The AREVA Group

754 views

Published on

AREVA at a glance
With manufacturing facilities in 43 countries and a sales network in more than 100, AREVA offers customers reliable technological solutions for CO2-free power generation and electricity transmission and distribution.
We are the world leader in nuclear power and the only company to cover all industrial activities in this field. Our 75,000 employees are committed to continuous improvement on
a daily basis, making sustainable development the focal point of the group’s industrial strategy. AREVA’s businesses help meet the 21st century’s greatest challenges: making energy available to all, protecting the planet, and acting responsibly
towards future generations.

Published in: Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
754
On SlideShare
0
From Embeds
0
Number of Embeds
9
Actions
Shares
0
Downloads
36
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

The AREVA Group

  1. 1. With manufacturing facilities in 43 countries and a sales network in more than 100, AREVA offers customers reliable technological solutions for CO2 -free power generation and electricity transmission and distribution. We are the world leader in nuclear power and the only company to cover all industrial activities in this field. Our 65,000 employees are committed to continuous improvement on a daily basis, making sustainable development the focal point of the group’s industrial strategy. AREVA’s businesses help meet the 21st century’s greatest challenges: making energy available to all, protecting the planet, and acting responsibly towards future generations. 33, rue La Fayette F–75442 Paris Cedex 9 Tel.: 33(0)1 34 96 00 00 Fax: 33(0)1 34 96 00 01 www.areva.com Energy is our future, don’t waste it! AREVA at a glance OUR MISSION Enable everyone to have access to ever cleaner, safer and more economical energy. OUR STRATEGY To set the standard in CO2 -free power generation and electricity transmission and distribution. • Capitalize on our integrated business model to spearhead the nuclear revival: – build one third of new nuclear generating capacities, – make the fuel secure for our current and future customers. • Ensure strong and profitable growth in T&D. • Expand our renewable energies offering. OUR PERFORMANCE IN 2007 €39.83B I +55.4% Backlog €11.92B I +9.8% Sales revenue €751M I +84.6% Operating income €743M I +14.5% Consolidated net income A4044-CorporateCommunicationsDepartment-March2008-Designandproduction:-Illustrations:H5-PrintedinFrance
  2. 2. Harvesting business synergies for maximum compe titiveness NuclearTransmission&Distribution The integrated offer serving energy professionals N°1 worldwide in the entire nuclear cycle N°3 worldwide in electricity transmission and distribution DISTRIBUTION RENEWABLE ENERGIES TRANSMISSION OTHER SOURCES OF ELECTRIC POWER FUEL FABRICATION REACTORS TRANSMISSION & DISTRIBUTION • Supply of products, systems and services for electricity transmission and distribution networks. €4.33B I 36% in sales revenue of total sales 25,248 employees €2.72B I 23% in sales revenue of total sales 16,500 employees €3.14B I 26% in sales revenue of total sales 12,577 employees FRONT END • Uranium ore exploration, mining and concentration. • Uranium conversion and enrichment. • Nuclear fuel design and fabrication. REACTORS AND SERVICES • Design and construction of nuclear reactors and other CO2 -free power generation systems. • Supply of products and services for nuclear power plant maintenance, upgrades and operations. BACK END • Treatment and recycling of used nuclear fuel. • Cleanup of nuclear facilities. • Nuclear logistics. €1.74B I 15% in sales revenue of total sales 10,638 employees SOLUTIONS FOR RELIABLE ELECTRICITY TRANSMISSION AND DISTRIBUTION CO2 -FREE POWER GENERATION SOLUTIONS MINING ENRICHMENT CHEMISTRY USED FUEL RECYCLING Figures as at Dec. 31, 2007. SERVICES
  3. 3. ❚In China, AREVA and CGNPC sign a historic agreement for the nuclear power industry. The contract, valued at €8 billion, concerns the construction of two new generation EPR reactors and the supply of all of materials and services required to operate them. Customers across the globe 2007 highlights North and South America MANUFACTURING OPERATIONS Argentina, Brazil, Canada, Chile, Colombia, Mexico, United States, Venezuela 17%of sales 13.5%of employees ❚AREVA signs an agreement to acquire Passoni & Villa, a world leading manufacturer of high-voltage bushings, present in over 60 countries. ❚AREVA and MHI confirm official start of ATMEA. This joint venture company is starting the development, licensing, marketing