RESEARCH DESIGNS AND STANDARDS
ORGANISATION
(RDSO)
(SIGNAL DIRECTORATE)
S U M M E R T R A I N I N G P R E S E N TAT I O N
1
Submitted By-
AJEET KUMAR RAM
Roll No.- 1605231902
ECE Final Year [2018-19]
CONTENTS
 Introduction to RDSO
 Works of RDSO
 Signal Laboratory
 Different Labs Under Signal Laboratory
 Relay Lab
 Environment Testing Section
 Model Room
2
INTRODUCTION ABOUT RDSO
 1853 – Railway was introduced in India.
 1903 – IRCA was set up.
 1930 – IRCA was changed to CSO.
 1952 – Due to increased demand of Rail transportation RTRC was set up.
 1957 – CSO and RTRC was integrated in a single Unit named as RDSO at
LUCKNOW under the control of Ministry of Railway
3
WORKS OF RDSO
 Development of new and improved designs.
 Development and adoption of new technologies for use in RDSO.
 Development of standards for materials and products especially needed by
Indian Railways.
 Technical investigation , statutory clearance ,testing and provision of
consulting services.
 Inspection of critical and safety items for rolling stock ,locomotives,
signals,Telecommunications equipment and track.
4
SIGNAL LABORATORY
 Signal Testing Laboratory undertake testing of all types of signalling
equipments involving safety such as Signalling Relays, Block Instruments,
Power Supply Equipments, Point Machines, Signalling Cables,
Electromechanical Signalling Equipments/Components, Modern Signaling
equipments, etc.
 There is an exclusive section for environmental testing equipped with range
of climatic test facilities as per ISO 9000. These include programmable
environmental (heat & humidity), dry heat, cold, mould growth, salt mist
spray, dust, rain chambers etc.
5
DIFFERENT LABS UNDER SIGNAL LABORATORY
 Relay Lab
 Health and Safety Lab
 Power Supply Equipment Lab
 Environment Testing Lab
 Model Room
6
SIGNALLING USED IN RAILWAYS
7
8
9
ENVIRONMENT SECTION
ENVIRONMENT TEST SET UP
10
11
12
13
14
15
16
17
18
19
20
21
SIGNALLING DEVELOPMENT EQUIPMENT ( MODEL ROOM)
 The laboratory is equipped for testing of electronic and microprocessor based
equipments like
 Electronic Interlocking, Data Loggers,
 Axle Counters, Block Interface for optic fiber cable,
 LED Signals, Audio Frequency Track Circuits,
 Electronic Timers, etc.
22
23
AXLE COUNTER
24
25
Axle Counter Testing SetupModern Signaling Hall
TRAFFIC COLLISION AVOIDANCE SYSTEM
26
FEATURES OF TCAS
27
 Speed supervision
 Cab signalling
 Additional non-signalling based protections
 User friendly monitor for train drivers
 Helpful in foggy weather
 Helpful at high speed
 Continuous updates of movement authority
 Centralized monitoring of real time train movements.
THANK YOU 28
29
?

More Related Content

What's hot

RDSO PROJECT REPORT , LKO
RDSO PROJECT REPORT , LKORDSO PROJECT REPORT , LKO
RDSO PROJECT REPORT , LKOShashwat Mishra
 
INDIAN RAILWAYS TRAINING REPORT BY AMEYA VASHISHTH
INDIAN RAILWAYS TRAINING REPORT BY AMEYA VASHISHTHINDIAN RAILWAYS TRAINING REPORT BY AMEYA VASHISHTH
INDIAN RAILWAYS TRAINING REPORT BY AMEYA VASHISHTHAmeya Vashishth
 
report for rdso by shivanshu
report for rdso by shivanshureport for rdso by shivanshu
report for rdso by shivanshuShivanshu Dixit
 
Signaling in railways
Signaling in railways Signaling in railways
Signaling in railways Suresh Sunny
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship reportrahul waghmare
 
Anti-Collision Device(ACD)
Anti-Collision Device(ACD)Anti-Collision Device(ACD)
Anti-Collision Device(ACD)kamal soni
 
RDSO Training ppt
RDSO Training pptRDSO Training ppt
RDSO Training pptPooja A
 
Anti collision device
Anti collision deviceAnti collision device
Anti collision devicedhrupad1
 
