•Josephine Arewa •Nysira Welch •Keelyn McCoy
TODAY & FUTURE
 164.85 ft by 116.91 ft  by 138.05 ft Empty, trashy, and an     SHORTCUT OR                            WALKTHROUGH  eye ...
•More trees and                 flowers added                 •Water fountain                 •Mini playground            ...
RATIONALE      WHY ARE WE BUILDING A      RELAXATION PARK HERE
Definition of Rationale is stating your reasons for whyyou are doing something.•An area where people can come to relax•Chi...
THINGS WE WANT TO              INCLUDE:•To add benches, tress, and clean grass, for thepeople to relax and a one set play ...
How this will help the              community?•People who are waiting for the bus would not have to betired or worn out.•T...
Dedicated To               PICS of the Park
•Definition:           A system of methods used in a particular areaof study. (How are we going to build this?)
 We need money,  city support, and  grants A non-profit  organization Money from  fundraisers,  donations, and  private...
Definition:            The action of reducing the severity, seriousness, or painfulness of something.(Problems that may a...
Cutting one of the roads off while site is under construction
Put up sign using arrow to signal use of the other lanePut up sign saying “Road Closed Ahead”
The slope and angle the lot is on People have to walk  up the slope to get  through or around  the lot People walk thro...
Build a walk through the lot to keep it leveled Build a smooth run way  through the lot so it is  not hard for people to...
The bus stop is located right in front of the lot People are not going to be  able to get to the bus  stop with the  con...
Move the bus stop a block ahead or behind the construction
Clinton Square Park
Upcoming SlideShare
Loading in …5
×

Clinton Square Park

487 views

Published on

Published in: Education, Business, Sports
  • Be the first to comment

  • Be the first to like this

Clinton Square Park

  1. 1. •Josephine Arewa •Nysira Welch •Keelyn McCoy
  2. 2. TODAY & FUTURE
  3. 3.  164.85 ft by 116.91 ft by 138.05 ft Empty, trashy, and an SHORTCUT OR WALKTHROUGH eye sore MESSY, Before the bus stop FLOWERS ARE Next to mini mall or UNKEPT, TACKY, etc plaza Used as a shortcut or walkway
  4. 4. •More trees and flowers added •Water fountain •Mini playground •Benches •It will be aCLEAN PARK!!!
  5. 5. RATIONALE WHY ARE WE BUILDING A RELAXATION PARK HERE
  6. 6. Definition of Rationale is stating your reasons for whyyou are doing something.•An area where people can come to relax•Children can come to play•Area around the park is very busy•Only one bench•Six and seven people cannot fit on one bench•People walk through our lot by a short cut; dangerous.•With a nicer walk way incorporated it would not behard for people to travel up the short-cut
  7. 7. THINGS WE WANT TO INCLUDE:•To add benches, tress, and clean grass, for thepeople to relax and a one set play area forchildren to have fun.•An art wall so people could express feelingswithout vandalizing property•A walk way so people would not get injured orstruggle to make it up the large hill.
  8. 8. How this will help the community?•People who are waiting for the bus would not have to betired or worn out.•The people in the community, along with their children,need a place they can call their own.•To give back to our community to show that people do carefor them which can make them try to make a difference.•They’ll show more pride and honor in their community.•Will help make Newark better and more appealing to outsidevisitors.
  9. 9. Dedicated To PICS of the Park
  10. 10. •Definition: A system of methods used in a particular areaof study. (How are we going to build this?)
  11. 11.  We need money, city support, and grants A non-profit organization Money from fundraisers, donations, and private funding
  12. 12. Definition: The action of reducing the severity, seriousness, or painfulness of something.(Problems that may arise)
  13. 13. Cutting one of the roads off while site is under construction
  14. 14. Put up sign using arrow to signal use of the other lanePut up sign saying “Road Closed Ahead”
  15. 15. The slope and angle the lot is on People have to walk up the slope to get through or around the lot People walk through this lot on that slope and hill
  16. 16. Build a walk through the lot to keep it leveled Build a smooth run way through the lot so it is not hard for people to walk through it
  17. 17. The bus stop is located right in front of the lot People are not going to be able to get to the bus stop with the construction The construction is going to block off the bus stop so busses aren’t going to stop
  18. 18. Move the bus stop a block ahead or behind the construction

×