and selling the 1100 MW ATMEA-1 reactor, designed to answer the needs of customers interested in a mid-size power reactor market. ❚AREVA acquires a 51% stake Multibrid, a designer and manufacturer of multi- megawatt off-shore wind turbines, based in Germany. ❚AREVA applies for US NRC (Nuclear Regulatory Commission) certification of its US EPR nuclear plant design. ❚AREVA successefully bids to take over the mining company UraMin, thereby crossing a major step in the group’s plan to diversify sources and increase production. The deposits identified in South Africa, Namibia and Central African Republic should result in an annual production of more than 7.000 tons of uranium per year after 2012. Succès commerciaux Commercial successes Business development ❚In Sweden, AREVA wins two contracts, together worth around €400 million, to modernize Unit 2 of the Oskarshamn power plant and allow life extension of the Ringhals 4. ❚EDF awards AREVA a nuclear supply steam for the Flamanville EPR in France. This is the 100th reactor order for the group and the second EPR under construction in the world. ❚The British utility E.ON UK turns to AREVA for the design, supply, install and commission the onshore and offshore substations for two large wind farms. ❚In Saudi Arabia, AREVA wins a contract of more than €100 million to build a high-voltage gas-insulated substation and to refurbish 15 remote substations. ❚AREVA and SOGIN (Company for the Management of Nuclear Facilities in Italy) sign a contract worth over €250 million for the reprocessing of 235 tons of used nuclear fuel. ❚KHNP (South Korea) signs a contract with AREVA for more than €1 billion for the supply of uranium enrichment services. ❚AREVA supplies an electric supply system for ALCAN’s new production site in Canada. The contract, worth over €100 million, concerns the turnkey construction of a high-voltage conversion system to transform alternating current into direct current. ❚AREVA DONGFANG receives a letter of intend to supply 18 reactor coolant pumps to Chinese electric utility CNPEC. The contract is valued at more than €100 million. Africa and Middle East MANUFACTURING OPERATIONS Central African Republic, Côte d’Ivoire, Egypt, Namibia, Niger, South Africa, Sudan, United Arab Emirates 8%of sales 4%of employees Europe and CIS MANUFACTURING OPERATIONS Austria, Belgium, France, Germany, Greece, Hungary, Italy, Kazakhstan, the Netherlands, Norway, Poland, Russia, Slovakia, Spain, Sweden, Switzerland, Turkey, United Kingdom 56%of sales 71%of employees Asia-Pacific MANUFACTURING OPERATIONS Australia, China, India, Indonesia, Japan, Malaysia, Pakistan, Singapore, Thailand 19%of sales 11.5%of employees
  4. 4. ENVIRONMENTAL PROTECTION Limit our environmental impacts by reducing our consumption of natural resources, controlling our releases and optimizing our waste management. FINANCIAL PERFORMANCE Ensure the group’s sustainability through long-term profitable growth. INNOVATION Develop and harness best-in-breed technologies to anticipate customer needs and increase our cost-competitiveness while complying with nuclear safety, occupational safety and environmental protection requirements. CUSTOMER SATISFACTION Listen to our customers, anticipate their needs, support their growth, and increase and measure their satisfaction. GOVERNANCE Manage our operations responsibly in accordance with the group’s values, and assess and truthfully report on our performance to shareholders and all stakeholders. CONTINUOUS IMPROVEMENT Implement a continuous improvement initiative based on practices shared throughout the group. RISK MANAGEMENT AND PREVENTION Establish and maintain the highest level of nuclear and occupational safety in all of the group’s operations to preserve public and worker health, and to protect the environment. COMMUNITY INVOLVEMENT Participate in the economic and social development of the communities in which the group operates. DIALOGUE AND CONSENSUS BUILDING Establish stakeholder relations based on trust. COMMITMENT TO EMPLOYEES Promote our employees’ professional development and provide good working conditions. RESPECT FOR THE ENVIRONMENT AREVA Way, a commitment to sustainable development Sustainable development is a keystone of AREVA’s industrial strategy for achieving growth that is profitable, socially responsible and respectful of the environment. To translate this choice into reality, AREVA integrates sustainable development into its management practices via a continuous improvement initiative revolving around ten commitments. ECONOMIC DEVELOPMENT SOCIAL/SOCIETAL EXPECTATIONS

×