Safety management in electrification of railways
Safety management in electrification of railwaysSafety management in electrification of railways
Safety management in electrification of railwaysSuresh Sunny
 
indian railway signal system ppt
indian railway signal system pptindian railway signal system ppt
indian railway signal system pptVimal Tripathi
 
OPTICAL COMMUNICATION SYSTEM IN INDIAN RAILWAYS, OFC
OPTICAL COMMUNICATION SYSTEM IN INDIAN RAILWAYS, OFCOPTICAL COMMUNICATION SYSTEM IN INDIAN RAILWAYS, OFC
OPTICAL COMMUNICATION SYSTEM IN INDIAN RAILWAYS, OFCformohitchauhan
 
Railway Industrial Training
Railway Industrial TrainingRailway Industrial Training
Railway Industrial TrainingLokesh Parihar
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive pptShrey Sandiman
 
Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Suraj Talreja
 
Railway Industrial Training Report
Railway Industrial Training ReportRailway Industrial Training Report
Railway Industrial Training ReportLokesh Parihar
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)anand prasad
 
Afc system overview
Afc system overviewAfc system overview
Afc system overviewshobhi1203
 

What's hot (20)

RDSO PROJECT REPORT , LKO
RDSO PROJECT REPORT , LKORDSO PROJECT REPORT , LKO
RDSO PROJECT REPORT , LKO
 
INDIAN RAILWAYS TRAINING REPORT BY AMEYA VASHISHTH
INDIAN RAILWAYS TRAINING REPORT BY AMEYA VASHISHTHINDIAN RAILWAYS TRAINING REPORT BY AMEYA VASHISHTH
INDIAN RAILWAYS TRAINING REPORT BY AMEYA VASHISHTH
 
report for rdso by shivanshu
report for rdso by shivanshureport for rdso by shivanshu
report for rdso by shivanshu
 
Signaling in railways
Signaling in railways Signaling in railways
Signaling in railways
 
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYSINDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
 
Anti-Collision Device(ACD)
Anti-Collision Device(ACD)Anti-Collision Device(ACD)
Anti-Collision Device(ACD)
 
RDSO Training ppt
RDSO Training pptRDSO Training ppt
RDSO Training ppt
 
Railway signal
Railway signalRailway signal
Railway signal
 
Anti collision device
Anti collision deviceAnti collision device
Anti collision device
 
Safety management in electrification of railways
Safety management in electrification of railwaysSafety management in electrification of railways
Safety management in electrification of railways
 
indian railway signal system ppt
indian railway signal system pptindian railway signal system ppt
indian railway signal system ppt
 
OPTICAL COMMUNICATION SYSTEM IN INDIAN RAILWAYS, OFC
OPTICAL COMMUNICATION SYSTEM IN INDIAN RAILWAYS, OFCOPTICAL COMMUNICATION SYSTEM IN INDIAN RAILWAYS, OFC
OPTICAL COMMUNICATION SYSTEM IN INDIAN RAILWAYS, OFC
 
Railway Industrial Training
Railway Industrial TrainingRailway Industrial Training
Railway Industrial Training
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
 
Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)
 
Railway Industrial Training Report
Railway Industrial Training ReportRailway Industrial Training Report
Railway Industrial Training Report
 
Indian Railway
Indian Railway  Indian Railway
Indian Railway
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 
Afc system overview
Afc system overviewAfc system overview
Afc system overview
 

Similar to Rdso training ppt final report

Introduction of sumico
Introduction of sumicoIntroduction of sumico
Introduction of sumicomirfanm
 
Korea certification labaratory
Korea certification labaratoryKorea certification labaratory
Korea certification labaratoryssusere25836
 
Efficiency environment and innovation
Efficiency environment and innovationEfficiency environment and innovation
Efficiency environment and innovationServizi a rete
 
Acoem Tunnel Sensors Tunnelsensorik BSA - Acoem GmbH.pdf
Acoem Tunnel Sensors Tunnelsensorik BSA - Acoem GmbH.pdfAcoem Tunnel Sensors Tunnelsensorik BSA - Acoem GmbH.pdf
Acoem Tunnel Sensors Tunnelsensorik BSA - Acoem GmbH.pdfManfred Koch
 
