017 Q2 Q3 Q4Q4
  17. 17. AVEVA ENGINEERING™
  18. 18. ▲ Extended usage of classes within the application – less reliance on Lexicon Data Model ▲ Exploiting the benefits of a hierarchical class model. ▲ Ability to combine a flexible, customer definable data model with E&I application logic. ▲ Further Improvements - PML API for the class model - Associations - Attribute reflection - Dynamic LOV filtering - Etc… DATA MODEL | Copyright © 2018 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
  19. 19. ▲ ISM Import – extended ▲ CFIHOS & ISO15926 DATA MODEL | Copyright © 2018 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
  20. 20. DISCIPLINES AND ROLES | Copyright © 2018 AVEVA Solutions Limited and its subsidiaries. All rights reserved. ▲ DISCIPLINE AWARENESS Use of the ”Discipline” concept introduced in 14.2 will be extended to cover Lists available to users, information presented in the Project Explorer, etc. ▲ A NEW POSSIBILITY TO SET UP ROLES AND RELATED FUNCTIONAL ACCESS CONTROL Increased control of how users can use different functions: E.g. which users that can issue a deliverable. Hierarchical structure – User – Team - Discipline
  21. 21. ▲ Ability to register metadata against attributes ▲ Allows the users to filter down the display to a relevant set of attributes for: -Role / Discipline -Maturity / Project stage -Any other context (configurable) METADATA | Copyright © 2018 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
  22. 22. ▪ Ability to execute external Excel-based calculations and return the results to the Engineering Database ▪ Excel calculation sheets will be ”vaulted” in Dabacon EXTERNAL CALCS | Copyright © 2018 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
  23. 23. ▲ Notifications Allows inter-discipline workflows to be implemented ▲ Rename on import Check for non-compliant names during Excel import. Can be renamed after import. ▲ Will replace AutoNaming over time TAG MANAGEMENT SYSTEM (TMS) | Copyright © 2018 AVEVA Solutions Limited and its subsidiaries. All rights reserved. 1. TMS first available within AVEVA Engineering 2. Then across all AVEVA authoring applications 3. Finally as a service with the aim to drive 3rd party tools
  24. 24. ▲ Will be available inside the Engineer (aka Tags) module for E&I drawing creation ▲ Requires AVEVA Electrical & Instrumentation product for active editing of E&I drawings ▲ All AVEVA Engineering users will be able to view E&I drawings - Read only mode GRAPHICAL CANVAS | Copyright © 2018 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
  25. 25. ELECTRICAL AND INSTRUMENTATION ON AVEVA PLATFORM
  26. 26. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. AVEVA PLATFORM DEVELOPMENT ROADMAP From the 15.1 release onwards, AVEVA Electrical & Instrumentation will be based on AVEVA Engineering and the Dabacon platform AVEVA Electrical & Instrumentation 15.1AVEVA Engineering 15.1 AVEVA Platform (Dabacon)
  27. 27. Product will be delivered with a default Data model but could be extended using new Platform functionalities to match customer project requirements' E&I ON AVEVA PLATFORM • Default data model for fast start up that can d be extended thanks to the flexible Data Model new features • Possible to extend business logic
  28. 28. EXTERNAL CALCS
  29. 29. And the new DRAW Engine, will provide a Powerful and Efficient bi-directional graphic environment to design and produce all requested drawing types E&I ON AVEVA PLATFORM
  30. 30. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
  31. 31. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. AVEVA ENGINEERING AVEVA ELECTRICAL & INSTRUMENTATION 15.1 2018 Q2 Q4 2019 Q3Q1 Q1
  32. 32. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. AVEVA EVERYTHING3D™
  33. 33. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. AVEVA E3D Cable Design Improvements Short term ➢ Cable Design: ▪ Justification of CWAYS ▪ Automatic creation of Reducer ▪ Multi branch dressing ▪ Cable pull pits/Junction boxes Longer term ➢ Cable fill calculations and sketches ▪ Trefoil and spacing ➢ Graphical representation of cable in tray for use in 3D modelling and drawings
  34. 34. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Cable pull pits and Junction boxes
  35. 35. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Cable pull pits and Junction boxes
  36. 36. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Cable pull pits and Junction boxes
  37. 37. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Cable pull pits and Junction boxes
  38. 38. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Current Cableway Fill Area based 100 600 60% = = = = = = 300 Cableway 600 x 100 Cables 50 x 50 x 6 = 60000 mm2 = 15000 mm2 = 25% Filled
  39. 39. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. Proposed Cableway Fill Actual Rectangular 100 600 Max Fill = % of width of tray including gaps 50 100 150 Cableway 600 wide Cables 50 x 6 Gaps 50 x 2 = 600mm = 300mm = 100mm = 66.6% Filled 50 GAP 50 GAP New attribute at cableway, cascaded to cableway branch for edge spacing. i.e. reserved area e.g. EDGESP 50mm. Cannot put cable in this area. Default 0.
  40. 40. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
  41. 41. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. AVEVA E3D DEVELOPMENT ROADMAP 20182017 Q2 Q3 Q4Q4
  42. 42. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. ‘The world is changing and it is no longer cool to have islands of data…’
  43. 43. © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. THANK YOU Ross Kilmurray

×