INTEGRATION OF SENSORS WITH KUKA ROBOT
INTEGRATION OF SENSORS WITH KUKA ROBOTINTEGRATION OF SENSORS WITH KUKA ROBOT
INTEGRATION OF SENSORS WITH KUKA ROBOTKirtimaan Srivastava
 
AeroNDI presentation_ 09-2016_pluswpos
AeroNDI presentation_ 09-2016_pluswposAeroNDI presentation_ 09-2016_pluswpos
AeroNDI presentation_ 09-2016_pluswposmassimo capriolo
 
Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020minhaj uddin khan
 
UL's guide to differentiate your wearables from competition
UL's guide to differentiate your wearables from competitionUL's guide to differentiate your wearables from competition
UL's guide to differentiate your wearables from competitionCSA Group
 
Industrial visit report all india radio and toshniwal industries
Industrial visit report all india radio and toshniwal industriesIndustrial visit report all india radio and toshniwal industries
Industrial visit report all india radio and toshniwal industriesmanish katara
 
PROJECT REPORT MECH. ENG.
PROJECT REPORT MECH. ENG.PROJECT REPORT MECH. ENG.
PROJECT REPORT MECH. ENG.SURJEET PANDEY
 
GCEM 40 series extractive gas analyser codel datasheet
GCEM 40 series extractive gas analyser codel datasheetGCEM 40 series extractive gas analyser codel datasheet
GCEM 40 series extractive gas analyser codel datasheetENVIMART
 
Ahmed_Salah-El-Din_ instrument service engineer
Ahmed_Salah-El-Din_ instrument service engineerAhmed_Salah-El-Din_ instrument service engineer
Ahmed_Salah-El-Din_ instrument service engineerahmed salah
 
Low Cost Rail Crack Inspection System
Low Cost Rail Crack Inspection SystemLow Cost Rail Crack Inspection System
Low Cost Rail Crack Inspection SystemEditor IJMTER
 

Similar to Rdso training ppt final report (20)

Introduction of sumico
Introduction of sumicoIntroduction of sumico
Introduction of sumico
 
Korea certification labaratory
Korea certification labaratoryKorea certification labaratory
Korea certification labaratory
 
Efficiency environment and innovation
Efficiency environment and innovationEfficiency environment and innovation
Efficiency environment and innovation
 
Acoem Tunnel Sensors Tunnelsensorik BSA - Acoem GmbH.pdf
Acoem Tunnel Sensors Tunnelsensorik BSA - Acoem GmbH.pdfAcoem Tunnel Sensors Tunnelsensorik BSA - Acoem GmbH.pdf
Acoem Tunnel Sensors Tunnelsensorik BSA - Acoem GmbH.pdf
 
INTEGRATION OF SENSORS WITH KUKA ROBOT
INTEGRATION OF SENSORS WITH KUKA ROBOTINTEGRATION OF SENSORS WITH KUKA ROBOT
INTEGRATION OF SENSORS WITH KUKA ROBOT
 
VTT Space technologies
VTT Space technologiesVTT Space technologies
VTT Space technologies
 
SAJ Engineering Services
SAJ Engineering Services SAJ Engineering Services
SAJ Engineering Services
 
AeroNDI presentation_ 09-2016_pluswpos
AeroNDI presentation_ 09-2016_pluswposAeroNDI presentation_ 09-2016_pluswpos
AeroNDI presentation_ 09-2016_pluswpos
 
Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020
 
Success stories. may, 2013
Success stories. may, 2013Success stories. may, 2013
Success stories. may, 2013
 
UL's guide to differentiate your wearables from competition
UL's guide to differentiate your wearables from competitionUL's guide to differentiate your wearables from competition
UL's guide to differentiate your wearables from competition
 
Industrial visit report all india radio and toshniwal industries
Industrial visit report all india radio and toshniwal industriesIndustrial visit report all india radio and toshniwal industries
Industrial visit report all india radio and toshniwal industries
 
Introduction of SUMICO Technologies
Introduction of SUMICO TechnologiesIntroduction of SUMICO Technologies
Introduction of SUMICO Technologies
 
Test Equipments
Test EquipmentsTest Equipments
Test Equipments
 
PROJECT REPORT MECH. ENG.
PROJECT REPORT MECH. ENG.PROJECT REPORT MECH. ENG.
PROJECT REPORT MECH. ENG.
 
Project 2015
Project 2015Project 2015
Project 2015
 
GCEM 40 series extractive gas analyser codel datasheet
GCEM 40 series extractive gas analyser codel datasheetGCEM 40 series extractive gas analyser codel datasheet
GCEM 40 series extractive gas analyser codel datasheet
 
Traning report _central_electronic_limited_ (1)
Traning report _central_electronic_limited_ (1)Traning report _central_electronic_limited_ (1)
Traning report _central_electronic_limited_ (1)
 
Ahmed_Salah-El-Din_ instrument service engineer
Ahmed_Salah-El-Din_ instrument service engineerAhmed_Salah-El-Din_ instrument service engineer
Ahmed_Salah-El-Din_ instrument service engineer
 
Low Cost Rail Crack Inspection System
Low Cost Rail Crack Inspection SystemLow Cost Rail Crack Inspection System
Low Cost Rail Crack Inspection System
 

Recently uploaded

US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxNiranjanYadav41
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxachiever3003
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 

Recently uploaded (20)

Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptx
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptx
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 

Rdso training ppt final report

  • 1. RESEARCH DESIGNS AND STANDARDS ORGANISATION (RDSO) (SIGNAL DIRECTORATE) S U M M E R T R A I N I N G P R E S E N TAT I O N 1 Submitted By- AJEET KUMAR RAM Roll No.- 1605231902 ECE Final Year [2018-19]
  • 2. CONTENTS  Introduction to RDSO  Works of RDSO  Signal Laboratory  Different Labs Under Signal Laboratory  Relay Lab  Environment Testing Section  Model Room 2
  • 3. INTRODUCTION ABOUT RDSO  1853 – Railway was introduced in India.  1903 – IRCA was set up.  1930 – IRCA was changed to CSO.  1952 – Due to increased demand of Rail transportation RTRC was set up.  1957 – CSO and RTRC was integrated in a single Unit named as RDSO at LUCKNOW under the control of Ministry of Railway 3
  • 4. WORKS OF RDSO  Development of new and improved designs.  Development and adoption of new technologies for use in RDSO.  Development of standards for materials and products especially needed by Indian Railways.  Technical investigation , statutory clearance ,testing and provision of consulting services.  Inspection of critical and safety items for rolling stock ,locomotives, signals,Telecommunications equipment and track. 4
  • 5. SIGNAL LABORATORY  Signal Testing Laboratory undertake testing of all types of signalling equipments involving safety such as Signalling Relays, Block Instruments, Power Supply Equipments, Point Machines, Signalling Cables, Electromechanical Signalling Equipments/Components, Modern Signaling equipments, etc.  There is an exclusive section for environmental testing equipped with range of climatic test facilities as per ISO 9000. These include programmable environmental (heat & humidity), dry heat, cold, mould growth, salt mist spray, dust, rain chambers etc. 5
  • 6. DIFFERENT LABS UNDER SIGNAL LABORATORY  Relay Lab  Health and Safety Lab  Power Supply Equipment Lab  Environment Testing Lab  Model Room 6
  • 7. SIGNALLING USED IN RAILWAYS 7
  • 8. 8
  • 9. 9
  • 11. 11
  • 12. 12
  • 13. 13
  • 14. 14
  • 15. 15
  • 16. 16
  • 17. 17
  • 18. 18
  • 19. 19
  • 20. 20
  • 21. 21
  • 22. SIGNALLING DEVELOPMENT EQUIPMENT ( MODEL ROOM)  The laboratory is equipped for testing of electronic and microprocessor based equipments like  Electronic Interlocking, Data Loggers,  Axle Counters, Block Interface for optic fiber cable,  LED Signals, Audio Frequency Track Circuits,  Electronic Timers, etc. 22
  • 23. 23
  • 25. 25 Axle Counter Testing SetupModern Signaling Hall
  • 27. FEATURES OF TCAS 27  Speed supervision  Cab signalling  Additional non-signalling based protections  User friendly monitor for train drivers  Helpful in foggy weather  Helpful at high speed  Continuous updates of movement authority  Centralized monitoring of real time train movements.
  • 29. 29 ?